Forwards IE Insp Repts 50-313/82-13 & 50-368/82-10 on 820601-30 & Notice of Violation
ML20062K902
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/27/1982
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20062K905 List:
References
NUDOCS 8208180055
Download: ML20062K902 (2)


See also: IR 05000313/1982013

Text

f/f

'

-

,

.

.

WL 27 1882

Dockets: 50-313/82-13

50-368/82-10

i

Arkansas Power and Light Company

ATTH: 14r. William Cavanaugh III

Senior Vice President

Energy Supply

P. O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted under the Resident Inspection Pro-

gram by 11essrs. W. D. Johnson and L. J. Callan of this office covering the

period of June 1-30, 1982, of activities authorized by NRC Facility Operating

Licenses DPR-51 and HPF-6 for Arkansas Nuclear One, Units 1 and 2, and to

discussion of the findings by the NRC inspectors with members of your staff

at the conclusion of each segment of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors.

During this inspection, it was found that certain of your activities were in

violation of HRC requirements. Consequently, you are required to respond to

this violation in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10 Code of Federal Regula-

tions. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter. A written response is not

required for the violation involving the failure to provide adequate access

control to the Security Key Issue Room.

A Notico of Violation, describing two additional violations identified during

the inspection, was forwarded to you by our letter of June 14, 1982. Details

relating to these two violations are provided in the enclosed Appendix B to

this letter.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this office,

\\

0

t

e208190055 820727

k

PDR ADOCK 05000313

G

PDR

-hRPS-C

.

..

.

..

. . .

su m = [.

,

,,4, q p , ..RB.-C

.RRPB2..

'DRRP.8

EIS7

..

.RgV.

WDJohnso,n

,RE H a l l, , , , , ,

WCSeidl,e.

.J Ga gp. . o , ,

. EQphns.on. . ,

. . dig l.] .i.o s. .

.. .[( f - ..J.lah"

.. 3/hi. 4 .,.n. .w .h/. . .']p.1.

. ... . ..

7

="+ ....v.v..y.1

. . . .

.

'

Nac Fonu sia 00-80> uncu o24o

OFFICIAL RECORD COPY

.

. .

. . .

.

.

Arkansas Power and Light

Company

-2-

P

by telephone, within 10 days of the date of this letter and submit written

application to withhold information contained therein within 30 days of the

date of this letter. Such application must be consistent with the require-

i

ments of 2.790(b)(1).

The response directed by this letter and the accompanying Notice is not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980 PL 96-511.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

.

Sincerely.

Original Signed By.

W. C. Scid!0

+

W. C. Seidle, Chief

Reactor Project Branch 2

,

,

Enclosures:

,

1.

Appendix A - Notice of Violation

2.

Appedix B - NRC Inspection Report

'

50-313/82-13; 50-368/82-10

h.

cc w/ enclosures.

1

Arkansas Nuclear One

"

ATTH:

J. M. Levine, General Manager

P. O. Box 608

!

Russellville, Arkansas 72801

,

-

bcc to DMB for dist.

bec dist. by RIV

BC

NRR/DHFS

Regional Administrator

PM

NRR/0LB

RRI

'

AE00

RAD ASMT BR

Section Chief

ELD

RESEARCH

Enforcement Assistant

IE FILE

LPDR

MIS Section

4

IE/RPRIB

NSIC

TP Branch

NRC PDR

NTIS

RPB-1

RPB-2 Files

Arkansas State Dept. of Health

G. Vissing, NRR

C. Trammell, NRR

  • "'">

.... ... ... .

. . . .... .. .

.

..

.

.

..

.. .

.

..

. . . .

.

.

..

'""""'>

'

... ... .. . . ...

. .. .. ... .

. .....

..

.. . ..

.

. ..

. .. . ..

. .. .

DATEk

.... .... .......

. . .. ..........

..... ...... .... .

..

... .

....

.

.

. . .

. .

... .

.

..

nac ronu m oo

o, nac"

OFFICIAL RECORD COPY

.

---

- - - - .

.

___

. - -

- -

.

,

.

APPENDIX A

NOTICE OF VIOLATION

Arkansas Power and Light Ccrpany

Dockets: 50-313/82-13

50-368/82-10

Arkansas Nuclear One, Units 1 and 2

Licenses: DPR-51

NPF-6

Based on the results of an NRC inspection conducted during the period of

June 1-30,1982, and in accordance with the NRC Enforcement Policy

(10 CFR Part 2, Appendix C), 47 FR 9987, dated March 9, 1982, the following

violations were identified:

1.

Failure to Adhere to Requirements of Jumper and Lifted Lead Procedure

Unit 1 Technical Specification 6.8.1 requires that, " Written procedures

shall be established, implemented, and maintained covering . . . a.

The

applicable procedures recommended in Appendix ' A' Regulatory Guide 1.33."

Administrative Procedure 1000.28, " Jumper and Lifted Lead Control," has

been established in accordance with this Technical Specification.

Section 6.5 of Procedure 1000.28 requires that the person removing a

temporary modification and the person verifying removal and restoration

of the equipment to its normal configuration sign the appropriate space

on the Jumper and Lifted Lead Log Sheet.

Section 6.1.4 requires that

the Plant Safety Committee perform a quarterly reevaluation of temporary

modifications which have been installed for longer than three months.

Sections 6.7.1 and 6.7.2 require status checks of temporary modifications

monthly and prior to startups following maintenance periods.

Contrary to the above:

The jumpers controlled by seven log sheets were removed on April 14,

.

1982, but the restoration signatures were missing from the log sheets

on June 21, 1982.

The Plant Safety Committee did not perform a quarterly review of

.

temporary modifications between March 17 and June 30, 1982.

The required monthly and prestartup temporary modification status

.

checks were not properly performed between April 14 and June 21, 1982.

This is a Severity Level V Violation.

(Supplement I.E) (313/8213-03)

8208180057 820727

PDR ADOCK 05000313

O

PDR

.

.

-2-

2.

Failure to Control Access to the Security Key Issue Room

10 CFR 73.55(d)(9) states, in part, that "all keys, locks, combinations,

and related equipment used to control access to protected and vital

areas shall be controlled to reduce the probability of compromise."

Contrary to the above, at 1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br /> on June 22, 1982, the security key

issue room was left unattended by security personnel and the sliding

glass window, through which security keys are normally issued, was left

unsecured. The unsecured sliding glass window would have allowed

undetected access to security keys that are used to control access to

the various vital areas throughout the plant.

This is a Security Level IV Violation.

(SupplementIII.D.3)

(313/8313-06; 368/8210-03)

Pursuant to the provisions of 10 CFR Part 2.201, Arkansas Power and Light

Company is hereby required to submit to this office, within 30 days of the

date of this Notice, a written statement or explanation in reply, including:

l

(1) the corrective steps which have been taken and the results achieved;

(2) the corrective steps which will be taken to avoid further violations; and

(3) the date when full compliance will be achieved. Consideration may be

given to extending your response time for good cause shown. A written

response to item 2 is not required since effective corrective action was

immediately taken.

Dated:

July 27, 1982

>