1
!
'
,
,
AUG
3 gh{
'
Docket No. 50-483
Union Electric Company
ATTN:
Mr. Donald F. Schnell
-
Vice President - Nuclear
Post Office Box 149 - Mail Code 400
St. Louis, M0 63166
Gentlemen:
This refers to the routine safety inspection conducted by Mr. K. D. Ward
of this office on July 12-14, 1982, of activities at Callaway Plant, Unit
{
1, authorized by NRC Construction Permit No. CPPR-139 and to the discussion
'
of our findings with Mr. R. Powers and others of your staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
'
examination of procedures and representative records, observations, and
,
interviews with personnel.
,
i
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
i
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
!
NRC's Public Document Room.
If this report contains any information
!
that you (or your contractors) believe to be exempt from disclosure under
<
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
j
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
,
l
please notify this office promptly so that a new due date may be estab-
i
lished. Consistent with Section 2.790(b)(1), any such application must
'
be accompanied by an affidavit executed by the owner of the information
i
1
!
t
.-
8208170113 820803
,
DR ADOCK 05000
.
'
.
Union Electric Company
2
3
,
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
!
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
i
the specified periods noted above, a copy of this letter and the enclosed
l
,
Inspection report will be placed in the Public Document Room.
,
We will gladly discuss any questions you have concerning this inspection.
l
Sincerely,
/s/p N JfanL
W. S. Little, Chief
Engineering Inspection Branch
,
i
Enclosure:
Inspection
Report No. 50-483/82-05(DETP)
,
cc w/ enc 1:
W. H. Weber, Manager
Nuclear Construction
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Region IV
K. Drey
Ronald Fluegge, Utility
Division, Missouri Public
Service Commission
i
t
J
R I /
R
RI
RIU1 [
t
I
y
ll5
/,,p
ie on
h i-lin
Lit
7/29/82
i
^
.