ML20062K481
| ML20062K481 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 08/10/1982 |
| From: | Schroeder C COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20062K482 | List: |
| References | |
| 4718N, NUDOCS 8208170223 | |
| Download: ML20062K481 (2) | |
Text
r 4
^N Commonwealth Edison
- ,e Q O ) one First National Plaza. Chicago. Illinois 1
O Address Repfy to: Post Office Box 767
/
Chicago, Illinois 60690 Augus t 10, 1982 Ml!(CIP,LSygF L/duJnt_'~j--
f3 i
v i
S:
una Mr. James G. Keppler, Regional Administrator SS5Mhf2CL[Z:
Directorate of Inspection and 8p' f V2.]!!Q
}sdQ,,_f._,
o Enforcement - Region III
. d3_?F lH.0 l
U.S. Nuclear Regulatory Commission yMTP l
~~
799 Roosevelt Road OL s
Glen Ellyn, IL 60137 3L l/lLE
,A(,,-
Subject:
LaSalle County Station Unit 1 Structural Bolting Tightness Inspection Program for Reactor Containment Valves NRC Docket No. 50-373 Reference (a):
Amendment 3 to License NPF-11 i
dated July 15, 1982, Item 2.C. (31).
Dear Mr. Keppler:
The Structural Bolting Tightness Inspection program has been completed for containment valves.
The results of this inspection program are contained in the following attachments:
Summary of inspection results - 2 pages Engineering evaluation of the inspection results - 1 page Inspection data sheets - 48 pages Inspection program description - 8 pages A copy of this information was given to NRC Region III l
Inspector Roger Lanksbury, during his July 17, 1982 on-site review l
of the inspection results.
As a result of his review, some additional data was obtained and additional information was added on j
some of the data sheets to clarify existing inspection data.
i l
A total of 2,600 bolts essential to the operation of the valves were inspected.
Of these 2,600, 5 bolts were found to have j
tightness discrepancies.
These discrepancies were reviewed by CECO Project Engineering and determined not to be safety significant.
Therefore, a nonconformance report was not initiated.
The inspection program for valves outside containment is being developed.
The inspection work will be completed before January 15, 1983 in accordance with the requirements in Reference (a).
8200170223 020 Bio AUG 12 E02 PDR ADOCK 05000373 J6J.
i 4
J. G. Keppler Augus t 10, 1982 We had previously agreed to transmit to Region III a report of our inspection activities.
The enclosed information fulfills our commitment for those valves inside containment.
If you have any further questions in this matter, please contact this office.
Very truly yours, k
e})a} %L C. W. Schroeder Nuclear Licensing Administrator Im Attachment cc:
NRC Resident Inspector - LSCS 4718N i
3 l
,