Enclosure to Serial: RSEP/81-2050 Page 1 of 3 OPERATING DATA REPORT DOCKET NO: 50-261 DATE: 811203 COMPLETED BY: H. Rav Norris TELEPIIONE: 803-383-4524 OPERATING STATUS Notes:
- 1. Unit Name:
H. B. Robinson Unit Two There are presently 113 spent
- 2. Reporting Period: 811101.0000/811130.2400 fuel assemblies stored in the
- 3. Licensed Thermal Power (MWt): 2300 spent fuel pool.
- 4. Nameplate Rating (Gross MUe):
739
- 5. Design Electrical Fbting (Net FMe): 700
- 6. Fhximum Dependable Capacity (Gross MWe): 700
- 7. Maximum Dependable Capacity (Net MWe):
665
- 8. If Changes Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, Give Reasons:
No change.
- 9. Power Level to Which Restricted, If Any (Net MWe):
%325 (50% Reactor Power)
- 10. Reasons For Restrictions, If Any:
Although the unit is not restricted by any outside agency, the power level is presently reduced due to steam generator considerations.
This Month Yr.-to-Date Cumulative
- 11. Hours in Reporting Period 720 8016 94,182
- 12. Number of Hours Reactor Was Critical 170.75 5908.71 71673.99
- 13. Reactor Reserve Shutdown Hours, 0
116.62 1094.50
- 14. Hours Generator On-Line 163.13 5763.93 69922.75
- 15. Unit Reserve Shutdown Hours 0.00 0.00 23.20
- 16. Gross Thermal Energy Generated (MWH) 182,326 10,843,264 142,055.638
- 17. Gross Electrical Energy Generated (MWH) 55,381 3,404.745 45,743,512
- 18. Het Electrical Energy Generated (MWH) 43,006 3,193,905 43.310.357
- 19. Unit Service Factor 22.65 71.90 74.24
- 20. Unit Availability Factor 22.65 71.90 74.26 l
- 21. Unit Capacity Factor (Using MDC Net) 8.98 59.92 69.15
- 22. Unit Capacity Factor (Using DER Net) 8.53 56.92 65.69
- 23. Unit Forced Outage Rate 77.34 21.92 14,59
- 24. Shutdowns Scheduled Over Next 6 bbnths (Type, Date, and Duration of Each):
l Refueling / Maintenance Outage in late winter.
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
12-1-81
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved l
l INITIAL CRITICALITY INITIAL ELECTRICITY l
COMMERCIAL OPERATION l
l 81121G0376 011214 PCR ADOCK 0S000261:
(9/77) i PDR i
R l
CB i
u m.
-t_
- a w
. my.,2 a; ;.
Page 2 of'3' AVERAGE D-\\ll.Y UNIT l'OWER LEVEL-
~
a1 DOCKETSO.
50-261 II. B. Robinson Two UNIT DATE CO\\lPLE1ED 11Y 803 383-4524 TELEPfl0NE November
,.\\l0 Nill DAY AVERAGEI\\ll.
VER LEVEL '
DAY AVER AGE D \\tLY POWER LEVEL O!We. Net) 1 324
-18 7
324 2
3 39 9
4 322 204 20 322 5
21
-19 263 6
_9
~25 1
7 23
-6
-22
-5 8
2.s s
~I8 i
9 25
-4
-23 10,
26
-4 II
-5.
27
-11 g,
2S
-5.
-l 13
-11
-12 29
-14 34 30
-16
-20 j
15 3g 16
-18 i
r INSTRUCTIONS I
" II" t P"ntng ininuli. Cinnpute to hbl i
th
'are t
' a it 1
(9/771 i
I l
I s
I
~41~::
- r L
4 I? ~
/Q
=
{
f
% L,
,f g
- I b[ b
a Page 3 of 3 ar
.i 13
- iT 50-261 DOCKET NO.
,j UNIT Sif 0TDOWNS AND POWER REDUCTIONS H.
B. Robinson Two UNIT NAME DATE 811203 V
11. H y Norris j
November COMPLETED BY 503-J63-4324 lj ;
REPORT MONTil TELEPlf0NE
=c a
{g 3
k j' Licemcc 3-r, Cause & Correenive o
No.
Dale i
3s 4
is5 Event 3,7 9?
Auion to 4
H
==
y 3 g =;s Report a mu E'
Prevent Recurrence u
[
6 i
11-01 811106 F
309.78 B
1 CB INSTRli Tave Recalibration 4
1 11-02 811120 F
247.09 A
1 81-26 IIB llTEXCII S/G Tube Leak i
i i
1 2
3 4
F: F.uted Iteawn:
Method:
Evis. hit G - Inst ructions S: Scheduled A l'iinipment l'ailure(Explain)
- 1. Manual for Treparation of Data II.M.iinter.ance til Test
- 2. Manual Scrarn.
Entr> Sheets for Licenice 5
- C.itefueling 3.Autimplic Scram.
Event Rep.nt (LER) File (NURI.G-D.Itepilaim> ltestriction 4 Other (Explain) 01611
~
I'-Operatoi Training & License Examination F.Adnunist rative 5
G. Operational Eiror (Explain)
Exhibit ! Same Sovree P3/77)
Il-Ot her ( E splam)
E
.. _ _,