ML20062K005
| ML20062K005 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 11/12/1980 |
| From: | Alden W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20062K002 | List: |
| References | |
| NUDOCS 8011180673 | |
| Download: ML20062K005 (9) | |
Text
_ _ _ _ _ _ _ _
A V t K A G L-UAILY 041: e O@k L e 's : i DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 l
DATE NOVEMBER 12, 1980 4
COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGIN E ER-I N-CHAR GE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH OCTOBER 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1064 17 1075 2
1068 18 1077 3
1065 19 1075
?
4 1067 20 1069 5
1067 21 1072 6
1069 22 1072 7
1072 23 1074 1073 24 1072
')
1073 25 1073 10 1075 26 jo73 11 107?
27 1070 12 106' 28 1074 13 1071 29 1072 14 1076 30 1079 15 1079 31 1073 16 1076 l
I 3011",[s3
AVERAGE-DAILY UNIT POWER LEVEL 00CKET No. 50 - 978 UNIT PEACH BOTTOM UNIT 3 DaTE NOVEMBER 12, 1980 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE I
NUCLEAR SECTION GENERATION DIVISION-NUCLEAR i
TELEPHONE (215) 841-5022 I
{
MONTH OCTO8ER 1980 l
l OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
(MWE-NET)
(MWE-NET) 1 1047 17 1057 2
1049 18 1054 3
1051 19 882 4
1051 20 0
5 1050 21~
0 e
6 1053 2?
O 7
1056
. 23 0
i l
P 1055 24 0
1 9
1057 25 0
i I
10 1050 26 0
11 1055 27 0
12 1053 28 0
13 1055 29 0
[
14 1058 30 43 15 1060 31 460 l
16 1057 l
r
~
UNIT SHUTDOWNS AND POWER REOUCTIONS DOCKET NO. 50 - 277 UNIT NANE PE ACH BOTTOM UNIT 2 DATE NOVEf98ER 12. 1980 REPORT MONTH OCTOBER, 1980 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 441-5022 I
l l
I l NETH00 0F l LICENSEE 15151EMICOMPONENil CAUSE AND CORRECTIVE I
I T YPf l DUR AT IONI RE A 50N 15 HUT TING 00WN 1 EVENT l CODE I CODE l ACTION TO NO.l DAlf l (til (HOUR 531 (2) I REACTOR (3) i REPORT s I (4) I 153 l PREVENT RECURRENCE I
I I
I I
I i
I I
h0NE I
I i
1 I
i 1
I I
I I
l -
1 I
I I
I i
1 til 123 (35 (4)
F - FORCEO REASON MET' HOD EXHIBIT G - INSTRUCTIONS 5 - SCHEDULED A - EQUIPMENT FAILURF IEXPL AIN) 1 - MANUAL FOR PREPARATION OF DATA 6 - MAINTENANCE OR TEST 2 - NANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LERI O - REGULA10RY RESTRICTION 4 - OTHER IEXPLAINI FILE INUREG-0161)
E - OPERATOR TRAINING
- LICENSE ENAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHERIEXPLAI41 EXHIBIT I - SANE SOURCE
.4 i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNET 3 1
DATE NOVEMBER 12, 1980 REPORT MONTH OCTOBER, 1980 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M. A L DE N i
ENGINE ER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR 1ELEPHONE (215) 841-5022
~~
l l
l l
l 1 MElbOD OF l LICENSEE 15v5TEMICOMPONENil CAUSE AND CORRECTIVE I
ITYPElDURATIONIREASONISHUTTING D0dN1 EVENT l CODE I CODE l ACTION 10 NO.B DATE l till lH004511 (2) l REAC104 43) 1 REPORT 8 l (4) l (Si i PREVENT RECURRENCE
=__
i 1
i i
i l
I i
I 16 l 201015 l 5 1 247.3 l 8 8 1
i NA I E8 l TRANSF l UNIT WAS SHU1DOWN TO REPLACE 83A8 1RANSFORMER l
1 1
I 1
l 1
I i
11 1 601030 1 F i 013.6 l G 1 3
1 NA l PA l INSTRU l AUTOMATIC SCRAM DUE TO GENERATDA POWER LOAD 1
1 8
l l
l l
l l UNBALANCE PROJECTION I
I i
1.
I I
I I
I 18 8 801031 1 F l 000.5 l
& l 4
l NA l HA 1 INSTRU l CORRECT FAILURE TO COMPLETELY REMOVE SLOCKING l
l 1
8 8
I I
l l OF ELECTRIC POWER INSTRUMENT (C.T.)
l l
l l
l l
t l ASSOCIATED WITH OUTAGE NO. 16.
I i
l l
l 8
I l
l REACTOR REMAINED CRITICAL.
I I
I ----- 1 I
l I
I 1
l l
l 261.4 l l
3 8
1 I
til (2) 13) 14)
F - F OR C E D REASON METH00 ENHIBIT G - INSTRUCTIONS 5 - SCHEDULED A - EQUIPMEN1 FAILURE lEXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA S - MAIN 1ENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY 5HEETS FOR LICENSEE C - REFUELING 3 - AUTOMA11C SCRAM.
EVENT REPORT ILERI D - REGULATORY RESTRICTION 4 - OTHER IEXPLAIN)
FILE (NUREG-0161)
E - 08ERATOR TRAINING + LICENSE EXAMINATION 1
F - AUNINISTRATIVE 15)
G - OPERATIONAL ERROR (ENPLAIN)
N - OTHER ExPLAINI EXHIBIT I - SAME SOURCE i
!s i,
OPE 2CTINS EATA Ef;0RT 00CRef NO. 90 - 277 DATE se0VEMSER 12,1990 CometE7fB RY poolLADSLPMTA ELECTRIC Comp W.W.ALDEN ENGINEER-IN-CMARGG NUCLEAR SGCT1tBe GE80fRAff000 OIVISIOfe-88UCLE AR 1ELEPHONG t2153 841-9022 OPERAT1886 STATUS
- 1. UGIT Malof t PfACM 90T7080 Uset? 2 1 NOTEss TM15 UeIIT EXPERIEleCfD NO I
I l
- 2. REPORTIIe6 PfR100s GCTOeER, 1980 i
MAJOR DUTAGES OR MAJOR 1
=-
1 I
- 3. LICENSES TMERMAL POWEtth 'It -
3293 i
POWER RGOUCTI0les I
I I
4 NAMEPLAff RAT!Ie6 tGROSS MWfit 1152 l
i 1
I S. DESIGN ELfCTRICAL RAT! pes tieff sowits 106S I
I i
1 i
- 6. MAXIMUM OfPENOABLE CAPACITY (GROSS MWFit 1098 I
I I
I T. 84AXIMUM Of Pf800A8LE CAPACITY INET Mwfit 1091 l
l
- 8. IF CHANGES OCCUR IN CAPACITY MAT!90GS (ITFMS NUM894 3 THROUGH Tl SINCE LAST REPORT, GIVE RE ASON!
9 70tfER LEVEL TO WHICM RESTRICTED, IF Alev (Nf 7 MWElf,
- 10. RE ASONS FOR RESTRICTIONS, IF A80Y TMf5 MONTM YR-70=0 ATE CUMULATIVE
- 11. SOURS 18e REPORT! pes PERICO T4S T,320 55,444 C
- 12. NUM9ER OF HOURS RE ACTOR WAS CRITICAL 745 3,423 41,1T*
- 13. REACTOR RESERVE $MUTOOwle MOURS 0.0 00 0.0 14 HOUh3 GENERATOR ON-LINE T45.0 3,204 3 40,199 1
- 15. trolT RESERVf SMUT 00 wee MOURS 0.0 0.0 0.0
- 16. GROSS THERMAL E8sEROY CfMERATES (MWM) 2.445,286 9,521,479 114,287,123
- 17. Gm0SS ELECTRfCAL ENERGY GENfRAffe (MwMi 029,800 3,145,820 38,224,090
\\
18 NET ELECTRICAL ENERGY GENERATED (MWHI 794,720 3,000,404, 36,624,109
- 19. LPet? SERV!CE PACTOR 100.0 43.8 72.5 l
- 20. Ue!T AVA!LA8ILI1Y FACTOR 100.0 43.8 72.S i
- 21. Ufe!T CAPACITY FACTOR (US!MS NOC feet) 102.0 39 1 42.8
- 22. ustT CAPACITY P ACTOR tusIteS etR estTI 100.7 33.a 42.0
- 23. Uself FORCEO QUTAGE DATE 0.0 1.7 4.0
- 24. SHUTOOwNS SCHEDULE 0 OVFR fef 27 6 MONTHS (TYPf, DATE, A800 OURATIOff OP fACM)*
2S. IF $NUTOOWN AT ENO OP REPORT PfR100, ESTIMATED DAff 0F STARTUPt
- 26. UNITS IN TEST STATUS (PRIOR 70 COR#fRCIAL OpfRATION)*
PORECAST ACM!GVfD INITIAL CRiffCALITY INITIAL ELFCTRICITY COMMERCI AL OPERAT1080
- - ~... - - - - -
,e.-,
.----..----->n----e
m.
n
OPER ATING 0074 REDORT 00CRET NO. 50 27P DATE NOVEMSER 12, 1980 COMPLETE 0 SY PMILADELPHI A FLECTRIC company I
W.M.ALDEN ENGINEER-IN-CMARGE NUCLEAR SECTION GENERATION DIVISION-deUCLEAe TELEPHONE (215) 841-5022 i
OPERATING STATUS l
- 1. UNIT NAME s PEACM SOTTOM UNIT 3 I NOTES: THIS UNIT EXPERIENCE 0 3 I
i l
i
- 2. REPORTING PERIGOs GCTOSER, 19ec l
NAJOR QUTAGES ANO NO MAJOR I
l I
- 3. LICENSED THERMAL POWER (MWTis 3293 i
F0WER REDUCTIONS l
i i
I i
- 4. NAMEPLATE RATING 4GR055 MWEls 1152 1
1 1
i S. DESIGN ELECTRICAL RATING INET MWEls 1065 I
I g
i f
A. MAXIMUM DEPENOASLE CAPACITY (GR053 MW6): 1094 I
I l
I l
- 7. MAXIMUM DEPENDASLE CAPACITY INET MWE):
1035 I
I i-8.
IF CHANGES OCCUR IN CAPACITY RATINGS t!TEMS NUMSER 3 THROUGH 7) SINCE LAST REPORT, GIVF RF45Ch i
- 9. POWER LEVEL TO WHICM RESTRICTED, IF ANY INET MWE):
j
- 10. REASONS FOR RESTRICTIONS, IP $NYs l
.4 THIS NONTH YR.TO-0&TE CUMULAT!"E j
- 11. MOURS IN REPORTING P!RICO 745 7.320 51,340 f
- 12. NUNGER OF HOURS REACTOR WAS CRITICAL 519 5,946 40,7*7
- 15. REACTOR RESERVE SMUTOOWN HOURS 0.0 0.0 0.0 i
- 14. > CURS GENERATOR ON-LINE 483 6 5e741.8 39,473
- 15. UNIT RESERVE SMUT 00NN HOURS 0
0.0 0.0
- 16. GROS $ THERMAL ENERGY GENERATED (MWM)
I,545,144 18,271,434 112.490 b i
i 36,651bN
- 17. Gross ELECTRICAL ENERGY GENERA 1ED (MWM) 507.250 4,065,510
- 18. NET ELECTRICAL ENERGY GENERATED IMWHI 485,122 5,838,*81 35,103,781 l
- 19. UNIT SERVICE PACTOR 64.9 78.4 77.2 f
- 20. UNIT AVAILABILITY PACTOR 64.9 78.4 77.2
- 21. UNIT CAPACI1Y FACTOR (USING MOC NET) 42.9 77.I A6.2 j
- 22. UNIT CAPACITY FACTOR (USING DER NETI 61.1 74,9 44.3
- 23. UNIT FORCEO QUTAGE RATE 2.3 11.7 T.6 24 SHUT 00Ws3 SCHEDULED OVER NEXT & MONTHS (TYPE, DATE, ANO OWLATION OF EACMas i
REFUELING /MAINTENANCF, 3/7/81, $1XTEEN WEENS l
- 25. IF $HUTOOWN AT END OF REPORT PERIOC, ESTIMATED CATE OP STARTUps
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL QPERATIONis FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL QPERATION e
.--.n---
w-.-.
-..,,_.n
,,--,,.,s-w__
..,-a----n--
-,,.-,n-,-p
l' Dockst No. 50-277 At+-hm.nt to Monthly operating aeport For October,1080 REFUELING INF01DfATION 1.
Name of facility:
Peach Botton Unit 2 2.
Shadnlad date for next refueling shutdowns
)
January 2, 1982 3
S hMniad date for restart following refueling:
February 13, 1982
- 4. Vill refueling or zesumption of operation thereafter require a technical specifiestion charige or other license mandment?
Yes.
zf ans.or is yo... hat. i. - ra1, w m m ee,e2 Teobnical Spoo1fications to acocomodate reload fre'..
Modifications to reactor core operating limits sea expected.
5 scheduled date(s) for suhaitting proposed lia---tne action and supporting infozmation:
November 13, 1981 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or perfamanna analysis methods, significant changes in fuel design, new operating procedures:
None, expected.
7 The number of fuel' assemblies (a) in the core and (b) in the spent fuel storage pools (a) Puel Pool - 910 Puel Asaemblies Core - 764 Pusl_ Assemblies (b) y 8.
The present licensed spent fuel pool storage capacity and the size of any incrosse in licensed storage capacity that has been requested or is phnnad, in number of fuel assemblies:
The spent fuel pool stcrage capacity has been relicensed for 2816 fuel assemblies.
9 The projected date of the last refueling that aan be di=ah=igod to the spent fuel pool assusing the present licensed capacity.
September, 1990 y-.
,,---,r
-.,--.m~-
Docket No. 50-278 Attmah==nt to Monthly Operating Report e
For October,1980
?,
REFUELING INIG MATION i
1.
Name of facility:
i Peach 3otton Unit 3,
l 2.
- hadnlad date for next refueling shutdown:
March 7, 1981 I
3 Scheduled date for restart following refueling:
June 27, 1961
- h. Will refueling or resumption of operation thereafter require a tenkniaal specification charyge or other license amendment?
Yes.
If answer is yes, what, in ganam1, will these be?
.r Technical specification changes to maan==adate reload fuel.
Modifications to reactor core operating limits are expected.
t 5
scheduled date(s) for submitting proposed 'i-=<=e action and supporting informations i
March 6, 1981 6.
Important 14a==4ne an==id==tions assoaisted with refueling, e.g.,
new or different fuel design or supplier, unzwiewed design or i
perfoznance analysis methods, significant changes in fuel design, i
new operating proceduress i
None expected.
i i
7 N number of fuel assemblies (a) in the oore and (b) in the spent i
fuel storage poola 3 Core-764PuolAssemblies Puel Pool - 712 Irradiated Puol Assenh11es 8.
The present 14a===ad spent fuel pool stozage capacity and the size of any incrosse in 11a====d stazage capacity that has been requested or is planned, in znaber of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2616 fuel assemblies.
9 The projected date of the last refa=14=e that can be discharged to the spent fuel pool assuming the present licensed capacity:
September,1991
.