Umstick Centrating Station
~
T.S.6.9.1.6 PECO ENERGY n= -a c-~
PO Box 2300 Sanatoga. PA 19464-0920 January 13, 1993 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 ,
Subject:
Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of December, 1993 forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours,
' ins h $% Vl James A. Muntz Director - Site Engineering jjm Enclosures cc: T. T. Martin, Administrator, Region I, USNRC (w/ enclosures)
N. S. Perry, USNRC Senior Resident Inspector LGS '
(w/ enclosures)
D. R. Helwig, Vice President, Limerick Generating Station
-i 1
9401250311 931231 PDR R ADOCK 05000352
,PDR F
/[ -
l l
$ i -
c
) ,
. Docket No. 50-352
.. Attachment.to Monthly Operating Report for December 1993 Limerick Generating Station Unit 1 December 1 through December 31, 1993 I. Narrative Summary of Operatina Experiences Unit 1 began this operating period at 50% of rated thermal power (RTP) with control rod maintenance work ongoing.
On December 1, 1993 at 0143 hours0.00166 days <br />0.0397 hours <br />2.364418e-4 weeks <br />5.44115e-5 months <br /> power was increased to 71%
RTP. At 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br /> power was reduced to 61% RTP to support replacement of cabling for the Main Turbine #3 Control Valve. Power was restored to 73% RTP on December 2, 1993 at 0552 hours0.00639 days <br />0.153 hours <br />9.126984e-4 weeks <br />2.10036e-4 months <br />.
On December 3, 1993 at 0345 hours0.00399 days <br />0.0958 hours <br />5.704365e-4 weeks <br />1.312725e-4 months <br /> power was restored to 90%
RTP following control rod maintenance work.
Unit 1 ended this operating period in end-of-cycle coastdown at 80% RTP.
II. Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief
- Valves during the month of~ December.
d h >+ .-i .W -
t.j4s-AVERAGE DAILY UNIT POWER. LEVEL T DOCKET NO. 50 - 352 UNIT LIMERICA UNIT 1 .
DATE JANUARY 11, 1994 t
JOHN J. MCMENAMIN REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3794 MONTH DECEMBER 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (wwE. NET) (MWE-NET) 1 655 '17 862 2 709 18 854 3 907 19 852 4 916 20 847 i 5 906 21 842 6 915 22 838 7 909 23 B35 8 902 24 829 i 9 899 25 825 >
10 890 16. 820 11 890 27 817 t 12 887 28 813 13 881 29 802 14 873 '30 809 15 868 31 797
- i. 16 864 -
t k
uw <- e , , v.-r-v -
-. , e . --w:-- a n . - - - , r,- - + ., a nu . v, ,, ..,. a
OPERATING DATA REPORT a
DOCKET NO. 50 - 352 DATE JANUARY 11 1994 COMDLETED BY ~
JOHN J. MCMENAMIN REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3794
......--------- . _u OPERATING STATUS '
- 1. UNIT NAME: LIMERICK UNIT 1 l NOTES: THERE WERE TWO LOAD REDUCTIONS i i .-....... .-_.-----.-__..------.---
- 2. REPORTING PERIOD; DECEMBER. 1993 GREATER THAN 20% THIS MONTH '
.-.--------. r
- 3. LICENSED THERMAL POWER (MWT) 3293 TO PERFORM CONTROL ROD I 4 NAMEPLATE RATING (GROSS MWE): 1138 HYDRAULIC CONTROL UNIT WORK
- 5. DESIGN ELECTRICAL RATING (NET MWE): 1055 AND TO REPLACE CABLING FOR 6-. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1092 THE MAIN TURBINE CONTROL VLV.
7 MAXIMUu DEPENDABLE CADACITY (NET MwE): 1055 8,
IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER 3 THROUGH~7) SINCE LAST REPORT. GIVE REASONS: 'i i
t
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
i
- 10. REASONS FOR RESTRICTIONS. IF ANY: "
THIS MONTH VR-TO-DATE CUMULATIVE j
- 11. HOURS IN REPORTING PERIOD - 744 8.760 69.384
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8.649.9 56.199.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 744.0 8.626.6 55.184.8-
- 15. UNIT RESERVE SHUTDOWN HOUR 5 0.0 0.0 0.0 4
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.068.046' 27.717.294 169.450.759
- 17. GROSS ELECTRICAL ENERGY GENERATED-(MWH) 656.880 9.065.900
.... ---.....---. 55.042.040 -
...----.-~..
- 18. NET ELECTRICAL ENERGV. GENERATED (MWH) 631.513 8.745.473 52.785.990 PAGE 1 OF 2 i
e
- __ m #".;-__m_L___ - _ _ _ . _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ -m __.a _f- _ _ . _ _ ___m_a=* - *A - m-s- e- k- _ = w e VWs -*Wf a v wm a +. __ w _ -._ . .* _ _ L
. . _ .m. .- . _ _.,
OPERATING DATA REPORT (CONTINUED)
~
' DOCKET NO. 50.- 352 DATE JANUARY 11, 1994 THIS' MONTH VR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 98.5 79.5
- 20. UNIT AVAILABILITY FACTOR 100.0 98.5 79.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 80.5 94.6 72.1 j
- 22. UNIT CAPACITY FACTOR (USING DER NET) 80.5 94.6 72 1 1
.._____--__. --._ ..-_... .__.__-_-___ c
- 23. UNIT FORCED OUTAGE RATE O.0 1.5 4.7 k
24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
- 9 STH REFUELING OUTAGES 1/29/94: 45 DAYS '
4
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: I
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84
_..._ ____ _._...... 1 INITIAL ELECTRICITY MID' APRIL 85 4/13/85
.t.
COMMERCIAL OPERATION IST QTR 86 2/01/86 I
4 PAGE 2 CF 2 i
l i ,
.t l
l s
w v -w. w,.. . -
.s.++e ~ n -n,-- s - v,n.- , , .e.-,.-.- ~, e + s -- , , v ,x
+A4 e.
. 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352' ,
UNIT NAME LIMERICK UNIT 1
- DATE JANUARY 11, 1994
- REPORT MONTH DECEMBER. 1993 COMPLETED BY '
JOHN J. MCMENAMIN REPORTS ENGINEER 4 SITE ENGINEERING '
LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3794 l l l METHOD OF LICENSEE SYSTEM CouPONENT CAUSE AND CORRECTIVE .;
-l ITYPE! DURATION REASON SHUTTING DOWN . EVENT CODE CODE ACTION TO NO.i DATE l (1)) (HOURS); (2) REACTOR (3) REPORT s (4)- (5) PREVENT RECURRENCE
- I 30 931201 S 000.0 B 4 N/A RB CONROD REACTOR POWER REMAINED AT 50% TO CONTINUE CONTROL ROD HYDRAULIC CONTROL UNIT MAINTENANCE THAT HAD BEGUN AT THE END OF THE PREVIOUS MONTH.
31 931201 5 000.0 i B 4 N/A HA VALVEX REACTOR POWER WAS REDUCE 0 TO 61% TO l ALLOW FOR THE REPLACEMENT OF CABLING FOR THE MAIN TURBINE s3 CONTROL VALVE.
l t
4 (1) (2) (3) (4)
F - FORCEO REASON- METHOD EXHIBIT G- INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN)' 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)
D- REGULATORY RESTRICTION .
4 . OTHER (EXPLAIN) FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE Y
d t
e b
t e
en& _______' _ ,u_a __ - _ _ _ w v~~+y / u.e - - i=%-i ,& ww- *- -- - , , ,
. Docket No. 50-353 Attachment to Monthly Operating Report for December 1993 Limerick Generating Station Unit 2 December 1 through December 31, 1993 I. Narrative Summary of Operatina Experiences Unit 2 began this operating period at 100% of rated thermal power (RTP) .
On December 12, 1993 at 1340 hours0.0155 days <br />0.372 hours <br />0.00222 weeks <br />5.0987e-4 months <br /> power was reduced to 92%
RTP for Main Turbine Valve Testing. Power was restored to 100% RTP at 1551 hours0.018 days <br />0.431 hours <br />0.00256 weeks <br />5.901555e-4 months <br />.
On December 16, 1993 at 1150 hours0.0133 days <br />0.319 hours <br />0.0019 weeks <br />4.37575e-4 months <br /> power was reduced to 98%
RTP for a control rod pattern adjustment and then restored 1 to 100% RTP shortly thereafter.
Unit 2 ended this operating period at 100% of rated thermal power.
II. Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of December.
l 1
l r
~. _ _ ,
. . . .. ~ . . . . 1 i .
AVERAGE DAILY UNIT POWER LEVEL
-DOCKET NO 50 - 353 .
_ - _ . . . . . . _ - . . . . . . . . _ . . . . . . n ,
UNIT LIMERICK UNIT 2
- DATE JANUARY 11, 1994 JOHN J. MCMENAMIN REPORTS ENGINEER SITE-ENGINEERING LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3794
- MONTH OECEMBER 1993 '
DAY AVERAGE DAILY power LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MwE-NET) i 1077 17 1072 1 2 1070 18 1070 t
3 1076 19 1072 '
4 1065 20 1069 5 1066 21 1070 '
6 1071 22 1071 7 l 1072 23 1073 8 1073 24 1072..
9 1072 25 1074 to 1068 26-
- 1072 11 1070 27 1072 12 1064 28 1076 --'
t 13 1071 29 1073 14 1070 30 1076 15 1069 31 1074 1E 1070 -
OPERATING DATA REPORT DOCKET NO. 50 - 353 DATE JANUARY 11 1994 ..
4 .... .---..............--.--.
a COMPLETED BV JOHN J. MCMENAMIN REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION . #
TELEPHONE (215) 327-1200 EXTENSION 3794 OPERATING STATUS UNIT NAME: LIMERICK ;
1 UNIT 2 NOTES: THERE WERE NO LOAD DROPS l
- 2. REPORTING PERIOD: DECEMBER, 1993 GREATER THAN 20% THIS
- 3. LICENSED THERMAL POWER (MWT): 3293 l MONTH.
4 NAMEPLATE RATING (GROSS MWE): 1138
- 5. DESIGN ELECTRICAL RATING (NET MWE): 1055
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1092
- 7. MAXIMU"4 DEPENDABLE CAPACITY (NET MWE): 1055 B. IF CH.NGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
t 7
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE 11 HOURS IN REPORTING PERICD .
744 8.760 34.896
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744,0 7.401.8 30.642.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 744.0 7.290.2 29.946.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.448.197. 23.338.931 95.305.081
, 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)- 823.080 _
7.739.420 31.492.526
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 797.041 7.467.645 30.330.692 PAGE 1 OF 2
. - - . . . = _ . . :-. -_. - - - - - _ _ - _ _ _ _ _ _ - _ _ - _ - - _ _ _ -
OPERATING DATA REPORT (CONTINUED) DOCKET NO. 50 - 353
__ -_-~___.-----_ .._____---- .
DATE JANUARY 11 1994 ,
THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 83.2 85.8
- 20. UNIT AVAILABILITY FACTON 100.0 83.2 85.8
- 21. UNIT CAPACITY FACTOR (USING MOQ, NET) 101.5 80.8 82.4 t ______.--_-_ -_________ _ _____ ______
- 22. UNIT CAPACITY FACTOR (USING DEh* NET) 101.5 80.9 82.4
- 23. UNIT FORCED CUTAGE RATE O.0 2.4 4.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH}
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 26. UN!TS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FOAECAST ACHIEVED INITIAL CRITICALITY C8/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89 09/01/89 COvvERCIAL OPERATION 02/01/90 01/08/90 PAGE 2 OF 2
UNIT SHUTDOWNS AND POWER REDUCTIONS
~
OOCKET NO. 50 - 353 w .
UNIT NAME LIMERICK UNIT 2-' '
DATE JANUARY 11, 1994 -
1 RE' PORT MONTH DECEMBER. 1993 COMPLETED BV JOHN J. MCMENAMIN .
REPORTS ENGINEER l SITE ENGINEERING LIMERICK GENERATING STATION -
TELEPHONE (215) 327 1200 EXTENSION 3794 I l METHOD OF LICENSEE ' SYSTEM COMPONENTl CAUSE AND CORRECTIVE TYPE!DURATIONjAEASON SHUTTING DOWN EVENT CODE ' CODE l ACTION TO
'NO. DATE (1)! (HOURS)) (2) REACTOR (3) REPORT * (4) (5) i PREVENT RECURRENCE I I i i I .l 46 931212 l 5 000.0 l B 4 N/A HA INSTRU l REACTOR POWER WAS REDUCED TO 92% FOR l [ MAIN TURBINE VALVE TESTING. 6 1
1 47 931216 S 000.0 8 4 N/A RB CONROD REACTOR POWER WAS REDUCED TO 98% FOR l A CONTROL ROD PATTERN ADJUSTMENT, l -_-.. } l
't -
1 I i
(1) (2) (3) (4) .
F F - FORCED REASON METHOD EXHIBIT G- INSTRUCTIONS S- SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER) f D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION '
F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE l I