OPERATINC DATA REPORT g
DOCKET No. 50 - 277 DATE AUGUST 11, 1982 C05PLETED BT PHILADELPHIA ELECTRIC ConPANT W.H.ALDEN ENGINEER-IN-CHASGE NUCLEAR SECTION
~
I-GENER ATION DIVISION-MUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS
- 1. UNIT NARE: PEACE BOTTOR UNIT 2 l NOTES: UNIT 2 EXPERIENCED TWO l
g l
l
- 2. REPORTING PERIOD:
JULT, 1982 l
SCHEDULED LOAD REDUCTIONS.
1 i
- 3. LICENSED THERN AL POWER (BNT) :
3293 i
THE UNIT'S REFUEL OUTAGE l
g g
4.. NAMEPLATE RATING (GRO35 SWE) :
115I l
EWDED 05 JULY 2, 1982.
l j
g g
i
- 5. DESIGE EL3CTRICAL RATING (NET 55E) :
1065 l
l g
g t
- 6. MAIIRUS DEPENDABLE CAPACITY (GROSS RWE): 1098 I
l 1
I
- 7. MAIIMDB DEPENDABLE CAPACITT (NET. H WE) :
1051 l
l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS ND5BER 3 THROUGB 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET ENE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS 50 NTH YB-TO-DATE CDBULATITE
- 11. HOURS IN REPORTING PERIOD 744 5,087 70,775 12., NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,051.0 51,794.4
- 13. REACTOR RESERVE SHDfDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 714.7 1,881.8 50,338.3
- 15. UNIT RESERVE SHDTDOWN HOURS 0.0 0.0 0.0
.=
.==
- 16. GROSS THER5AL ENERGY GENERATED (MVR) 2,041,546 5,184,838 146,408,154
- 17. GROSS ELECTRICAL ENERGY GENERATED (ENH) 665,170 1,674,820 48,178,590
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 638,968 1,586,761 46,177,496
==..
- 19. UNIT SERVICE FACTOR 96.1 37.0 71.1 l
- 20. UNIT AVAILABILITY FACTOR 96.1 37.0 71.1 l
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 81.7 29.7 62.1 l
l
- 22. UNIT CAPACITI FACTOR (USING DER NET) 80.6 29.3 61.3 1
- 23. UNIT FORCED OUTAGE BATE 0.0 1.7 7.9
=___..__
I
- 24. SHUTDOWNS SCHEDULED OYER NEIT 6 50NTHS (TT PE, DATE, AND DURATION OF EACH) :
I r
l l
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIM ATED D ATE OF STARTUP
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPER ATION) :
FORECAST ACHIEYED INITIAL CRITICALITY t
(
INITIAL ELECTRICITY COSMERCIAL OPERATION 9208190102 820813 PDR ADOCK 05000277 l
OPERATING DATL at20RT g
DOCKET No. 50 278 DATE AUGURT 11, 1982 COMPLETED BY PHILADELPHIA ELECTRIC C05 PANT 3.5.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS
- 1. UNIT N AME PEACH BOTT05 UNIT 3 i NOTES: UNIT 3 EXPERIENCED l
g i
- 2. REPORTING PERIOD:
JULY, 1982 l
TN0 SCHEDULED LOAD I
g g
i
- 3. LICENSED THERRAL POWER (BNT) :
3293 l
REDUCTIONS.
l g
l l
- 4. NAMEPLATE RATING (GROSS BWE) :
1152 l
[
1 g
g
- 5. DESIGN ELECTRICAL RATING (NET 57E):
1065 l
l g
g
- 6. MAIIBU5 DEPENDABLE CAPACITY (GROSS MWE): 1098 l
l g
- 7. MAII505 DEPENDABLE CAPACITY (NET ENE):
1035 l
l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUBBER 3 THROUG5 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO YHICH RESTRICTED, IF ANY (NET BBE):
- 10., REASONS FOR RESTRICTIONS, IF ANY:
THIS 50 NTH YB-TO-DATE CU5ULATIVE
- 11. HOURS IN REPORTING PERIOD 744 5,087 66,671
- 12. NUdBER OF HOURS REACTOR WAS CRITICAL 744.0 4,769.3 50,256.7
- 13. REACTOR RESERTE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 744.0 4,701.0 48,927.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERBAL ENERGY GENERATED (BWH) 2,356,174 15,024,033 141,715,555
- 17. GROSS ELECTRICAL ENERGY GENEBATED (5VB) 777,890 5,034,500 46,423,420
- 18. NET ELECTRICAL ENERGY GENER ATED (BWB) 748,851 4,867,166 44,577,639
- 19. UNIT SERTICE FACTOR 100.0 92.4 73.4
- 20. UNIT AVAILABILITY FACTOR 100.0 92.4 73.4
- 21. UNIT CAPACITY FACTOR (USING BDC NET) 97.2 92.4 64.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 94.5 89.8 62.8
- 23. UNIT FORCED OUTAGE RATE 0.0 7.6 7.9
- 24. SHUTDOWNS SCHEDULED OVER NEIT 6 BONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIBATED D ATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO C055ERCIAL OPER ATION) :
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY C055ERCIAL OPERATION
(
UNIT SHUTDONNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH BOTTOR UNIT 2
=
DATE AUGUST 11, 1982 BEPORT MONTH JPLY, 1982 COMPLETED BY PHILADELPHIA ELECTRIC C05PANY N.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NDCLEAR TELEPHONE (215) 841-5022
_ = _ _ = _. - - - - - -.......
_-_==
_=
_ =. - - - - - -...........
l l
l l
l METHOD,0F l LICENSEE ISYSTEMICOMPOWENTI CAUSE AND CORRECTIVE l
lTYPElDUR ATIONlBEASONl SHUTTING DOWNl EVENT l CODE l CODE l ACTION TO No.l DATE l (1) l (ROURS) l (2) l REACTOR (3) l REPORT 8 l (4) l (5) l PREVENT RECURRENC3 l
l l
l l
l l
l l
3l 820701 l S I 29.3 l
C.
I 1
l NA l RC l FUELIE l CONTINUING REFUELING OUTAGE.
I l
l l
l l
l l
l
,4
! 820709 l S l 00.0 l
H l 4
l NA l RC l ZZZZZZ l LOAD REDUCTION FOR THE ADJUST 5ENT OF THE l
l l
l l
l l
l l CONTROL ROD PATTERN.
I l
l l
l l
l l
5l 820717 l S l 00.0 i
H l 4
l NA l RC l 2221Z1 l LOAD REDUCTION FOR THE ADJUSTERNT OF THE
-l l
l l
l l
l l
l CONTROL ROD PATTERN.
l l
l l
l l
l l
l l
l l
29.3 l
l l
l l
l (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EIRIBIT C - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EIPLAIN) 1 - MANUAL FOR PREPARATION OF DATA 3 - N AINTENA NCE OR TEST 2 - RANUAL SCRAN.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUT05& TIC SCRAM.
EVENT REPORT (LER)
D - R EGULATORY RESTRICTION 4 - OTHER (EIPLAIN)
FILE (NOREG-0161)
E - OPER ATOR TR AINING + LICENSE EI AMIN ATION F - ADMINISTR ATIVE (5)
G - OPERATIONkL ERROR (EIPLAIN)
H - OTHER (EIPLAIN)
EIMIBIT I - SARE SOURCE
'o
-w
G f
'd i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 d
--=-==_=-
_ - - - - - - - - = _ _. - __
UNIT NAME PEACH BOTT05 UNIT 3 C
___=-- -
DATE AUGUST 11, 1982 REPORT MONTH JULY, 1982 COMPLETED BT PHILADELPHIA ELECTRIC COMPANI
- _--- _ = - _.
=-
N.M.ALDEN ENGINEER-IN-CHARGE 6
NUCLEAR SECTION GENERATION DIVISIDE-NUCLEAR TELEPHONE (215) 841-5022 6
==--- -=_=_-
-==---==-
l l
l l
l METHOD OF l LICENSEE l SYSTEM lCOMPONENTI CAUSE AND CORRECTITE 6
l l TYPE lDURATIONIREASONl SHUTTING DONNl EVENT l CODE l CODE l ACTION TO NOol DATE I (1) I (HOUR S) I (2) l REACTOR (3) I REPORT S I (4) I (5) 1 PRETENT RECURRENCE
-___ _=
=----.--
t I
I I
I I
l 1
l l
11 1 820724 I S I 00.0 i
H I 4
I NA I RC I ZZZZZZ l LOAD REDUCTION FOR THE ADJUSTHENT OF THR l
l l
l l
l l
l l CONTROL ROD PATTERN.
'l I
I I
I l
1 1
I i
12 1 820730 l S I 00.0 i
B I 4
l NA l HF l HTEICH l LOAD REDUCTION TO REPAIR TUBE LEAKS IN I
l l
l l
1 I
l l THE MAIN CONDENSER BOI.
I I
I l
l 1
l l
l
=
' l i
I -
1 I
I l
l l
w (1)
(2)
(3)
(4) k F - FORCED REASON METHOD EIRIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EIPLAIN) 1 - MANUAL FOR PREPARATION OF DATA q
B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EIPLAIN)
FILE (NUREG-0161)
E E - OPERATOR TRAINING + LICENSE EIANINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EIPLAIN) e H - OTHER(EXPLAIN)
EIHIBIT I - SAME SOURCE E
l e
O e
S L
3 AVERAGE DAILY UNIT POWER LEVEL DOCKET ho. 50
,277 UNIT PEACH BOTTOM UNIT 2 DATE AUGDST 11, 1982 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH JULY 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M WE-NET)
(MWE-NET) 1 0
17 794 2
139 18 1002 3
239 19 1043 4
323 20 1043 5
471 21 1044 6
668 22 1045 7
758 23 1043 8
930 24 1043 9
969 25 1021 10 747 26 1041 11 926 27 1041 12 1033 28 1044 13 1037 29 1043 14 1029 30 1045 15 1024 31 1047 16 1005
AVERAGE DAILY UNIT POWER LEVEL DOCKET 0.
50 - 278 UNIT PEACH BOTTOM UN7T 3 DATE AUGUST 11, 1982 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH JULY 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1044 17 1023 2
1043 18 1021 3
1045 19 1017 4
1043 20 1020 5
1046 21 1021 6
1050 22 1019 7
1050 23 1013 8
1045 24 646 9
1040 25 911 10 1036 26 1038 11 1031 27 1038 12 1034 28 1045 13 1034 29 1045 14 1030 30 1018 15 1019 31 714 16 1023 l
l l
l
\\.
f PEACH BOTTOM ATOMIC POWER STATION Narrative Summary of Operating Experience July 1982 UNIT 2 Following completion of the fifth refueling outage, the unit was returned to service on July 1, reaching 92% power on July 9.
Load reductions were taken on July 9, July 17 and July 25 for control rod pattern adjustments.
The E-4 Diesel Generator was removed from service from July 20 thru July 24 to align the generator and to replace the generator bearing, due to insulation degradation.
The E-4 Diesel Generator was blocked again on July 28 for balancing to reduce vibration.
i UNIT 3 The unit began the month at full power.
On July 24, reactor power was reduced to 640 MWe for a control rod pattern adjustment.
The reactor was returned to full power by July 26.
On July 30, the reactor power was reduced to accommodate repair of tube leaks in a main condenser water box.
The unit ended the month on a reactor power recovery flow ramp at 990 MWe, l
i l
l l
l
Docket No. 50-277 Attachment to Monthly Op2 rating i
Report for July, 1982 REFUELING INFORMATION 1.
Name of facility:
i Peach Bottom Unit 2 1
2.
Scheduled date for next refueling shutdown:
l September 16, 1983 t
3.
Scheduled date for restart following refueling:
4 1
October 29, 1983 i
3 4.
Will refueling or resumption of operation thereafter require i
a technical specification change or other license amendment?
a I
Yes j
If answer is yec, what, in general, will these be?
i I
Technical Specifications to accommodate reload fuel.
l Modifications to reactor core operating limits are expected.
5.
Scheduled date(s) for submitting proposed licensing action j
and supporting information:
July 29, 1983 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
1 None expected f
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblies (b)
Fuel Pool - 1216 Fuel Assemblies 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
September, 1990
T Docket No. 50-278 Attachment to Monthly Operating Report for July, 1982 j
REFUELING INFORMATION l.
Name of facility:
Peach Bottom Unit 3 i
2.
Scheduled date for next refueling shutdown:
February 12, 1983
{
3.
Scheduled date for restart following refueling:
l April 8, 1983 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel.
f Modifications to reactor core operating limits are expected.
5.
Scheduled date(s) for submitting proposed licensing action i
and supporting information:
December 17, 1982 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, now operating procedures:
None expected i
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
i (a)
Core - 764 Fuel Assemblies
[
(b)
Fuel Pool - 934 Fuel Assemblies t
d 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present a
l licensed capacity.
September, 1991 j
..