ML20063A296

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Spec/Design Changes Left Unincorporated in as-built Configurations of safety-related Equipment or Structures.Initially Reported on 811208. Procedural Changes Being Made.Next Rept Expected by 821217
ML20063A296
Person / Time
Site: Marble Hill
Issue date: 08/16/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S81-18, SVP-0015-82, SVP-15-82, NUDOCS 8208240283
Download: ML20063A296 (2)


Text

.J A

PUBLIC SERVICE INDIANA August 16, 1982 S81-18 SVP-0015-82 Mr. James G. Keppler Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On December 8,1981, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your of fice of a potentially reportable item as required by 10 CFR 50.55(e). PSI Quality As-surance personnel discovered that existing procedares did not require specification / design changes made via engineering change notices, specification amendments, or drawing revisions to be contractually imposed on suppliers or contractors. This created the potential for specification / design changes to be left unin-corporated in the as-built configuration of safety related equipment or structures.

PSI is continuing to determine what, if any, design changes were lef t unincorporated in final as-built configurations. PSI is also pursuing procedural changes which will require that specification /

design changes are contractually imposed on suppliers and contractors.

This letter is intended to fulfill the requirements of an interim report as defined in 10 CFR 50.55(e). A further report will be filed on or before December 17, 1982. If you have any questions on this matter, please feel free to contact me.

Sincerely, '

CL' S. W. Shields SWS/TDG/bak ga h,.-

8208z40 2D $ mtoe P.O. Box 190. New Washington, Indiana 47162 812. 289.1000

e

.n PUBUC SERVICE INDIANA Letter: J. C. Keppler August 16, 1982 S81-18 SVP-0015-82 cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 J. E. Konklin J. J. Harrison i

l