, L 6' 3 820913 8 8'6 t
J TELECOPY TO KRC VerifiedN 1536 9/13/82. NSD
'JMM:MRH:GBK:JS cc: NUC PR ARMS,1520 CST 2-C U. S. Nuclear Regulatory Commission T. G. Campbell, 1760 CST 2-C Region II E. J. Ford, NRC, SQN 101 Marietta Street, NW Shift Engineer, SQN Suite 3100 Shift Technical Advisor, SQN i
Atlanta, Georgia 30303 w
$c' N
SQRO-50-327/82107 M
r (n J~ Z Reported Under Technical Specification:
6.9.1.12.b.
t zx 5
-10 Date of Occurrence: 09/11/82 Time of Occurrence:
2200
!" x b
cyT1 "6
Technical Specification Involved:
3.6.1.8 and 3.0.3 70
')
v g]
Condition Prior to Occurrence:
O j
t-Unit 1 in mode 3 with RCS temperature and pressure at 450 F and 1600 psig.
Identification and Dascription of Occurrence:
Both trains of the emergency gas treatmeni: system (EGTS) were declared i
inoperable when the unit 1 annulus door was left open.
Apparent cause of Occurrence:
The unit 1 annulus door was lef t open in order to allow access of test instrument lines into the annulus. The EGTS was declared inoperable since it could not have m tintained the required negative pressure in the annulus.
I j
Other Related Events:
l None.
Corrective Action Taken or Planned:
The annulus door was closed and secured at 2320 hours0.0269 days <br />0.644 hours <br />0.00384 weeks <br />8.8276e-4 months <br /> on 09/11/82. The investigation on this incident will continue to determine further necessary corrective action.
O.2.uuh -
C. C. Mason Power Plant Superintendent Sequoyah Nuclear Plant