NMP-5150 NIAGARA MOHAWK POWER CORPORATION NIAGARA MOHAWK 300 ERIE BOULEVARD WEST i
SYR ACUSE, N. Y.13202 August 9,1982 bit. Thomas T. Martin, Ditector Division of Engineering and Technical Programs United States Naciear Regulatory Commission Region 1 631 Park Avenue King of Prussia, PA 19406 Re: Docket No. 50-220 Inspection Report No. 82-09 Ocar bit. Martin Titis refers to the routine safety inspection conducted by Messrs.
S. Riclutrds and R. Paolino of your office on June 15 tlttough 18, 1982, a,t Nine bliie Point Unit M1, Scriba, New York, of activities authorized by NRC License No. OPR-63 and to the discussions of your findings held by lit. S. Richards of your office with bit. T. Roman of our staff at the conclusion of the inspection and to subsequertt telephone discussions bebeeen D. Beckman of your office and T. Perkins and T. Roman of our staff on June 25, 1982, and June 28, 1982.
ITDI A.
10 CFR 50, Appendix B, criterion V, requires activities affecting quality to be prescribed by and accomplished in accordance with documented instructions or procedures of a type appropriate to the circumstances. The licensce's Fire Protection Quality Assur-ance Program, dated June 25, 1979, Section 3.3, requires inspec-r tions tests, administrative controls, fire drills, and training required by the Fire Protection System be accomplished in accordance with current approved instructions or procedures.
Fire Prevention Procedure No. NI-FP-2, " Welding and Cutting", requires a fire watch be stationed during welding and cutting operations.
Contrary to.the above, on June 17, 1982, Fire Protection activities were not conducted in accordance with approved procedures in that welding was observed.in the Screen and Pump ilouse without a fire watch present.
h G
Page 2 IR 82-09
RESPONSE
i 1.
The following corrective steps were taken to correc.t.the identifLed violations: The wark on the part of the contractor involved nts immediately suspended. A meeting was held with
'the station management and the affec.ted contractor informing
.the contractor.that anij far.ther violation of station ptocedures and/or policies would constitute a breach af its contract and would result in immediate work stoppage and removal from the station.
l 2.
In addition to.the actions listed above, Niagara Mohauiz Power
. Corporation has increased its surveillance of on-site contractors to assure that att fLte ptotec. tion ptocedures and policies are being followed.
3.
Due to these actions, Niagara Mohawk Power Corporation is presehttty l
in fatt compliance.-
t Very truttj tjours, i
b Mt?Ah 4 "7 Thomas E. Lempges Vice President Nuclear Generation i