ML20063P500

From kanterella
Jump to navigation Jump to search
Responds to Generic Ltr 82-16 Re NUREG-0737 Tech Specs.Tech Specs for Unit 1 Will Be Upgraded to Latest NRC Requirements & Combined W/Unit 2 Tech Specs Upon Issuance of Unit 2 OL in Mar 1983
ML20063P500
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/07/1982
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
NRC, Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737 GL-82-16, NUDOCS 8210130467
Download: ML20063P500 (1)


Text

DUKE POWER GOMPAhT P.O. Isox 33180 CIEAHLOTTE. N.O. 28242 IIAL II. TUCKER TELEPHONE vna PomasoBw, (704) 373-4531 900LBAE PSMMDEN d%

October 7, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Ms. E. G. Adensam Subj ect: McGuire Nuclear Station Docket No. 50-369

Dear Mr. Denton:

This is in ren ponse to Generic Letter No.82-16 concerning NUREG-0737 Technical Specifications. Most of the Technical Specifications proposed in the generic letter have already been incorporated for McGuire Unit 1.

Additionally, the McGuire Unit 1 Technical Specifications will be upgraded to the latest NRC requirements and combined with McGuire Unit 2 Technical Specifications upon issuance of the McGuire Unit 2 operating license, presently scheduled for March, 1983. Therefore, we propose that a separate license amendment for McGuire Unit 1 to incorporate the remaining Technical Specifications proposed in the generic letter is not necessary.

Very truly yours, fB./Myg Hal B. Tucker HBT:REH:j fw cc: James P. O'Reilly, Regional Administrator P. R. Bemis U. S. Nuclear Regulatory Commission Senior Resident Inspector Region II McGuire Nuclear Station 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

' S210130467'S21007

^

~ '

PDR ADOCK 05000369 I

P PDR

_, _