Text
1
~
96 9 ENTERGY
'"M """'" *"""'
Ksyu i A 70066 in: f,0J 733 6774 R. F. Nrski wa
" J ddt fi'li 'y
/d,1hf"
- f Ll 3 W3F1-93-0330 A4.05 PR December 29, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Reactor Vessel Surveillance Specimen Withdrawal Schedule Change Submittal Gentlemen:
A proposed revision to the Waterford 3 Reactor Vessel Material Surveillance Program - Withdrawal Schedule is submitted here for NRC review and approval in accordance with 10 CFR 50 Appendix H.II.B.3.
The current withdrawal schedule is maintained in the Waterford 3 Technical Specifications (TS).
However, Technical Specification Change Request NPF-38-148 (W3F1-93-0099) was submitted to the NRC on December 14, 1993 to remove the schedule from the TS and maintain it in the Waterford 3 Final Safety Analysis Report (FSAR). Before and after versions of the schedule are attached.
The revised schedule was developed based on surveillance capsule results for Capsule 2 (also referred to as capsule W-97.)
It was developed in accordance with 10 CFR 50 Appendix H requirements using ASTM E-185-92. A review of proposed revised standards shewed no changes-affecting the method f
for determining the withdrawal schedule. Therefore, future modifications to 10 CFR 50 Appendix H by reference to the revised ASTM E-185-93 standard are not expected to alter the capsule withdrawal requirements. Capsule 2 was pulled during Refuel 4 on April 11, 1991.
Submittal of the test l
1 h
950io60149 931229 f.,
j ADOCK0500g2.j DR
+
Reactor Vessel Surveillance Specimen Withdrawal Schedule Change Submittal W3F1-93-0330 Page 2 December 29, 1993 summary for Capsule 2 was submitted to the NRC via W3F1-92-0369 dated November 25, 1992. Technical justification for the revised schedule is provided in Section 6.0 of ABB Combustion Engineering Nuclear Services report C-MECH-ER-021 dated October 11, 1993 (Section 6.0 is attached.)-
Very truly yours,
/
y ',)I B//.
/
- g].
a.
h R
ski 7
L[ / Director
~
?
Nuclear Safety RFB/0PP/dc cc: