Monthly Operating Rept for June 1982
ML20063E310
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/06/1982
From: Jackie Cook
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20063E304 List:
References
NUDOCS 8207130381
Download: ML20063E310 (7)


Text

-

/

OPERATING DATA REPORT DOCKET NO. 50-333 DATE JULY 1982 COMPLETED BY J. Cook-TELEPHONE (11'n %7 '1R40 OPERATING STATUS FitzPatrick Notes

1. Unit Name:
2. Reporting Period: 820601 R?nA'tn
3. Licemed Thennal Power plWt): 2436 883
4. Nameplate Rating (Gross MWe):

821

5. Design Electrical Rating (Net MWe):

830

6. Maximum Dependable Capacity (Gross MWe):

810

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratir.gs (items Number 3 Through 7) Since Last Report, Give Reasons:

NONE NONE

9. Power Level To Which Restricted,if Aliy (Net MWe):
10. Reasor.s For Restrictions,if Any:

This Month Yr. to Date Cumularise 720 4343 60720 II. Hours In Reporting Period 42321.5 720 2770.3

12. Number Of Hours Reactor Was Critical 0 n 0 _
13. Reactor Reserve Shutdown Hours 2684.5 41128.1 720
14. Hours Generator On-Line 0 o 0
15. Unit Reserve Shutdown Hours 84480322 1737288 6079008
16. Gross Thermal Energy Generated (MWH) 598960 2090620 28851230
17. Gross Electrical Energy Generated (MWH) 581515 2028175 27932905

! 18. Net Electrical Energy Generated (MWH) 61.8% 67.7%

100%

19. Unit Service Factor 100% 61.8% 67.7%
20. Unit Availability Factor 61.0%

99.7% 57.7%

21. Unit Capacity Factor (Using MDC Net, 98.4% 56.9% 56.0%
22. Unit Capacity Factor (Using DER Net) 1.0% 16.1%

0.0%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

NONE

25. If Shut Down At End Of Report Period Estimated Date of Startup:

Forecast Achiesed

26. Units in Test Status (Prior o Commercial Operationi:

INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIA L OPERATION 8207130381 820706 PDR ADOCK 05000333 R pop _ . _ . -

AVERACE DAILY UNIT POWER LEVEL g DOCKET NO. 50-333 JAFNPP UNIT DATE JULY 1982

- COMPLETED BY TbLEPHONE (315) 342-3840 JUNE 1982 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe Net) (MWe-Net) 812 37 813 1

810 g 811 2

3 810 19 812 811 20 815 4 .

815 5 815 21 815 22 814 6

814 7 815 23 g 815 24 813 _

814 807 9 25 10 814 26 796 809 27 812 II 709 12 811 28 13 813 29 787 All 808 14 30 IS 813 3, 013 16

SUMMARY

The FitzPatrick plant operated at or near full power for this reporting period.

8

- , , , - , , - --c-

1<

m e

uOtyuv c2q w. . -C4OO$2" >2C O**M 3mCC0dO2m

. h4h.

C2M2>Em L>+W@% 0 0

=yWm L &W0N OOr5 fm4 Owe <- L Cr pm,OnH3o2w: g3y dj$=oZm C v W&NIWg+C 3r t

f o n n) s-n ogt n c -

r [o a m4 e$

n e nE a P n: a 7" l

e iosr o di a e e e o

?. OEe. p ta u s ot M nE tsd p d -

>C E3 C-y r o a h tuR yo o T uH e SC mC D( R M

teh n S w M4c = C o 3" as~ Fc.E;2e."

o D

_ 9e w A

,. 1

. : c.e.C- Fay 3. . I2 wee,- m!"-5O*g:R:.g. * .

w. mc.wnc. enc > mc.c m3ns 1 :

'u=. Ea 7_i s,f EuaeE.

7 y;ehtg- ACs." -

  • ru 3 "8mn" c Ha - d 2 E rRn=Xn mE x !-

WEumeE

>c nmO*3*

9xamcnf" mX~ x*2: nrmN" 9=* ~2C%mO.

9xaoc a " cq Ma,1n S - .

PO:.c3Egm5"O ar.n f=-

O *C 2

, m O .a~.u ~ q E3 S > Ce.a :n mME =3".Ea a >c3: #.C.7n . w 0 O,n,uCc:t..

r'. E m4_ss- mf. I m3 F. m :=r.4 m

. .~ mxm~ c' '

o.wn.

9

li t1 l- ll t;  ;' ,'

N POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERxIING EXPERIENCE JUNE, 1982 The unit operated at near full thermal power during this entire reporting period.

At the end of the reporting period the unit is operating at approximately 840 Mwe.

f I

t 1

f

. I e  ;

F

. - ~ - - - - -, - - - ,. , ,

PO'WER AUTHORITY OF THE STATE OF NEW YORK i JAMES A. FITZPATRICK NUCLEAR POWER PLANT ,

i i MAINTENANCE

SUMMARY

i

! JUNE 1982 i

i I

CAUSE OF RESULTS OF ACTION TAKEN REPA7 WORK REQUEST # TED

OATE SYSTEM MALFUNCTION MALFUNCTION COMPONENT # CURR S Defective pot Replaced pot 20335 Increased
06/21 02 n strain gauge an strain gauge 48 .

FT-110D frequency 17747 Drive gears Chart not Aligned and

!05/28 iI 02-3 LR-98 OPS misaligned advancing tightened gears .5 Replaced switch 21797 Out of tech spec U #"*

06/04 02-3 PS-52A JIC Defective switch tolerance p_ 9 I' 17612 Possible seal Performed TDR 06/15 07 LPRM-44-45B OPS leakage

  1. ' '"E "

and IMP-7.22 2 ii

!i 17641 Possible seal Reading down Performed TDR

, 07 LPRM-36-05B OPS leakage scale and IMP-7.22 2

l 06/15 l! 18514

}l06/15 6

'l). 20306 Possible seal er rmed TDR LPRM-44-45B OPS Drifting high and IMP-7.22 2 06/17 07 leakage I

i 20331 Performed I/V j 06/16 07 LPRM (All) . OPS Routine check LPRM check and T,DR on LPRM 24 l 20339 Possible seal Performed TDR 06/M 07 LPRM-44-45B leakage "8 and 1/V trace 2 l

0406 Logic not Replaced card Defective TIP -

06/15 07 NM-131-4D OPS drive card working correctly and checked 1

j 20467 Trip inhibit 06/28 07 RBM "A" OPS Old age bulb burned out Replaced bulb 2 1

POWER AUTHORITY OF THE STATE OF NEW YORK

, JAMES A. FITZPATRICK NUCLEAR POWER PLANT

~

MAINTENANCE

SUMMARY

JUNE 1982 i

ACTION TAKEN REPAIR WORK REQUEST # CAUSE OF RESULTS OF TIME SYSTEM 0 MALFUNCTION TO PRECLUDE DATE COMPONENT # MALFUNC1%ON RECURRENCE HOURS Sticking select "B" RBM won't Checked system

~

20471 06/28 07 OPS relay operate for bad relay 18318 Switch needs '

PS-011 OPS Condensor calibration Calibrated 20 04/24 13 Replaced lamp 15620 Old lamp burnt Lamp does not and removed 5 RIS-431A out light.

06/17 17 Z Recorders don't* Calibrated both 18508 ma c wi hin 10% 0 RR-456 A & B OPS Out of calibration recorders 06/08 17

"*"*d' 18650 Dirty and out of lubricated, and 6 Pen is erratic 06/09 17 RR-433 SEC calibration calibrated 16742 Air in Indicator is not Calibrated '

20 DPIS-506 OPS transmitter indicating indicator 17 06/17 Test equipment Calibrated 21775 Out of 1 sal and JIC calibration 28 06/29 27 PT-ll5Al i ation 17617 Constant alarm Performed 06/03 46 FIS-102B . OPS Instrument drift all the time ISP-23-1 3 "1 ""# # "

17645 n c f* Calibrated per 05/28 93 LI-101AR OPS Clutch slippage e

F-IMP-93.5 2 20304 06/17 93 D-Diesel OPS Broken gauge Broken Replaced gauge- '2

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT '

JUNE 1982 -

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

0 DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE 0 T 5/20 10 17705 SURVEILLANCE Rusted away cotter pin Replaced carbon steel cotter pin 21 .

3 RHR-14A with stainless

  • 5/26 08 17732 OPS Broken nipple and Replaced nipple and solenoid 20 Refuel leaking solenoid bridge S/26 27 17704 OPS Valve operator frozen Freed up and lubricated 26 AOV-126A 1 5/29 10 17649 SURVEILLANCE Water in limitorque Rewound motor at G.E. 18 j MOV-33A I 5/24 71 15272 VISUAL Missing reset button Replaced reset button assembly 2 a

MCC-153 assembly 5/18 88 16223 P.M. None Performed annual certification 4 CR-2 inspection 5/18 17 17619 AUDIO Bad roots blower Replaced roots blower 3 RIS-452A bearings 5/18 08 17633 VISUAL Leaking grapple Replaced cylinder 8 Retuel operating cylinder

{ ,

bridge 5/18 27 21846 OPS Set pressure too low Removed, reset, tested, 8 l SV-ll4B reinstalled

~

5/11 76 17505 OIL SAMPLE Leaking fitting in Tightened fittings 42

.s P-1 gear drive i

E

_ _ . _ _ _ _ _ _ - -