. APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT 1 i DATE 09/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 AUGUST 82 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 -9. 17 -8.

2 -9. 18 -7.

3 -9. 19 -8.

4 -9. 20 -8.

5 -9. 21 -8.

6 -8. 22 -11.

7 -8. 23 -11.

8 -9. 24 -11.

9 -8. 25 -10.

10 -9. 26 -10.

11 -9. 27 -11.

12 -8. 28 -11.

13 -7. 29 -11.

14 -7. 30 -11.

15 -8. 31 -10.

16 -8.

1.16 - 8 8209090062 820903 DR ADOCK 05000324 PDR

j .

i OPERATING DATA REPORT DOCKET NO. 050-0325 1 DATE 09/01/82 COMPLETED BY FRANCES HARRISON

, TELEPHONE 919-457-9521 i OPERATING STATUS l

1. UNIT NAME: BRUNSWICK UNIT 1 I NOTES I
2. REPORTING PERIOD: AUGUST 82 I I '
3. LICENSED THERMAL POWER (MWT): 2436 I I ,
4. NAMEPLATE RATING (GROSS MWE): 867.0 I I e
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, I

GIVE REASONS:

4

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE *
10. REASONS FOR RESTRICTION IF ANY:

4 THIS YR TO CUMUL MONTH DATE ATIVE i

11. HOURS IN REPORTING PERIOD 744.0 5831.0 47832.0 l 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 4352.0 32617.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1
14. HOURS GENERATOR ON LINE 0.0 4224.5 30764.1

{ 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 3 16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 7541286.9 61959091.5 17.-GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 2425439.0 20426647.0 l 18. NET ELECTRICI AL ENERGY GENERATED (MWH) -6689.0 2326611.0 19630108.0

19. UNIT SERVICE FACTOR 0.0 72.4 64.3 I
20. UNIT AVAILABILITY FACTOR 0.0 72.4 64.3 l 21. UNIT CAPACITY FACTOR (USING MDC NET) -1.1 50.5 51.9 l 22. UNIT CAPACITY FACTOR (USING DER NET) -1.1 48.6 50.0
  • i 23. UNIT FORCED OUTAGE RATE 100.0 25.6 22.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATER AND DURATION OF EACH):

l 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 9/10/82

26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION)
FORCAST ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERICIAL OPERATION -------- --------

1.16 - 9  ;

APPENDIX DOCKET No.: 050-325 UNIT: Brunswick No. 1 DATE: August 1982 COMPLETED BY: Francis Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 1 Brunswick Unit No. I was shut down the entire month of August for local leak rate testing and inservice inspection outage. Estimated startup date is September 10, 1982.

There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel pool.

1

d V -

y p

f. -

DOCKET NO. 050-0U5 .

t NIT S!!UTDOWNS AND POWER REDUCTIONS UNIT NAM E NNWTN T DATE Af'c"sT 1999 COMPLETED BY PETER APPICNANI REPORT MONTil AUGUST 1982 TELEPilONE (919) 457-9521 s.

. E E

,$? 'h 455 ~ ' Licensee E,3 { *',, Cause & Corrective [

No. Date g 3g @ ,8 y 5 . Event p gg" Action to 6-

$5 $ J.cid,> Report # in R v

o . Prevent Recurrence N , .

t t

, 82-92 820909 F 744 B 4 NA XX ZZZZZZ . LOCAL LEAK RATE. TESTING AND INSERVICE .

INSPECTION (LLRT AND ISI OUTAGE IN PROGRESS) .

i I *

, . p F

I r

i I 2 3 4 -

F: Forced Reason: . Method: Exhibit C. Instructions I for Preparation of Data 5: Seheduled A li uipment t I aihue (Explain) l -M:.nu al Il Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee

, C.Itefueling 3 Automatic Scram. Event Report (LER) Fde (NUREG.

D Itegulatory Restriction 4 Continuations 0161) .

E-Operator Training & Ucense Examination 5-Load Reductions F Adndnistrative 5 .<

6-Cther Exhibit I . Same Sourec C-Operational Error (Explain) '

(9/77)  !{ Other (Explain) .

r.
  • I e e

l

, APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 '

UNIT BRUNSWICK UNIT 2 DATE 09/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 AUGUST 82 >

DAY AVG. DAILY POWER LEVEL DAY AVC. DAILY POWER LEVEL '

i (MWE-NET) (MWE-NET)

i i 1 -9. 17 -11.

l 2 -10. 18 -11.

i l 3 -11. 19 -10.

1 l 4 -10. 20 -10. I i  ;

S -12. 21 -9.

i 6 -12. 22 -9.

{

j 7 -11. 23 -9.

8 -11. 24 -9.

i

[ 9 -11. 25 -9.  ;

10 -11. 26 -9.

11 -11. 27 -8.

12 -12. 28 -9.

t 13 -12. 29 -9.

14 -12. 30 -8.

)

I 15 -12. 31 -8. l

+

16 -12.

t

[

t 1.16 - 8 b

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 09/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
2. REPORTING PERIOD: AUGUST 82 I I
3. LICENSED THERMAL POWER (MWT): 2436 I I
4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.0 5831.0 59856.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2465.2 37632.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 0.0 2384.6 35153.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 4467965.8 64465503.4
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 1415289.0 21409226.0
18. NET ELECTRICI AL ENERGY GENERATED (MWH) -7575.0 1337238.0 20526640.0
19. UNIT SERVICE FACTOR 0.0 40.9 58.7
20. UNIT AVAILABILITY FACTOR 0.0 40.9 58.7
21. UNIT CAPACITY FACTOR (USING MDC NET) -1.3 29.0 43.'4
22. UNIT CAPACITY FACTOR (USING DER NET) -1.2 27.9 41.8
23. UNIT FORCED OUTAGE RATE 0.0 17.1 17.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 9/10/82
26. UNI"S IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERICIAL OPERATION -------- --------

1.16 - 9

APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: August 1982 COMPLETED BY: Francis Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 was shut doxn the entire month of August for a refueling outage. Estimated startup date is September 10, 1982.

There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool. For the month of June and July the number of spent fuel bundles was incorrectly reported as 824. In June the core was loaded and the correct number of spent fuel bundles in the fuel pool for June and July was 424 BWR and 144 PWR.

i

(

, m_ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

t DOCKET NO. 050-0325 ,

UNIT S!!UTDOWNS AND POWER REDUCTIONS BRUSSWICK 11 l IJNIT N OIE DATE AUGUSI 1982

  • COMPLETED BY PETER APPIGNANI AUGUST 1982 REPORT MONT11 TELEPHONE (919) 457-9521 .

4 q _

..  : e .

., ,$g 3 457, ' Licensee E e, geo Cause & Corrective .

No. Date g 3g @ .5 '~ U . Event gy g3 O Action to .

H g5 u Report # mO o Prevent Recurrence -

js e g ,i O

. L 82-54 8209,09 S 744 C 4 NA RC FUELXX REFUELING OUTAGt. .

. . l-

. .i

" L: *

.  ?

~*

. r l

I 2 3 4 .

F: Forced Reason: . MethoJ: Exhibit G. Instructions ..

I S: S.;heduled A.I'iguipment l'ailure (Explain) 1 Manual . for Preparation of Data H. Maintenance of Test 2 Manual Scrarn. Lntry Sheets for Licensee

, C Itefueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Itegulatory Restriction 4 Continuations ~016I) .

E-Operator Training & Ucense Examination '

5-Load Reductions F Administrative 6.Other I

  • G-Operational Error (Explain) Exhibit I . Same Sourec ,

(9/77) li Other (Explain) -

~,. ,

r, , - . .

@ .