ML20063P381
| ML20063P381 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 10/05/1982 |
| From: | Roman T NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML20063P379 | List: |
| References | |
| NUDOCS 8210130350 | |
| Download: ML20063P381 (4) | |
Text
.
NIAGARA M0llAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE SEPTEMBER 1982 The Station operated during the month of September 1982 with a monthly availability factor of 0.0% and a net design electrical capacity factor of 0.0%.
The Station was shut down March 19, 1982, for a scheduled maintenance outage. The Station remains shut down due to Reactor Re-circulation system piping cracks found during Vessel flydro on March 23, 1982.
CLASS I WORK INSTRUMENTATION AND CONTROL - SEPT. 1982 WR #16381 - MG Set 172, speed control of DC Motor irratic.
(Adj. DC transfer standby pot., gain, and response time on speed control board.)
WR #18488 - Constant air monitor Rx. cl. 298 test Sn'. not indicating 3600 cpm.
(Recalibrated per N1-ICP-CAM.)
WR #15346 - MSIV 01-03 overhaul operator (Stroked and leak tested hydraulic fluid after maintenance repair.)
CLASS I WORK - ELECTRICAL - SEPT. 1982 MO #2151 - Mark I containment - new Torus Temp. Monitoring N1-MST-M1 - 125 VDC batteries, cell specific gravities and battery voltage.
MO #3070 - Diesel Gen, isolation switch, i
0130350"821006 ADOCK 0 % 220 i()
PDR e
'e-r iwr-m-r
-s
OPERATING DATA REPORT DOCKET NO. 50-220 DATE 10/5/54 COMPLETED BY TW Rornan TELEPilONE (315)343-21 0 OPERATING STATUS Nine Mile Point' Unit #1
- 1. Ur;it Name.,
Notes
- 2. Reporting Pen. d:
9/1/82 - 9/30/82 o
1850
- 3. Licensed Thennal Pow er (31Wt):
640
- 4. Nameplate Rating (Gross MWe):
- 5. Design ElectricalRating(Net A!We):
620 630
- 6. Mnimum Dependable Capacity (Gross MWe):
- 7. Slaximum Dependable Capacity (Net a!We):-
610 S. If Chan;es Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons:
- 9. Power Lesel To Which Restricted,if Any (Net 51We):
- 10. Reasons For Restrictions. If Any:
This. Month Yr to-Date Cumuistise
- 11. Ilotts in Reporting Pen. d -
720.0 6551.0 113,207 e
=
- 12. Number Of liours Resetor Was Critical 0.0 1874.0 81,305.5
- 13. Reactor Resene Shutdown llours 0.0 0.0 1,204.4
- 14. liours Generator On Line 0.0 1872.5-78,562.3
- 15. Unit Resene Shutdown liours 0.0 0.0 zu.9
- 16. Gross T...imr.! Energy Generated (MWII) 0 3,421,093 14v,374,336
- 17. Gross Electric 91 Energy Generated (MWil) 0 1,109,/vi 42,743,090 IS. Net Electric:n ener;y Generated (MN1) 0, 1,134,/55-41.392,651
- 19. Umt Senice r:ctor 0.0 28.6 69.4
- 20. Ur:H *,v:P:'. " :;. r ::s:
0.0 28.6 69.4 21 Ur.': Cap..;s Tactor (Usin;: SIDC Net) 0.0 28.4 59.9
- 22. Uni' Capacity Factor (Using DER Net) 0.0 27.9 ^
59.0
- 23. Unit Forced Outage Rate 100.0 70.8 12.8
- 24. Shutdowns Schedu:ed Oser Nest 6 Months Type. Date.as.d Dur.:tian er Each::
- 25. If Shut Ouun At End Of Report Period. Estimated Date of Startup:
Maich 1983
- 26. Unit > In Test Status (Prior to Commercial Operationi.
Forecast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY CO\\DIERCI \\ L OpCR 1110N
~
.s.
AVER-\\GE D41LV L* NIT POhER LEVEL i
I DOCKET NO.
50-220 UNIT 9 Mile' Point #1 DATE 10/5/82 _
COMPLETED BY TW Roman TELErilONE -(315)343-2110 X1383 MONTH.
S ep t..
1982 DAY.
AVERAGE DAILY POWER LEVEL DAY tMWc-NetI AVERAGE DAILY POWER LEVEL
- (MWe-Neil i
0 O'
17 2
0 gg 0
3 0
39 0
4 20 0
5 0
0 6
0 0
0 7
23
'n 0
S 33 0
9 0
25
-0 10
_0 0
26 II 0
27 0'
I n
73 n
13 b
,9 14 0
30 0
IS
'O 33 0
0 16 INSTRUCTIONS On this format.hst the arcrage daily urut power leset in Mwe. Net for each day in the rep..inny ni.
l e nearest whnic megawatt.
er
50-220 UNITSilU1 DOWNS AND POWER REDUCllONS DOCKETNO.
UNIT NAME 9 mle Pt. 11 DATE 10/5/82
-f
~
REPORT MONT11 Sept. 1982 COMPLETED llY TW Roman wbp ps<rs TELEPIIONE (315)343-2110
.X1383
.!'E 3
.5h Licensee E-r
$."o Cause & CurrectIve No.
Daie o.
3g g
,3g5 Event 5,?
j'3 S
Action to
$E 5
j@g Report
- LNG Prevent Recurrence 6
9 8206 820323 F
720 A
4 82-009 Replacement of recire piping continues TOTAL.4545 4
1 2
3 4
F: Forced Reason:
Method:
Exhibit C Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data
- D.Maintenan:e oi Test 2 Manual Scram.
Entry Sheets for Licensee C. Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D. Regulatory Restrieliori 4 Other (Explaint OL61)
E Operatur Training & Iictuse Examination F-Administre ive 5
G Operational Errun (Expl.is.)
(9/77)
Il Other (Explain)
Exhibis 1 Same Source e
4 9