ML20063H684

From kanterella
Jump to navigation Jump to search
LAR 94-003 to Licenses NPF-87 & NPF-89,revising TS to Change Frequency & Due Date of Reports for Radiological Effluents from Semiannual to Annual & from within 60 Days After Jan 1 & Jul 1 to Prior to May 1,respectively
ML20063H684
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/14/1994
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20063H686 List:
References
TXX-94044, NUDOCS 9402220121
Download: ML20063H684 (6)


Text

. f.

' EE Log # TXX-94044

" 5" File # 916 (3/4 11.0)

E- 2 916 (1.0) clo

~

3 ~--

916 (6.0) clo 10010 7t/ ELECTRIC Ref. # 10CFR50.90 10CFR50.36a M illiam J. Cahill. Jr.

Gnnop Via Presodent February 14, 1994 U. S. Nuclear Regulatory Commission Atto: Document Control Room Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 SUBMITTAL OF LICENSE AMENDMENT RE0 VEST 94-003 CHANGE FREQUENCY OF REPORTS FOR RADIOLOGICAL EFFLUENTS Gentlemen:

Pursuant to 10CFR50.90. TU Electric hereby requests an amendment to the CPSES Unit 1 facility operating license (NPF-87) and CPSES Unit 2 facility operating license (NPF-89) by incorporating the attached changes into the CPSES Units 1 and 2 Technfcal Specifications. The purpose of this request is to change the frequency and due date of reports for radiological effluents f rom " semiannual" to " annual" and f rom "within 60 days after January 1 and July 1" to " prior to May 1", respectively.

TV Electric has prepared the proposed changes to be consistent with 10CFR50.36a and requests that these proposed changes be incorporated into the Technical Specifications as described in the attachments of this submittal. Attachment I is an affidavit: Attachment 2 provides a detailed description and assessment of the proposed changes; Attachment 3 provides the proposed changes to the Technical Specifications.

In accordance with 10CFR50.91(b), TV Electric is providing the State of Texas with a copy of this proposed amendment.

TV Electric requests that the proposed changes to the Technical Specifications be approved by June 15, 1994. Upon approval of the proposed changes: TV Electric requests a 30 day implementation period following the date of license amendment issuance.

9402220121 940214 PDR ADOCK 05000445 181113 p PDR 400 N. Olive Street L.It 81 Dallas. Texas 75201 b Ils

Y f

l .

TXX-94044 Page 2 of 2 i

I Should you have any questions, please contact Mr. Connie L. Wilkerson at (214) 812-8819.

Sincerely, l ,

/

1 William J. Ca ill, Jr.

(

l l

C LW/grp Attachments: 1. Affidavit

2. Description and Assessment
3. Affected Technical Specification pages (NUREG-1468) as revised by all approved license amendments l

l c- Mr. L. J. Callan, Region IV Mr. L. A. Yandell, Ragion IV l Resident Inspectors, CPSES (2) l Mr. T. A. Bergman, NRR 1

Mr. D. K. Lacker Bureau of Radiation Control Texas Department of Public Health 1100 West 49th Street Austin, Texas 78704 i

l l

Attachment to TXX-94044 i

  • Page 1 of 1 )

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of ) '

)

Texas Utilities Electric Company ) Docket Nos. 50-445 ,

) and 50-446 (Comanche Peak Steam Electric ) License Nos. NPF-87 Station, Unit 1 & 2) ) NPF-89 AFFIDAVIT William J. Cahill, Jr. being duly sworn, hereby deposes and _says that he is Group Vice President, Nuclear Production for TV Electric, the licensee herein; that he is duly authorized to sign and file with the' Nuclear -

Regulatory Commission this License'_ Amendment Request 94-003: that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.

/'

/

ahill, Jr.

William J.[ President, Nuclear Group.Vice STATE OF TEXAS )

)

COUNTY OF SOMERVELL )

Subscribed and sworn to before me, on this 14th -day of, February ,

1994.

~

4CM.)

Notary Public PATNCtA WILSON MY COMMSSt0N EXMRES l March 16,1997

l l

l Attachment 2 to TXX-94044  !

Page 1 of 3 I DESCRIPTION AND ASSESSMENT I. BACKGROUND The final rule for reducing the regulatory. burden on nuclear licensees '

was published in the Federal Register, Volume 57, No. 169 on-August 31, 1992. This proposed amendment is consistent with the rule for reporting radioactive effluent release specified in 10CFR50.36a.

II. DESCRIPTION OF TECHNICAL SPECIFICATION CHANGE RE0 VEST This proposed license amendment changes the requirements for.the submission of the CPSES Radioactive Effluent Release Report from

" semiannually" to " annually" and the report due date from "60 days after January 1 and July 1" to " prior to May 1", respectively. Attachment 3 contains the proposed revised Technical Specification pages.

III. ANALYSIS This proposed license amendment conforms to 10CFR50.36a which allows for changing the frequency of submitting the Radioactive _ Effluent Release Report. No changes are proposed as part of this submittal that would change the method or frequency of measuring radioactive' effluents or the methodology of calculating offsite dose to the public. The proposed amendment changes the reporting frequency requirements to be consistent-with amended federal regulations.

The proposed amendment also changes the subject report' submittal'due date to allow a more reasonable time period for preparing.the Annual Radioactive Effluent Release Report. This change is consistent with the model Technical Specification proposed in the recent NRC Draft Generic Letter (GL), " Guidance for Modification of Technical Specifications to  ;

reflect (A) Revisions to 10 CFR Pert 20, ' Standards for Protection  :

Against Radiation

  • and 10 CFR 50.30a, ' Technical Specifications on-Effluents from Nuclear Power Reactors', (B) Related Current Industry Initiatives, and (C) Hiscellaneous Related Editorial Clarification."

These changes do not reduce protection to the health and safety-of the public.  ;

IV. SIGNIFICANT HAZARDS CONSIDERATIONS ANALYSIS '!

TV Electric has evaluated whether or not a significant hazards J consideration is involved with the proposed change _by focusing on the  ;

three standards set forth in 10CFR50.92(c) as discussed below: '

i

\

1

Attachment 2 to TXX-94044 l Page 2 of 3 i

Does the proposed change: l

1) Involve a significant increase in the probability or consequences  ;

of an accident previously evaluated? I The proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated. The amendment involves only changes of reporting frequency and due date requirements for radiological effluent release reporting. These changes are administrative in nature'and l do not affect safe operation of the plant: therefore, accident l probabilities or consequences are unaffected.

2) Create the possibility of a new or different kind of accident from any accident previously evaluated?

The proposed amendment does not create the possibility of a new or' different kind of accident from any accident previously evaluated.

The proposed amendment is administrative in nature and does not involve any changes to plant design or configuration. For this' l reason, it will not create the possibility of a new or different kind of accident.

3) Involve a significant reduction in a margin of safety?

The proposed amendment does not involve a significant reduction in margin of safety. The proposed amendment only changes the

, reporting frequency and due date requirements for radiological effluent release reporting. The reporting requirements for l radiological effluent releases are administrative changes:

therefore, there is not a significant reduction in the margin.of <

safety.

Based upon the results of the above evaluation,- TU Electric concludes that the proposed change does not involve a significant hazards consideration.

I V. CNVIRONMENTAL EVALUATION The proposed changes to the CPSES Technical Specification have been  !

reviewed against the criteria of 10CFR51.22 for environmental l i considerations. The proposed changes do not. involve a significant i

hazards consideration: nor increase the types and amounts of effluents that may be released offsite: nor increase the individual or cumulative occupational radiation exposures. Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in ,

l 10CFR51.22(c)(9): therefore, pursuant to 10CFR51.22(b), an environmental I i assessment of the proposed change is not required.

Attachment 2 to TXX-94044 Page 3 of 3 l

l l

VI. REFERENCE 1 l

1. NRC Draft Generic Letter (GL), " Guidance for Modification of j l Technical Specifications to Reflect (A) Revisions to 10 CFR Part j 20, ' Standards for Protection Against Radiation' and 10 CFR i i 50.36a, ' Technical Specification on Effluents from Nuclear Power l l Reactors', (B) Related Current Industry Initiatives, and (C)  !

Miscellaneous Related Editorial Clarification." FR 58:68170; December 23, 1993.

l l

l l

I l

i l

y