Exemption from Requirements of Section IV.F.1 of App E to 10CFR50,to Allow Next full-scale Emergency Preparedness Exercise at Facility to Be Conducted on or About 820929. Evaluation Encl
ML20063N715
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/23/1982
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
Public Service Enterprise Group
Shared Package
ML20063N716 List:
References
NUDOCS 8210060433
Download: ML20063N715 (5)


Text

_ _ _ _ _ _ _ _ _ _ _ _

7590-01 UNITED STATES NUCLEAR REGULATORY COPfilSSION In the Matter of Docket Nos. 50-272 and 50-311 Public Service Electric and Gas

)

Company (Salem Nuclear Generating Station,

)

Units Nos. 1 and 2)

)

EXEMPTION I.

Public Service Electric and Gas Company (the Ticensee) and three other co-owners are the holders of Facility Operating Licenses Nos. DPR-70 and DPR-75 which authorize operation of the T:lem Nuclear Generating Station Units 1 and 2 l

(Salem or the facilities). These licenses provide, among other things, that they are subject to all rules, regulations and Orders of the Nuclear Regulatory l

(

Commission (the Commission) now or hereafter in effect.

I The facilities are pressurized water reactors located at the licensee's site in Salem County, New Jersey.

II.

Section IV.F.1 of Appendix E to 10 CFR Part 50 requires that for each site, at which one or more power reactors are located and licensed for operation, a full-scale emergency preparedness exercise shall be conducted at least annually and shall include participation by appropriate State and local government agencies.

By letter dated July 9,1982, Public Service Electric ant

Company (PSE&G) requested an exemption from certain annual exercise requirements of Section IV.F.1.

Specifically, PSE&G requested that the next full-scale emergency preparedness exercise for Salem be conducted en or about September 29, 1982 and that the anniversary date for performance of future full-scale exercises be similarly changed.

8210060433 820*/23 DRADOCK05000g l

m

7590-01 The last full-scale emergency exercise at Salem was conducted on April 9,

~

1981, and the next exercise had been scheduled for May 19, 1982.

In preparation for the formal exercise a full-scale " practice" ex?rcise was conducted on April 14, 1982. This " practice" exercise activated the PSE&G Emergency Response Facilities, the New Jersey and Delaware Emergency Centers, and field operations.

PSE&G indicates that on May 1, 1982, on contract expiration a strike against PSE&G commenced. Consequently, PSE&G, NRC-Region I, FEMA-Regions II and III, and the States of New Jersey and Delaware agreed to postpone the formal exercise until September 29, 1982.

We have reviewed the events that form the basis of the PSE&G request for exemption from the scheduled " annual" date.

Based on the fact that the " practice" exercise was determined to be satisfactory and all deficiencies have been addressed and based on the agreement of the participating agencies to delay the formal exercise to September 29, 1982 we find that this delay will not adversely affect the overall state of emergency preparedness at Salem.

For the above reasons, we conclude that the licensee's request for exemption should be granted.

III.

Accordingly, the Commission has determined that an exemption in accordance with 10 CFR 50.12 is authorized by law, will not endanger life or property or the connon defense and security and is otherwise in the public interest.

The requested exemption from the exercise requirements of 10 CFR 50, Appendix E, Section IV.F.1.a to allow the next full-scale emergency preparedness exercise to be conducted on or about September 29, 1982 is hereby granted.

Future full-scale exercises shall be scheduled to be consistent with the date of this exercise.

t i

c

________J__.

7590-01

- The Commission has determined that this exemption does not authorize a change in effluent types or total amounts nor an increase in power level and will not result in any significant environmental impact.

Having made this determination, we have further concluded that the exemption involves an action which is insig-nificant from the standpoint of environmental impact and, pursuant to 10 CFR 551.5(d)(4), that an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with this action.

'OR THE NUCLEAR REGULATORY COMMISSION c

I N/o 4

u t

De

. Eisenhut, irector Division of Licensing Office of Nuclear Reactor Regulation Dated at Bethesda, Maryland this 23rd day of September 1982.

r

- [(I o

UNITED STATES g

p, NUCLEAR REGULATORY COMMISSION g

j WASHINGTON, n. P. 20555

\\

/

CRITERIA FOR EVALUATING EXEMPTIONS TO SECTION IV.F.10F APPENDIX E OF 10 CFR PART 50 PUBLIC SERVICE ELECTRIC AND GAS COMPANY, PHILADELPHIA ELECTRIC COMPANY, DELMXWA POWER AND LIGHT COMPANY, AND ATLANTIC CITY ELECTRIC COMPANY SALEM NUCLEAR GENERATION STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Introduction By letter dated July 9,1982, Public Service Electric and Gas Company (the licensee) requested an exemption from the requirement of 10 CFR 50, Appendix E, Section IV.F.1 to allow the next full-scale emergency' preparedness exercise to be conducted on or about September 29, 1982. The licensee also requested that the anniversary date for performance of future full-scale exercises be similarly changed.

Evaluation Section IV.F.1 of 10 CFR 50, Appendix E, requires that a full-scale emergency preparedness exercise shall be conducted at least annually. This exercise shall test as much of the licensee, State, and local emergency plan as is reasonably achievable and shall include participation by appropriate State and local government agencies.

The last full-scale emergency exercise at Salem was conducted on April 9,1981 and the 1982 exercise was scheduled for May 19. On May 1, 1982 the International Brotherhood of Electrical Workers initiated a strike against PSE&G. This strike caused sufficient disruption of normal activities at Salem to result in an agrcement by the licensee, NRC - Region I, FEMA - Regions II and III and the States of New Jersey and Delaware to postpone the exerci:;e until September 29, 1982. The State of New Jersey had earlier indicated a preference for such a delay because of the State's need to participate in a similar exercise for another nuclear power station.

In preparation for the full-scale formal exercise, the licensee had conduciied a full-scale " practice" exercise at Salem on April 14, 1982. This " practice" exercise included activation of the PSE&G's Emergency Facilities, the New Jersey and Delaware Emergency Centers, and field operations. The licensee determined that the " practice" exercise was satisfactory and has addressed all deficiencies that were identified in the exercise.

l l

1

Based on the fact that a practice exercise was conducted on April 14, 1982, which included activation of onsite and offsite emergency response centers, and our belief that the most effective and beneficial annual exercises are those involving the full-scale participation of State and local government organizations, we find that the delay in performing the annual emergency preparedness exercise will not adversely affect the overall state of emer-gency preparedness at Salem and is acceptable.

Environmental Consideration We have determined that this Exemption does not authorize a change in effluent j

types or total amounts nor an increase in power level and will not result l

in any significant environmental impact.

Having made this determination, we have further concluded that the Exemption involves an action which is insig-nificant from the standpoint of environmental impact and, pursuant to 10 CFR 551.5.(d)(4), that an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of this Exemption.

Conclusion We have concluded, based on the considerations discussed above, that: (1) because the Exemption does not involve a significant increase in the proba-bility or consequences of an accident previously (/aluated, does not create l

the possibility of an accident of a type different from any evaluated previously, i

and does not involve a significant reduction in a margin of safety, the Exemption does not involve a significant hazards consideration, (2) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (3) such activities will be conducted l

in compliance with the Commission's regulations and the issuance of this Exemption will not be inimical to the common defense and security or to the health and safety of the public.