Text
-
Docket Nos. 50-528/529/530 50.55(e) Report c-A W1.IWTlNEC 6EE5M R7BD M !C M.,g AbD M MSW 3003
.. !! */
STA.
P.o. Box 21666 PHOENIX. ARIZONA 85036 f
August 10, 1982 ANPP-21591-GHD/BSK i
U. S. Nuclear Regulatory Commission Region V l
Creekside Oaks Office Park i
1450 Maria Lane - Suite 210 i
Walnut Creek, California 94596-5368 j
Attention:
Mr. T. W. Bishop, Chief Reactor Construction Projects Branch Suoj ect:
Interim Report - DER 82-37 l
A 50.55(e) Potentially Reportable Deficiency Relating to Class IE Wiring Terminations Crimped With Less Pressure Than Specified, Due to Lack of Maintenance Program and Traceability For AMP Hydraulic Crimp Tools File:
82-019-026 D.4.33.2
Reference:
Telephone Conversation between T. Bishop and G. Duckworth on July 13, 1982
{
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation.
At that time, it was estimated that
,i a determination of reportability would be made within thirty (30) days.
I l
Due to the extensive investigation and evaluation required, an Interim Report is attached.
It is now expected that this information will be finalized by October 21, 1982, at which time a complete report will be submitted.
Very tru'.y yours,
- f. E Ua< h g
4 E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director i
EEVBJr/GHD:db Attachment cc: See Attached Page 2 1
i l6R 8208x,oggg 3 u-
s U. S. Nuclear Regulatory Commission August 10, 1982 Attention:
Mr. T. W. Bish<>p, Chief ANPP-21591-Gild /BSK Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S.
Kaplan W. E.
Ide J. Vorecs J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. llawkinson L. E. Vorderbrueggen G. A. Florelli Lynne Bernabei, Esq.
liarmon & Weiss 1725 "1" Street, NW Suite 506 Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 l
l l
l l
i
INTERIM REPORT - DER 82-37 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNIT 2 I.
POTENTIAL PROBLEM The operating pressures of hydraulic crimping tools used for electrical terminations were checked in accordance with the AMP Customer Manual (CM 1950) which establishes that the pressure switch should be adjusted between 8,000 and 8,400 PSI, and preventive maintenance should be performed.
As requested by an NRC inquiry, these units were checked and the following data was obtained:
One unit found to be operating between 4,500 and 5,000 PSI.
No maintenance program exists to provide periodic maintenance for the (22) AMP hydraulic crimp units on the jobsite.
Hydraulic pump units are not serialized for traceability.
Hydraulic pumps are used in conjunction with electrical crimping tools used on wire sizes 2/0 to 800 MCM for Class IE and Non-IE terminations.
II.
APPROACH TO AND STATUS OF PROPOSED RESOLUTION Bechtel engineering is corresponding with AMP Special Industries to disposition this condition.
III.
PROJECTED COMPLETION OF CORRECTIVE ACTION AND SUBMITTAL OF THE FINAL REPORT i
Evaluation of this condition and submittal of the Final Report is forecast to be completed by October 21, 1982
_. - _ _ - - - _ _ _. --