Umstick Centrating Station
~
T.S.6.9.1.6 PECO ENERGY n= -a c-~
PO Box 2300 Sanatoga. PA 19464-0920 January 13, 1993 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Subject:
Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of December, 1993 forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours,
' ins h $% Vl James A. Muntz Director - Site Engineering jjm Enclosures cc:
T. T. Martin, Administrator, Region I, USNRC (w/ enclosures)
N.
S. Perry, USNRC Senior Resident Inspector LGS (w/ enclosures)
D.
R. Helwig, Vice President, Limerick Generating Station
-i 1
9401250311 931231 F
/
PDR ADOCK 05000352 %
[
l R
,PDR i
)
c
Docket No. 50-352 Attachment.to Monthly Operating Report for December 1993 Limerick Generating Station Unit 1 December 1 through December 31, 1993 I.
Narrative Summary of Operatina Experiences Unit 1 began this operating period at 50% of rated thermal power (RTP) with control rod maintenance work ongoing.
On December 1, 1993 at 0143 hours0.00166 days <br />0.0397 hours <br />2.364418e-4 weeks <br />5.44115e-5 months <br /> power was increased to 71%
RTP.
At 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br /> power was reduced to 61% RTP to support replacement of cabling for the Main Turbine #3 Control Valve.
Power was restored to 73% RTP on December 2, 1993 at 0552 hours0.00639 days <br />0.153 hours <br />9.126984e-4 weeks <br />2.10036e-4 months <br />.
On December 3, 1993 at 0345 hours0.00399 days <br />0.0958 hours <br />5.704365e-4 weeks <br />1.312725e-4 months <br /> power was restored to 90%
RTP following control rod maintenance work.
Unit 1 ended this operating period in end-of-cycle coastdown at 80% RTP.
II.
Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of~ December.
d h
>+
.-i
.W t.j4s-AVERAGE DAILY UNIT POWER. LEVEL T
DOCKET NO. 50 - 352 UNIT LIMERICA UNIT 1 DATE JANUARY 11, 1994 t
JOHN J.
MCMENAMIN REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3794 MONTH DECEMBER 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (wwE. NET)
(MWE-NET) 1 655
'17 862 2
709 18 854 3
907 19 852 4
916 20 847 i
5 906 21 842 6
915 22 838 7
909 23 B35 8
902 24 829 i
9 899 25 825 10 890 16.
820 11 890 27 817 t
12 887 28 813 13 881 29 802 14 873
'30 809 15 868 31 797 i.
16 864 t
k uw <-
e v.-r-v e.
--w:--
a n
r,-
+
a nu v,
a
OPERATING DATA REPORT a
DOCKET NO. 50 - 352 DATE JANUARY 11 1994 COMDLETED BY
~
JOHN J.
MCMENAMIN REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3794 OPERATING STATUS
_u' 1.
UNIT NAME: LIMERICK UNIT 1 l NOTES: THERE WERE TWO LOAD REDUCTIONS i
i 2.
REPORTING PERIOD; DECEMBER. 1993 GREATER THAN 20% THIS MONTH r
3.
LICENSED THERMAL POWER (MWT) 3293 TO PERFORM CONTROL ROD I
4 NAMEPLATE RATING (GROSS MWE):
1138 HYDRAULIC CONTROL UNIT WORK 5.
DESIGN ELECTRICAL RATING (NET MWE):
1055 AND TO REPLACE CABLING FOR 6-. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1092 THE MAIN TURBINE CONTROL VLV.
7 MAXIMUu DEPENDABLE CADACITY (NET MwE):
1055 8,
IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER 3 THROUGH~7) SINCE LAST REPORT. GIVE REASONS:
' i i
t 9.
POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
i
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH VR-TO-DATE CUMULATIVE j
- 11. HOURS IN REPORTING PERIOD
- 744 8.760 69.384
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8.649.9 56.199.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 744.0 8.626.6 55.184.8-
- 15. UNIT RESERVE SHUTDOWN HOUR 5 0.0 0.0 0.0 4
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.068.046' 27.717.294 169.450.759
- 17. GROSS ELECTRICAL ENERGY GENERATED-(MWH) 656.880 9.065.900 55.042.040 -
...----.-~..
- 18. NET ELECTRICAL ENERGV. GENERATED (MWH) 631.513 8.745.473 52.785.990 PAGE 1 OF 2 i
e m
- ".;-__m_L___
-m
.a f-m a=*
- A m-s-e-
k-
=
w e
VWs
-*Wf a v wm a
+.
w L
.m.
OPERATING DATA REPORT (CONTINUED)
' DOCKET NO.
50.- 352
~
DATE JANUARY 11, 1994 THIS' MONTH VR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 98.5 79.5
- 20. UNIT AVAILABILITY FACTOR 100.0 98.5 79.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 80.5 94.6 72.1 j
- 22. UNIT CAPACITY FACTOR (USING DER NET) 80.5 94.6 72 1 1
c
- 23. UNIT FORCED OUTAGE RATE O.0 1.5 4.7 k
24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
STH REFUELING OUTAGES 1/29/94: 45 DAYS 9
4
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
I
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 1
.t.
INITIAL ELECTRICITY MID' APRIL 85 4/13/85 COMMERCIAL OPERATION IST QTR 86 2/01/86 I
4 PAGE 2 CF 2 i
l i
.t l
l s
w v
-w.
w,..
.s.++e
~
n
-n,--
s v,n.-
.e.-,.-.-
~,
e +
s v
,x
+A4 e.
4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352' UNIT NAME LIMERICK UNIT 1 DATE JANUARY 11, 1994 REPORT MONTH DECEMBER. 1993 COMPLETED BY JOHN J.
MCMENAMIN REPORTS ENGINEER 4
SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3794 l
l l
METHOD OF LICENSEE SYSTEM CouPONENT CAUSE AND CORRECTIVE
-l ITYPE! DURATION REASON SHUTTING DOWN NO.i DATE l (1)) (HOURS);
(2)
REACTOR (3)
EVENT CODE CODE ACTION TO REPORT s (4)-
(5)
PREVENT RECURRENCE I
30 931201 S
000.0 B
4 N/A RB CONROD REACTOR POWER REMAINED AT 50% TO CONTINUE CONTROL ROD HYDRAULIC CONTROL UNIT MAINTENANCE THAT HAD BEGUN AT THE END OF THE PREVIOUS MONTH.
31 931201 5
000.0 i
B 4
N/A HA VALVEX REACTOR POWER WAS REDUCE 0 TO 61% TO l
ALLOW FOR THE REPLACEMENT OF CABLING FOR THE MAIN TURBINE s3 CONTROL VALVE.
l t
4 (1)
(2)
(3)
(4)
F - FORCEO REASON-METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN)'
1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D-REGULATORY RESTRICTION 4. OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE Y
d t
e b
t e
en&
,u_a w
v~~+y
/
u.e -
i=%-i ww-
Docket No. 50-353 Attachment to Monthly Operating Report for December 1993 Limerick Generating Station Unit 2 December 1 through December 31, 1993 I.
Narrative Summary of Operatina Experiences Unit 2 began this operating period at 100% of rated thermal power (RTP).
On December 12, 1993 at 1340 hours0.0155 days <br />0.372 hours <br />0.00222 weeks <br />5.0987e-4 months <br /> power was reduced to 92%
RTP for Main Turbine Valve Testing.
Power was restored to 100% RTP at 1551 hours0.018 days <br />0.431 hours <br />0.00256 weeks <br />5.901555e-4 months <br />.
On December 16, 1993 at 1150 hours0.0133 days <br />0.319 hours <br />0.0019 weeks <br />4.37575e-4 months <br /> power was reduced to 98%
RTP for a control rod pattern adjustment and then restored 1
to 100% RTP shortly thereafter.
Unit 2 ended this operating period at 100% of rated thermal power.
II.
Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of December.
l 1
r
~.
~..
1 i.
AVERAGE DAILY UNIT POWER LEVEL
-DOCKET NO 50 - 353 n
UNIT LIMERICK UNIT 2 DATE JANUARY 11, 1994 JOHN J. MCMENAMIN REPORTS ENGINEER SITE-ENGINEERING LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3794 MONTH OECEMBER 1993 DAY AVERAGE DAILY power LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MwE-NET) i 1077 17 1072 1
2 1070 18 1070 t
3 1076 19 1072 4
1065 20 1069 5
1066 21 1070 6
1071 22 1071 l
7 1072 23 1073 8
1073 24 1072..
9 1072 25 1074 to 1068 26-1072 11 1070 27 1072 12 1064 28 1076 t
13 1071 29 1073 14 1070 30 1076 15 1069 31 1074 1E 1070
{
OPERATING DATA REPORT DOCKET NO. 50 - 353 DATE JANUARY 11 1994 4
COMPLETED BV a
JOHN J.
MCMENAMIN REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION.
TELEPHONE (215) 327-1200 EXTENSION 3794 OPERATING STATUS 1
UNIT NAME: LIMERICK UNIT 2 NOTES: THERE WERE NO LOAD DROPS l
2.
REPORTING PERIOD:
DECEMBER, 1993 GREATER THAN 20% THIS 3.
LICENSED THERMAL POWER (MWT):
3293 l
MONTH.
4 NAMEPLATE RATING (GROSS MWE):
1138 5.
DESIGN ELECTRICAL RATING (NET MWE):
1055 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1092 7.
MAXIMU"4 DEPENDABLE CAPACITY (NET MWE):
1055 B.
IF CH.NGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
t 7
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE 11 HOURS IN REPORTING PERICD 744 8.760 34.896
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744,0 7.401.8 30.642.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 744.0 7.290.2 29.946.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.448.197.
23.338.931 95.305.081
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)-
823.080 7.739.420 31.492.526
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 797.041 7.467.645 30.330.692 PAGE 1 OF 2
=
OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 353
__ -_-~___.-----_.._____----
DATE JANUARY 11 1994 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 83.2 85.8
- 20. UNIT AVAILABILITY FACTON 100.0 83.2 85.8
- 21. UNIT CAPACITY FACTOR (USING MOQ, NET) 101.5 80.8 82.4 t
- 22. UNIT CAPACITY FACTOR (USING DEh* NET) 101.5 80.9 82.4
- 23. UNIT FORCED CUTAGE RATE O.0 2.4 4.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH}
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 26. UN!TS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FOAECAST ACHIEVED INITIAL CRITICALITY C8/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89 09/01/89 COvvERCIAL OPERATION 02/01/90 01/08/90 PAGE 2 OF 2
UNIT SHUTDOWNS AND POWER REDUCTIONS OOCKET NO. 50 - 353
~
w UNIT NAME LIMERICK UNIT 2-'
DATE JANUARY 11, 1994 1
RE' PORT MONTH DECEMBER. 1993 COMPLETED BV JOHN J.
MCMENAMIN REPORTS ENGINEER l
SITE ENGINEERING LIMERICK GENERATING STATION -
TELEPHONE (215) 327 1200 EXTENSION 3794 I
l METHOD OF LICENSEE
' SYSTEM COMPONENTl CAUSE AND CORRECTIVE TYPE!DURATIONjAEASON SHUTTING DOWN EVENT CODE
' CODE l ACTION TO
'NO.
DATE (1)! (HOURS))
(2)
REACTOR (3)
REPORT *
(4)
(5) i PREVENT RECURRENCE I
I i
i I
.l 46 931212 l 5 000.0 l
B 4
N/A HA INSTRU l REACTOR POWER WAS REDUCED TO 92% FOR l
[
MAIN TURBINE VALVE TESTING.
6 1
1 47 931216 S
000.0 8
4 N/A RB CONROD REACTOR POWER WAS REDUCED TO 98% FOR l
A CONTROL ROD PATTERN ADJUSTMENT, l
-_-.. }
l
't 1
I i
(1)
(2)
(3)
(4)
F F - FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S-SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER) f D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE l'!