LONG ISLAND LIGHTING COM PANY gg awanaw SHOREHAM NUCLEAR POWER STATION P.O. BOX 618, NORTH COUNTRY ROAD e WADING RIVER, N.Y.11792 August 27, 1982 SNRC-761 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission Washington, D.C.
20555 SER Issue No. 47 - Control System Failures Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322
Dear Mr. Denton:
As stated in section 7.7 of Supplement No. I to the Shoreham Safety Evaluation Report (SER) the Long Island Lighting Company committed to conduct a review to demonstrate that failures or malfunctions of power sources or sensors providing power or signals to two or more control systems will not result in consequences outside the bounds of the FSAR Chapter 15 analyses or beyond the capability of operators or safety systems.
In fulfillment of this commitment, enclosed are forty (40) copies of a report entitled " Control Systen Failures Evaluation Report".
This report concludes that, although new transient category events can be postulated by considering these failures or malfunctions, the net effects have been positively determined to be less severe than those of the original, conservative Chapter 15 events.
The submittal of this report to the staff should be sufficient to completely close SER Issue Number 47.
Should you have any questions, please contact this office.
Very truly yours,
}.d.dM J.
L.
Smith Manager, Special Projects Shoreham Nuclear Power Station RWG:mp Enclosure I hh
(
cc:
J.
Higgins I
I All parties 8209020255 820827 PDR ADOCK 05000322 E