Submits Formal Comments on Written Exam Conducted at Facility on 940131,per Procedures Specified in
ML20063F795
Person / Time
Site: Oregon State University
Issue date: 02/02/1994
From: Andrea Johnson
OREGON, STATE OF
To: Caldwell J
NRC
References
NUDOCS 9402150175
Download: ML20063F795 (4)


Text

- 4 . - _. . . .

/

RADIA110N CEr(TER Oarcos STATE Univras Tv Radiation Center A300 Corvallis, Oregon 97331 5903 Telephone 503 737 2341 Faz 503 737 0480 February 2, 1994 U. S. Nuclear Regulator) (.tc ission Washington, D. C. 20555  ?

ATTN: James t. Caldwell, Nail Stop 10/0/22

Reference:

Oregon State University TRIGA Reactor (OSTR),

Docket No. 50-243, License No. R-106 4

Subject:

Licensing Examination for Mr. S. P. Smith, and Mr. J. S. Bae.

Gentlemen:

In accordance with the procedures specified in your letter of November 3, 1993, we would like to take this opportunity to submit formal comments on the written examination conducted at our facility on January 31, 1994. Before' addressing specific questions, we would first like to state that everyone

. involved in the exam felt that it was fair 'and reasonable. We would also like to.thank the examiner, Mr. Eresian, for his effort to put the examinees at ease.

Our comments on specific questions are given below in the required _ format.

Question A.006

a. Answer b., 0.104 delta k/k ($13.33); Reference OSTR Training Manual Volume 3, page 11.
b. 0.104 delta k/k is the correct answer; however, the conversion to dollars-is incorrect. Effective beta for the OSTR is'0.007, and therefore, 0.104 delta k/k is equivalent to $14.86. Consequently, there is no one completely correct answer. All of the other conversions to dollars are ,

also incorrect.

Our recommendation is to still accept b. as the most correct answer since '

the problem is set up in such a way that most people would.obtain a result in delta k/k rather than dollars. .

c. Reference for effective beta: OSTP, Training Manual Vol. 3. page 30.

" M 9402150175 940202 PDR- ADOCK 05000243 V PDR g0 0J' i0

Duestion A.017

a. Answer a., Rate of power rise to 1 MW is slower than assumed by the procedure; Reference OSTROP 8.0, step 8.4.E.
b. This is the only poorly worded question in the examination. We feel that '

it is written in a very unclear and confusing manner. Each of the answers seems to assume that there is a distinction between measured values of a parameter and the values used in the calculation. In fact, .

they are the same. In other words, when a power calibration is performed readings are taken of the initial' bulk water temperature, the final bulk ~

water temperature, and the length of time at power. These values are then substituted into the equation to determine if the actual power level is above or below the indicated power. Therefore, to talk about, for-example, the " actual time of power rise" and the "value used in the-calculation" as two separate values is inappropriate and confusing. The same is true of the temperatures.

Our recommendation is to delete this question from the examination.

c.

Reference:

OSTROP 8.4 describes the procedure for performing a power calibration, including taking the readings and substituting them'into the equation given to determine the actual power level.

Question B.001

a. Answer c.,1000 degrees C; Reference Technical Specification 2.1, page 6.
b. While this reference is still in the Technical Specifications,'the OSTR o has not operated with any standard fuel elements since 1976 when the reactor was refueled with FLIP fuel. In additian, we do not have any .

standard fuel elements on site, and therefore do not have the possibility -'

of even using a mixed core. It is for this reason that all of.our .

training has related to FLIP fuel, and the FLIP safety limit is the one that we have emphasized because that is the one the operators need to know.

Our recommendation is to delete this question from the examination as being irrelevant to the operation of the OSTR.

c. References for the non-availability of standard fuel elements include the fuel Element History Log, and the Special Nuclear Material. accountability log. '

Ruestion B.014

a. Answer a., Ventilation system _ inoperable; Reference Technical Specification 3.7.1, page 14.
b. This answer is incorrect. There are two correct answers, b. and c.

Our recommendation is to accept either b. or c. as correct. -

e . - -

y ,

i

c. Reference for a. being incorrect: Technical Specification 3.7.1, page 14. t Reference-for b. being correct: Technical Specification 5.2.d, page'25, which states that the reactor "shall not be operated at power levels ,

exceeding 1 kW with a core lattice position vacant...". This clearly infers that at power levels less than or equal I kW it is acceptable to -

operate with a vacant core lattice position.

Reference for c. being correct: Technical Specification 3.8.g, page 16. '

This states that "the total inventory of iodine isotopes 131 through 135 in the experiment is no greater than 1.5 curies." Therefore, 1.5 curies ;

is acceptable.

t Ouestion B.018 .

a. Answer b., "is required to be present at the complex only during the initial startup each day or at the initial startup of a new experiment.":

Reference OSTROP 6.6.B.1, page IV.6.19. ,

b. While the wording in answer b. is a direct quotation from the referenced '

page, in practice there are at least two other times when the reactor supervisor is required to be present at the facility, which is contradictory to the "only" in answer b.

1 OSTROP 3 on page IV.3.1 states that the " senior reactor operator in charge will review the checklist form and affix his signature when the '

shutdown checks have been satisfactorily completed." The terms " senior reactor operator in charge" and " reactor supervisor" are synonymous-in the OSTR procedures and have been used interchangeably over the years. i Therefore, the reactor supervisor must also be present in the facility to sign off on the shutdown checklist and the console log book.

In addition, OSTROP 4.7.C on page IV.4.12 states that."Each and every  :

time an unplanned scram occurs, the console operator will inform the Reactor Supervisor. The console operator will not restart the reactor without the permission of the Reactor Supervisor and will obtain his-initials in the console log book." Therefore, this is another instance in which the reactor supervisor has to be present in the facility.

OSTROP 1.2.c has a similar statement.

Our recommendation is that this question be deleted from the examination because there is no correct answer.

c, References giving other times the reactor supervisor must be present ,

include: OSTROP 3, page IV.3.1, OSTROP 4.7.C on page IV.4.12 and OSTROP.

1.2.c, page IV.1.2.

. Dgestion B.020 1

a. Answer a., Reactor Power; Reference OSTROP 4.2.18 page, IV.4.4.  :
b. The referenced procedure states correctly that "if the reactor is to be

or 4

operated at a power of 100 kW or greater, turn on the primary and secondary cooling systems." However, the parameter which is practically - -

used to determine whether the secondary water cooling systems are used or not is the bulk water temperature, i.e. answer b.  ;

The bulk water temperature is the parameter which directly determines how >

much, if any, secondary cooling is necessary. Clearly, this- is normally a function of the reactor power,'but it is also a- function of. the ambient outside temperature. The operator watches the bulk water temperature and -- ;

adjusts the cooling requirements accordingly.~ .The procedure tells the-  :

operator to turn on cooling capacity if the reactor is to be operated j above 100 kW because at those power levels it is usually necessary.  :

liowever, there are various procedures, which allow the~ reactor to be - 1 operated without primary and/or secondary cooling (such as reactor. power calibration), but in each case the crimary limiting parameter is the bulk-water temperature and not the reactor power. Further evidence for this '

is given in Technical Specification 3.7.2.b on page 14, which requires the water temperature not to exceed 49 degrees C. >

Our recommendation is that answer b. be accepted as a correct answer in. ,

addition to answer a.

l t

c. The reference for the primacy of water temperature is Technical ~

Specification 3.7.2.b on page 14. OSTROP 8 is the power calibration '

procedure which is one example of when the power level exceeds 100 kW- _t without the primary or secondary cooling system operating.

We appreciate the opportunity to submit these comments. ~Also let me once again emphasize that we do not want these comments to be regarded in any way a as an indication of our dissatisfaction with the written. examination'. ~We- M

- merely wish to ensure that the examination is as fair as possible, by i eliminating areas of possible ambiguity. Thank you for considering our -

recommendations.

Yours sincerely,- 1 d1NL. _

1 w www w w 1

A. G. Joh son-Direc cc': Non-Power Reactor, Decommissioning, and Environmental ' Projects l Directorate, USNRC, Washington, D. C. 20555 ATTN:~Mr._Al Adams

~

Regional _ .idministrator, USNRC, Region V, Walnut Creek, CA vtfocument. Control Room, USNRC, Washington, D.C. 20555 l Oregon Department of Energy, Salem, Oregon ATTN: Mr. D. Stewart-Smith Prof. S..E. Binney, Chairman, Reactor Operations Committee ,l Prof. B. Dodd, Reactor Administrator .

T. V.' Anderson, Reactor Supervisor S. P. Smith, Senior Reactor 0perator trainee J. Bae, Reactor Operator trainee f