Text
'
i Northem States Power Company 414 Nicollet Mall i
Minneapolis. Minnesota 55401 1927 Telephone (612) 330-5500 l
1 February 22, 1994 Technical Specification 6.7.a.2 1
US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATINC PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Prairie Island Unit 2 Cycle 16 Startup Report In accordance with the requirements of Section 6.7.a.2 of the Prairie Island Technical Specifications, a Startup Report for Unit 2 Cycle 16 is attached.
This report is required to be submitted within 90 days following the resumption of commercial power operation following installation of a fuel that has a different design. This report is being submitted due to an increase in the uranium 235 enrichment level to 4.95 weight percent coupled with a change to Zirlo cladding material with the higher burnup Westinghouse Vantage + fuel design.
Previously the fuel was enriched to 4.2 weight percent uranium 235 and utilized zircaloy cladding with the Westinghouse OFA fuel design.
Please contact Gene Eckholt (612) 3881121 ext 4663 if you have any questions related to the information we have provided.
16.
Ro er 0 Anderson Director Licensing and Management Issues c:
Regional Administrator - III, NRC NRR Proj ect Manager, NRC Sr Resident Inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg
Attachment:
Prairie Island Startup Physics Test Report, Unit 2, Cycle 16 I
9403070375 940222 g
PDR ADDCK 05000306 p