ML20062J960

From kanterella
Jump to navigation Jump to search
Summary of Settlement Stress Calculations for Buried Piping
ML20062J960
Person / Time
Site: Midland
Issue date: 11/14/1980
From:
BECHTEL GROUP, INC., EECBECHA
To:
Shared Package
ML20062J958 List:
References
NUDOCS 8011180155
Download: ML20062J960 (88)


Text

-

O Bechtel Associates Professional Corporation

SUMMARY

OF SETTLEMENT STRESS CALCULATIONS FOR BURIED PIPING The approach for this analysis was to model portions of this buried piping for which settlement data is available and perform analysis by computer to deter-mine stresses due to differential settlement. Settlements were applied as displacements to artificial vertical restraints at some key points along the length of the pipe so that the deflected shape of the pipe centerline approaches the measured settlement profile as closely as possible.

Settlements at each and every available point were not input; however, an adequate number of points were used to closely describe the settlement profile. The starting point was chosen as an artificial anchor with applied vertical displacement and with rotations released. It should be noted that this analysis reflects differential settle-ment stresses only in the buried piping. The stresses are compared to a limit of 3Sc as stated in equation 10a of NC-3652.3(b) of Section III of the ASME Code, 1977 edition. This limit was used as a guide oniy. Midland piping i

systems are being designed to 1971 edition of the ASME code with Summer 1973 addenda applicable. Prior to the 1977 edition limits for settlement stresses were not considered by the code.

The Bechtel computer code, ME101, is based on the SAP program and is linear and elastic. Output from the program is in the form of moments at the node points of the model. Stress in the pipe is determined by the relationship:

b o=

g where O""

= longitudinal bending stress i

stress intensifaction factor

=

M bending moment at point under consideration

=

D Z

section modulus of pipe

=

B011180i S F

7

-n Finally, plots of the deflected chape of the centerline of the pipe in the vertical direction from the computer analysis and measured settlement profile have been nade for conparison of final calculated chapo with field measurements.

The request for backup calculations to the stress values originally reported in Table 17-2 is responded to as follows....

1. Updated profiles have been obtained on some of the lines identified in Table 17-2, Rev 2.

IIcv stress values with backup calculation are provided in the enclosed carkup of Table 17-2, Rev 2.

G ese lines may be identified by entries in a column entitled " Corrected Stress Values." Se updated profiles are indicated in the calculation input chect.

2. Updated profiles for the renainder of the lines in Table 17-2, Rev 2 vill be provided in the I;ovember 1900 submittal of responses to IIRC questions.

Results of revised stress calculations corresponding to these upiated profiles will be supplied at a later date. This will be included as a revision to Table 17-2, Rev 2.

3. Review of the UfEC calculations recently provided by the !!RC indicates that certain geometric clenents nay not have been included in their models, nne such clonent occurs at their node points 5, 6 and 7 of lines 26 OHBC-54 which is in actuality a 90 eibow instead of a straight sect _on.

Another source of difference nay be explained by the fact that the IEEC calcula-tions for 26 GH3C-54 vere based on Figure 19-1 vhereas the results in Table 17-2, Rev 2 vere based on Figure 17-2.

The two figures overlap witn station 0+00 cf Figure 17-2 being approximately equal to station 0+60 of Figure 19-1.

~

CALCULATION SHEET P

R EV. NQ.

CALC.NO.

Il ~7 00*

ORIG NATOR CATE

~

~

CHECKED DATE M D b A~*JI)

L L0 JOB NO.

W CT

\\.

Ssrn w rur 57kans IN Bumo Pru.wneruo.

L Ch 3

,,,,eT des C RIP 7/ o ^J O/=

AhJALY.S1.5:

SsRvice lukr5R L.tsses, Couben.sArs h)AYER.11ME 2All35-ONBC-14 2 g 3g - 0 NSt-IS 2.0 "-

I HC.b - lG S 2.4~-ONSc-SY 24 "- DN8 c.- S5r I

/ O - 6MBL 7 8 "

I N B c.

E l 2"- 2 Hac-82.

8" I NBC-3ll 2 C - l 78 D - 2.

z(,"- 2.7Bb-1 f0RT/oN.$

0 t=

O VRIGD P/P/n q LJtTH AVAILA S L E

.5 G TTLC.-htENT.3>ATA t<.wKG MoDELGb A ^.1.b C.o A4Pu TE7L ANALysI.s toAs Pa-R foros eD 70 3>eTenMiae

.5rns.sse.s IM SVRIE.D P/P/AJG bVG TD.D/FF EREM T/A L SET 7 L GAn arNT**

ST71 GMEAJ73 LUGRG Ao>PL/Eb AS

.D/.5 Pl A C GM E'h.I'73 TO Flc r/r/ov.s venvicA L.

Rt.srn.aiu rs pr some xsy po s ur.s 0 AIL.y ALos)G ~THE LEAqY/f 0l=

P/7E So 7)r/AT 77h5

.DarLECTED SHAPd of

  1. G P/PE.CEA/TSR. L.Ju5 APPRo Ac Hes: 7HE N h r A s v At v. D

.SGrrLGMEVr PK;nF/L.G As C L ossLy As PC.33/8LG+ - lnl OTNG2-Loof.DS,.5ET7Wiwurs,

.AT' eat.H As4 GV&Ry A VAlL.ASLE PO/AJ 7" t<>GrLG h.) 07"'

IM P u 7

  • N O W GVETL AbE$UAW MWGCR.a&W PCmT.s M SN.E' U.s e.p 7D c.Lassz.y )sse.stse

-rHe.SeTTLEMEMT PRa f/LEr

~)~MS

.STAALT/AJq Po/NT IS C.Hossu As A F/cr/r/ous AN c-He fL. ) 4)tTH API)UED 3>IsP4mswr I N -->'-p la.e c.Tr y Lat rp Rorarso n.Js R.G LEASEb. IT MAy' BE Alo7E.D ~'

'THA T

~Tf/E THERAAA L R LitJ

'Rs I L EC.75 2>Il=1 GE&nra;L S E77LG M c-^JT STR E.SSES OAJLy

~A A).b AJ07 THERNAl MVPArmc.w S m a.s3E Q

/^.)

S IG.D PIP /^Jq. -Tyg S T)t E.$SG5 ARG COMPARGb To 3Se ALLOMASLE A :.

.S TA TE.b IrJ EC<. ( 10 Q ) or= NC -3C,52. 5 (.2.r) oi=

A s m a

'c o b e

.S & C.

///

  • AAO.520 Sn6

,_-_..-w

O o

s CALCULATION SHEET

~

i c tc. o.

m. ~o.

onsie.4 Ton T (5-^^ M l 1 -> FO 1 o,... m ti.,. a.

l o^ra c,,cx,o o,n Mi2>c4 % n I

2_

7c 2 o m uo.

- cr

-crSe77te-w o,- Smasa in Euma Perus u.erno.

2_

o.f 3 s

INVERT E LE VAT /o M.s KJGRa

.SUPPLIEb By 17+E l

SL)RVsyo& S A +2 b J+nie e

~77/s

.s,arr7Lemen r Ar ANf l

PAR TIC.ULAR Loc.A rto n Ana D e 7 EiL Min ch By SVST? TAC 7/+J f

/AJVotT ELEVA7/aA)

Ar i a d.

SETTLEMGNT I

FRgM ' OR/4/ MAL (hSSJqhl)

lMVsR, ELE VA TIos)'

j Y

M/DG M DI VS

\\

P INVERT ELEVATioM =

ELEVArsoM

  • N ** P/PG

}

,)

l

. -k ELEVATieN Op.y l)

I J A J

lNVERT ENEVATisN

,p v

ELEVATIoM \\

l AY = fpgst4g

)

/N VER7 ELGVATI0hl)(

$gyrg.gyngy7l\\

$5 TTLE M E M T' Angg saven7

[ M

  • * ' ^

N M. 8

  • E35 )UE To S

35*

t 3/PFERGNT/AL. SET 7LikEWT

-2 NC3GSL3Q \\

{:/NALLy', PLo7.7er77FE

.1)E FL.HCYED SHA PE D);; 'r//E C. ENTER L/ne GF P/Ps IM

~77/s y-b/rge7to a FRr.,Ni l

COMP VTER AuA C y.5LS Ab)b MCASURED 5ETTLFM GW i

  • PA. O P'/La AR&

A1ADE Fog c.onypA gis am purt poses +

~77/E FoLLot<ung 1.s r w a Coort.DinA7s SysrEn1

vsEb,

/\\f (VERTICAL UP)

Pt A MT

  • 2.

f y

sourn IL^pj<gsf P

l AAo.520 6/76

..- c,e..

--,ar--

- --~~

c2 ff..

c

.)

  • -./

~

TAsLE 17-2 SETTLEMENT STRESSES OF PROFILED SYSTEMS L o cA,r s oH 4F P4Aw. sne.g.35 setente Imoetion Profile Code ALA4[g TE OF DE (s 74 Tion)

Category Shows in Shown in streseIII L11owable(3)

I*R4FIE lbATA Line I

_Fieure

_ Figure (kell O

(ic.5 0 (ket)

Servloe water lines t

STA.

3+30 36*/36"-OueC-16 Yee 17-1 17-2 Q4 07 15.'1 s2.s-APRtL *19 0+40 25"/36"-ONSC-19 fee 17-1 17-3 37.e 33 3 4.+ oo

.u, - =usc ',e

'ee a i-a e., y-a 21-4 m au-a

. it,u 34.s eq age g lygg p.g A + oo

! ;"-ensC-: s

'es 17-n a ;, s-1 37-3 s ly-a t'

r u.m 33,3 A emi t "T s Armit *v S e

b + 2.R.

i i "- ON BC= ; 7

'ee 1

55eW o-/70_

ll, HsC-8,

'ee

' l' 15-1 43 5

. Apauany als I

o-.ly C L"

' khP-R 3 B'L ENRC *EA 1 'em

' la:

,5-E, L

J I4 =3 43.5

a pe. -rs 2

A AauA alf '7.9 0-52 5 1 *.ume=1;.1 Tem t '-n

,t-C 1.' }

24 4 45.0

'.ig py, '7 9 o + 2.o s=.,aso-; :

ma n

Es o

- a c.a

  • 47.5 g

o+S

s -P.sso-;,

no 1 -L us-u u

TA MUAd V

'7_T ig7.a i

74 994g,y cyg Condensate water line i

O+4 95 so -taco-1st no 17-1 a 1s-1 17-a a_1s-1 (Ti'al 2seg dT'30 504-APala. 7 9

{

(1) Analyttoal values generated from settlement gage data.

j la several sones. These sones will be subjected to further lavestigation.nounding ja emoese of the accureof of the gage was necessary (2)

Equation lea, ASNB section III, Division 1, pubsection NC 1

1 i

2

! \\

l W

i O

s.g 1sion$3 N

tilRn

g4 PIPING ANALYSIS CHECK AND COVER SHEET P.w I or 4 k,i/

SPECIAL STUDIES I

PROJECT:

M'D/AA/ d I*'[f - 2 SHEET OF JOB NO.

72 2 O PLANT DESIGN GROUP I

SYSTEM:

f % J O s J J A f;r' Y21/A A*%2' CALC.NO.

400'7 ISO NO.

M-!6 7 [h REV NO.

O f

l A. DESIGN DATA:

B.CRITE tIA/ OBJECTIVES:

-ve &/ //e dew

t. Avne cou sees st-4si Je.cis ta j..s.c d A y.> d ir lo (rap - lei. is) fJesa,,bl d[Hesse.J <<eI

/!. e.

A G"- 2 fj3.0- t l e e d Aefm'Aem!"l

}l'd f.

gf;pf J.165 &n2 AMNic1.BC, n-3652.'3(l)

KC - 70 C.S. h.10a : 'f" 630e 2. 00

$ kocx fdsr.ugNraficw -

c. REpEReNCES:

$,, /,,y,*,, f yy,,g,,y. g, y i ASW 0/Cf5, YdAJ/CT$od-$

2.NEJOJ Aad:,fAC17(Jaum 04SL40

' Afd hdMMAf f.g, f '79 [NA*fA) Srerwus)r G-29-79

s. ai A1-6 A'su, sw 9srA Jaxxw - r<x..s '79 4.SaAGMD NArlin Asr4r :

r Sk-C-GSo de/. A $* fAA9 Yo9/$!C 2 AA - AZ4 0 it-is7(2) Jfed G D. DESCRIPTION OF ANALYSIS / STUDY PERFORMED: 9;risjisr ax OsrrAsMiar OrAs1Jit is A aa is p /pls; l }{f-JO! - 2,*drAA 44sric.,AJAnsit \\ j.sr p. 2 c,"- 23/3 D-3 &nics WA' m / bis Jahy 4' r 7lm d $'ast-Sch/AArod,Ax.ps. r .2/s,*r 2 itixsDr japs. E. CONCLUSIONS: d, = ', " J/ dd, 15 - = 16063 3Se = 47100 p'd j a .fa.10 a or Al0-3652 3 ()) 1.t '/kl OK, l I ACTION f _NAME SIGNM / DATE j l @yfod,Wf*toYtMVa S jar 0Af) AVN jj 80 i cALcuuATeon av 5 CHECKED BY C,k ///7pf" CY [p,k //- 7-[o 7 APPROVED 8Y A. F:>A re u 2 CrM it-g-so 9 12/74 KW/ FO ,wy.. _ _ _..

\\ PMszor+ '/ 1 FULL PROFILE SETT1 FMENT GAGE DATA SUt2 MARY I TABLE No. 2 PIPELINE DESIGNATION 2s-2 m -1 l NOTE: SEE FIGURE No.1 FOR LOCATION OF PPEUNE AND READOUT PO'NT i fd DISTAN2E FCM REtuXyJT point NVERT ELE % TON ['u.uct,4jsrCohWENTS ,a f j (FT.) (FT.) 24" l - F-7 9 i o m as l Ib" b 8.0 623.27 18.o 623.25 14" 16 2s.o e23.20 3.O " AS 1.44" 36 as.o e23.33 1 t C I i i l i I l l 1 ? h MIDLAND PLANT DIESEL GENERATOR BUILDNG i MIDLAND, MICHIGAN N ~ Cali!ON% INSTRJveTTATCN EN3 NE2iPS 1 -..--. v. -. .y _,_,-.#._._--~.~-,y-..., _.... - - - - _ _,

PA M cW + .... = t ~ + w. u .,a p -9 n. ... YJ a 3 e_

  • g%

.. ~.. r ,Y . n .e ,.l........... - - =_.,f.\\ "^' =n -.Q /'4'..- = y 2. 4... b.- I' I. 4, T*- d .e y,... e. .,, i I rT. ...*b.. i ... %) N .a.. .L. f...... L*.)e . _.,.I... .t. C ..........-......l........_.f............... T -.........f.-.... ... ~..... .t ... l.. ...t. .l.. .l. _ t... 1.. 3......... ........r. 1..... _......) .f.. ..1.. ..I....... .I.... ...............................................e..... . = - - -.. .s.. ........t.....!._......_... f. .............. ~..... _.. ......._..3............. ......... I..... ...l ..f_............... ......l.... ..I.. .....=.....t.................................t........._..-................................................... 8..... ..7. ..t.. ....I......... t....... .t.. \\ l.. ..g 1 1 . en. -.1 s.".... --.1... .e s .t ._t.... l 4.......-.....3.......

3...

...............t.........,.. t 1.. .....3......_ f .t.... .t........................ .e m .... _..... _..............................._._...f....... ...t....... ......f f............ ....I. e e, ..*t*..... s.. .... ~... e .,t. ..g-

1...

g g .9.... ,w 6 .. =....... ....I............ 3 ..-.-a...... .l... 6 .t. 1-n w =. # 4.. .f. m t ..s t.- t. 1 m a t . t. g.,. ^. 1" ..N ee L M;.. .1....1.. ....I.... t........ 1 t .t.... .........3.... .).. . 1.. 'T. a.. ..I.-. 3 . 3.. . m. 4. t 1.. ,.o.s. o 6 g, g gp .._..t ...4 e., ..t ... 4. i . 6; l t .v.. l i V') A P

PM e 4 o s: 4-CALCULATION SHEET /OO'T R Ev. NO, / CALC.NO. ~ 7" ~7" d' ' ' OATE /

  • d/ ? v CATE CHECKED ORI INATOR O*L

/

  • )A AY Ydf A

lAAO ~ JOB NO. PROJECT 2b""2J b~4 / AE' SHEET NO. SUBJECT d# lff.: 0 A d. } ?. f f* $ 0 l f0 ) U '. & 1 Q 11 - i.4 4 " SK-C-650 Av. A 0maral-n' Alf : JACi7 (Q45L40 G-29-79) X 38 26"- 2 3A D -i (42. GA4'- G") 'O, h~'a 7 '- o " 3'- o " (i ' ~ = ~ T. L. T. t. LJAY:-2.4" A,- l 0 '- ,/ g i 'o., s 28 N %'e d'- i s '4. o., N (d N ,/ V 2s"-23A D -t (buuwr i. 2M//'7' = 120..lO ad dpr b32/F7': M8.50 tif Ad Jp+ 1 r AAO 520 6/76 l

.t l1N}UT LATA ELAh 'DATE 06 TITLE

26->JcL-1 LAST VALVE FIT TC EISLR fNvN. No. $45440 C/
  • f/ 7 /

' ' PR OJ ECT NUME ER : 7220 PROBLFM NUML ER : 1007 USEE

SJ 1

' ! l LOAD CAEFS f l i l'f1i i 8 I j COL COL COL COL COL COL COL COL COL j 1 4 7 10 21 32 43 51 61 71 80 + + + + + + + + + + + 1: li E D TI T L E.= 2 6-2 J B D-1 EAST VALVE PIT 2: TO FIS ER,PR OJN0=7220, i 3: PRobN0=1007, UNITS =2, i 4: CODE =B31S73,USLh=SJ i S: ANC 1 -2.40 E= 2 7. 9 E6,0D= 2 6. 0, TilI K = 0. 3 7 5, 6: LLS/I T= 2 7 8. 5, Tli LRM= 0. 0, 7: RA=0.9,RB=0.9,RC=0.9 lI 8: 5-5.0 9: 8-3.0 ll* 10: PAD E 1.0 EISF=-2.16 4 11: 13-5.0 12: 15-2.0 L e 13: 18-2.12 2.12 14: FAD 18 1.0 DIS P= -2. 4 15: 23-3.54 3.54 3 8 i~ 16: 25-1.34 1.34 L 17: 28-3.0 12: RAD 20

1. 0 -

DI S P= -3. 0 19: 33-5.0 20: 3P-5.0 21: PAD 38 1.0 DI S F = - 1. 4 4 i 22: LND t + + + + + + + + + + + 1 4 7 10 21 32 43 51 61 71 80 CCL COL COL CCL COL COL COL COL COL O i l e 0

' ggc.w-SPECI Al. STUDIES

7..

s PROJECT..b l D L A M S _.. # M b SHEET

1. OF 7.

JOB:.0 7110._ Pt AfJT DESIGN GROUP SYST E *.i.. SER.VicE..W ATER. SU PPLY._ _.._. CALC NO. ./oo3 150NO. .M-I.69.(O) .. R E V NO. 7 A. CESIGlJ DAT A' B. CRITE Rf A 'OB.f E CTIVE S suis.712c-H-4 81 (C) To show T a A T T H r-sTErsm I)Pipswq Ct. ass Re.V 19 IN Boesep PPi N4 DJE To DiFF E12 E.cis At 5 ETTLBtrfBNT Pgpg.'3,G c.315 ~K. W AU. NC"c7 W8 cc D E. R EQ g g qeug y7* M ATr El A t

  • , SA ISS dAks ::, Gv te 70 h3C. S G52 3[E A S A, g sEC11 ;jf!.2 4 3g, h Seit k Q.oM ins rqu Mg M7A'TlCN EG.10(a),

1977. FDt L pro FIL E SLTTLCM N C. REF ERENCES: 6 A Q, D AT A J U NE 12.f l979 ) ASM E sac { Ct.jBsecTlex 3 NC* 36 g - CHOC-19 MElot Ruy D7 f21-7f SNUM { $ 4 5 M +L 3)S R2. FuLt. PEo Fit.E 5(MLP8db/T .m >T =, z. iw n's :t :.2o se '- 4 5 K-C 475 sca9syco PrPr.it#- PitsMLas

5) T ARD P 9144 Pt AM - AQt. A C 1

u.1s,(Q) D. DESCRIPTION OF ANALYSIS /STUCY PERFORMED: DW F G R. E m \\ AL. S6.iTL.C ME N T s 7Re.s GES IN FhO El2O P t R NC'n M 6tO ! - L(NE A9. E.1 A S T ic AN A l-y s lS. 3 c"/::.c '- o n ro c t 9 : sa w ce WAran. suPPt-x HEAcm - A{H :. 56976 j E. CONCLUSIONS: MA At DP fo e 3 S c. -

52. 5 c0 E d.. iO (o)

Op oc.sss:..s(b) is met. j o ', O.K. I ACTION NAME SIGNATURE DATE h C AI Ctri ^110N Ilv 8.)(AyyAy[poig,g,agee,} [ 4, wp j IJ-7.h. E e.nt ct:r o en cu4yg4 pa e, p,j 3 [gfj g a,7v T.@ 11 - g@ ^s t'novro uv A.p g[g, tg g-So i%.'2..^u?l; 1.",;;':. ;; r,~ ~"~ ~"~~'- S

~ \\ ] S14 2. ef 7 w, CALCULATION SHEET OO3 REv.NO. CALC.NO. b'I M M M {O'E S.d D C)DATE 'M 7 *b ' 9 D ATE ORIGINATOR CHECKEO bM M D b JOB NO. PROJECT ""' I ~ SUBJECT SHEET NO. S A72f-(0 _s Mv.17 g 2.rze..co EL G16-? or I 6 Jf7 4.5 ^ g gg,oo Et. 621.'-9 g ild.N -..- 5 gg g 17 *. L ... g, gt..'lA" s 4%L CL 4 - y @ 5 6t%.o 6 .gpy 4L39 S' fo46 *'31 a.s c274" c.5 6 '7z s. 4-6 a ?Q.cb6I W T ,b (_ e-@ G'ob.31 '12d.4% (oG.G k 00 4*T! % GeGM 54-7 6 35.43 3(o.E g +ws.sc Lec.Os qt g.t g5 i me.w o ns.oo o g$ .. ~-. yo, o g.. - l'2 2. 2. &.-...... t O '%Tg p,e@ y IL4 66 f p. ,go, u. g b lb.ao 'bla y " 'g g. 's47. 8 5 2 6*6. G hY 3d O O h ( a. AAO.$20 6/76

3sa1 ~ 1 ( e CALCULATION SHEET ga 003 REV.NO. CALC. NO. - s.k w A f k s.J u s) ATE f-2 8 -7 y W* Il-7 PO

  • OaiciN Ton ATE CHECKED i

p twDLAND l $- 2_ 72_2.0 i ,,o,,cr sog no.

    • O

-- [ SUBJECT SHEET NO. / 7 23 q L hE.sau Gc \\ 2caoux,- .aY C,d no om 0 ' @6.o3 626.96 -O L - I.to i .. 20 .S.Lz .4 42-.- - 6. W 4o c.45 -6.% 4 - ].= s Go ) -F.4 ~7 -6 72_ Q -7oT 1P 626.4G (,24 - o I - E.7_T - - G.r6 l** 6.15 . - 3. G D _ _.... -3.24 120 6:10 -3.co - 3. f 8 Ko 6.2b -3.co 4- -5h 16 o j 6:2.i -i.l6 - 2.64- _.. 100 b% +5 fo.27 .1 86 _.. - 2.W 200 6.37 . 6.16 - 7.G 2. S 2 20 b.-Es' L.1% ~ I.20 240 6.2o 6.1% - 0. 2. 6 22 6.I't 6.12 0.00.d' 2 60 6.o5 6.00 -o.% i Zoo 5.96. 511 - 2.~7 f-azo 5.%1 5.Go - d Js W.. 6J% 6.~.:o - 5.% l 5bo bts. 7o 6.26 - 5. 2.s..& 380 l $.il -7.o s 400 f.o2. -L 16 41.0 4.93... -4 44-4@ 511 -7.os 4-90

5. t.%

-S.cd-2 ._ 50? 5 Ao..._..... -- 3. 6 o_..._ _.. l . 5.44 - 3.i t a - 540 E.n -3.7 2. i Sto Eao -4.60 E80 l 5.25 -S.40 + 6oo E.'2d - 3.1 2-620 {

5. %

-o.4% e AAC.520 6/78

h 4 cP 'l .p ' - : '..'.F;i;'. \\/ ~ < :.*;';:.t. ...~. e..

C. *.'

l l -' MCITEMCA Cf.TM"?t.4J16 5;OL.OEBEiRG Z OlNO OL._JNNICL_IFF W ASSOCI ATE S.11 June 12 1079 File No. D-2220-R _N O__T.1 : l'1.1 ASI: ItOUT1. Tills QWIP1'I.li COPY TO Citt!C} MC CONNJ:1.1. 13eelit el Power Corp.. P.O. Box 1000, Aun Arbor, Mich3 pan 4830G At t ent. ion : Mr. R. 1.. Cast.2 ebert y Re: H3 d1 and 11nd t n 3 E: 2 Results of Tull Prof $1e Sct t i crnen t Gar.c Measuren.c nt o Gen t le:rnen : Attached brrowith in Sum rio ry To b1(- 14 for full profile s e t t l errien t gnge measurements a n P3 peli ne 30-011DC-191/20-OllBC-3 0 a t the.=ubject project.- In rev$cwing our records, vic have d$ecovered on error in the certurri of Summary Teble n unib e ri n g. Picase reier to 78b3es SA nnd Sit for pa pel ine 20-IIICD-100, t ransm3 t t ed to you on April 24. 1970. Th e er.- t ables shouJ d lie n unib e r e d SD ana SC respect ave 3 y. Very truly yours, ydb' <-.**vs', /[/S4 7 Y;RU:me K. R. Be3cff 1:n c lorsu r es SL) ~1 C-)WC R ROAll NW7 ON LJPiT f-7 i A1 t S MASS C)~dil54 C-317'- 24 ** 3 5 8 3 8 8 % S t t t t 18 9 8 9 T 3 f t f T*3

  • f t t a E s t t t T1 T S T E t t t t t t t T15 t f t ti f t s E t t t t t t t t t *TE T t t tT T T T TTYT fT 9 T E S T ?'

f 9O&4&&OO.&&A&&&ke**AA-AA M O.

-. ~ 28 s of 7 w \\ FULL PRWlLE. SETTLEMENT GAGE DATA SUM TABLF No I4

t G f ilit tr--19 LOOATr#; OF REe.OGIT M PF L IHC- (NStGt4Mtott...l."E$[."

rQ:NT SUI 'II Ill IILIIY I CI-D A'I I 3: l'1 T P :'~l 1:I T 3I!!;l Et.CVATION OF PtPH tMF BEcuTtt PowEn conron ATtott--.1dLJ5tHVF.RT NT RE ADDUT KliMT AG Sunvt.YED DY s zc..o3 Fr - t Ci. STANCE FROM WVERT READOJT pot.NT ELEVAT lot 4 COMMENTS (fO L. (fI) Rs.F 4y 0 M0.0 G35.OG

  • P ac" 3 s,pt.

-oh - 40.0 _ - -. G25.G2 G25.45 - f ah - GO.O 4*% - GUS.47 / 00.O c::G. 01 "'"" -(s. 7 t_ 100.0 2G",ps,jen -6.t_T ' CPG.35 130.n - 3. e o ~ 02G.20 140.0 -3n G20.20 100.O - 3. o o - C20.?7 s 180.0 L c20.27 6" a ~2-* 14 ' 200,o -. 7. i t. - ) G20,in ' 9. Popj tjpn .t { ___ c20 l.a "Y pi <.ii.f'@i uii ) k t ??O.O f 240.o elie g eo e _-stn c20.28 ' ;* ~ 20O.0 G7G.12 380,o 00 cuo,oo 8 #1 l 3Od. k) f G05.72 - o 36 ~ t 320.0 - 2.76. G25.LO 58'1 "~ ~ ~~ t 340.O nun.ko 2 {, _ 3G0.0 T-} _ pog u hg p g-g,3.,,g,h. g,g,4.+. s,,f G2b.tG H "# checked o t. 3 4 0 1.lu 15 L 3 0 0~ N' 380.0 02!. 33 ',5 ".O 400 O 7.0 y Gu r,. 02 \\ y g 420.0 \\ G24.Ot4~ - 7. /(, t I -95 6M. s c:. 440.O I O24.94 B' ann.n ne r.. n - 9. i t } ano.O -7

  • h '

t._. n: r,. 2n f x ..it J - s.o c c y Mlf: / - ID Ps.. tidCHlGN4 .l U (.A # )1 ( t. 3 t' J .f =4 44 I I l.P /.T ' 41 M l'. V al l f *8 & @ l%T. It 8t1111111111111711i t 5 t t '.n:ti t ;;t t t t i t t tit t 111 n 11t ' t t t t t t' t t t t t t t 7711 ti t t i t im il t'i t ! ?

  • C

..p g ii_*... _.i_m.

4 ~' . r-. x..~> -.. - c-x-.,w. r=- =_rv z.,_.; m.+go >.,,.- %,.m. g, >. m -,:.m.n._ e.g...: ,.r..,n.,= . w. c-,+-w m -- --~.<an-Gu s ce] : ...i FULL PROFILE SETTLEMENT GAGE DATA

SUMMARY

3 H. 0111 tC-15! IO TABLE No. PtPELINE DESIGNATION 2.G-OIMO 3.9 LOCATK>N OF READOUT POINT U$fEf! N Silj D S'l' V ATI ff I'Ull' G 11: CC.1.l!RI..- ELEVATION OF PIPELINE INVERT AT RE ADOUT POINT AS SUDVFYED BY BECitT EL POWER CO R P OR A'l lON G?b.DD CASTANCE FROM WVERT esa COMMENTS READC8Jr POINT ELEVATION S' (ft) L (ft) GLS 78 AY }. 3.wb e] d da t a.. col 3 k et ed 500.0 025.40 520.O G20.44 3.it'( 32 0. GP.O f t. ),on !!n e): 22,*/ ' 54O.O G25.39 2.7d0-300 f 1.) o. n P.!a r g.h 2 3 s 79 500.O G75.30 41;o.- 580.0 625.25 - E. g - GOO.O G75.3D - s.n ' GPO.O O P S. G O.,, V o. f.T - ~ - J I _ _ = n.v td M IDt..A N D f't n it. AND M!CillGAN i. n g tp"y"9

m...

t m-,,,..-,.,,s..s.,, ...~ i,~...... 4.. r e,., . w.. .M 4 t.,h, v.

T I \\ l l l 1 i "._-t.J.:.=..t......-.....----......-. . :- W.. J =...__.~...c..__,=_-1:.

-.-..=.-*.,___..=._-.7
-

. _.. - - _,_. _. _, ; _ _ ; -. =. 4=..

=.. _-l. =. _ =. _.=;. =. ~J :. r e: :

.n _ ;gv g .._ _ m. _. _ _ ep. ef* __ g _ ;, gn,, _. -.. .;g_ _ _ -

u
--- _ _ __ _ _.-- r -. --- = --:.--- r*=- - - :----*--- * : :. q. : --* --"

I-

__=_

' _7

  • t ' - :-

4- ~ .g-->* ..w__...

_-- =:= =. ;.._..__i = =J..JJr = ~= x* =- !2= - - -*-*-!-'
  • :4 g

y x M:-. J- _. __ _... g__;;.... :. _. _ _ _: _;_;..

,_. _; p.,. -

. =

.r_ ":--- r. - -._ I~: : =.. f.;..

q-u.____. =n : n t u : - : ti n---!= ===.* ::= *~ ~ = - g D= _ ____e n= _-- =_=:-----===:----

==a.==:==__
-. _ _... ;;.__ ;;;,,.g _. -.-..-
,;,_ _;.;.-
,gn ;

D. ._ _j =@.:._ _.2=

====

a

==.._ __ c_. = : t--- - -:=== === t===p __ - - - - = - :_ _.. - - -- n _ : _ =. =._ = ===- Q. N,.__.h -' =. : :. _ - " - -

  • _ _

.___T2.-m---*---'-- _ - " ~ - - ~ O


~1-Q

}y =g ___. c

  • 2

,L' _n .r q -- y 4___. _h =- - -E y -w _ _ ~ - -.. u__ _y j ..a -L. _. M.. e: 2 a:.;::s p -O ,g -.q -g ,_.a_.a...2.2_ t-

_f.

-.e Y-y N 3 - #*N G --- ' "i E ~~TW -I %._. x. 2.---.- ~ v._c...u..._-. o _. _ _ _.. - --_ _._ = = T 3; - = - - _. m.... __= - - --y .

  • _a r y==;,._

.n ____. - w.:x . g_ . _ -.. g, wg _ n= :,, = - _w

    • .T==

.... = = - - ^ _ ~.,

,' g g;4;-*_.=9

. _.. _ - - v_N:; := - - o #, -o:.4 g- _._.____:===..

.- - -.. _ ; n =: __.==. :...

_. _.. - = = - u. 2_.. _ _ _. _ _ = _. _.--- .====:==u_...---=.=---_==. .q.. : g; =- g.. 4 ..t._.. t td, ;r -._.__:-._._.2.--r-_._._2____.._-.=- .. = _.-...:...._._..t==3 _,___1,_.____ n.__.. .__.__.t-t=... :- q =.=__t==l 4..._. = M -.__- _t -= ... = = - - = - = - L . _ f_. __-2.#__.. _ ;--. _ _. y $_..;. _. :==. ~

g.._.

.. _..=- . E_.r. _=_=- 2 .__.;<ca. . =:: - - _: S==t: =_.u =_ _ _ w a =...__.. . 2 _: t---- _t =u r. s,:-_. e =g s '_.=- q m,_. . s - - + - - - - _ .. _.. _ + _... y;, M" n p.i.... =.._. =.;. g. .w 3

  • ~ %,-

_ _ _ _.. =. - -. n.1. _._ e g .s..

o =. :::. _. _.. _.

s q

=== _._.:_

:=. _

_...-._u. .. _, ', *. _.... = J:-' - - = - - r- .==.t-"--W- _= =_.... _ _=. 8 r EE= c.

== = r. n ..___,_g.-..i--+ __..= =.__

,Q =_f- _=_

y 4 w ~ ~' =. _ _ _ a =" m - - >s ---- _ - ~- - - - - - - -..__ s=;- t.= n- - - - 1

--p---

n--=.__:---- _ __ J_.s.:.:=.a- --- g _. _ =. =,. - G

t==-

=1= -- :=- 4., ';I;; C.: ~.a (_%C:~ 2.-__ _ ;. - , ;L p==j_==g;;g, =nz- -.. _ _.._d.._.t ::&- p : ..y....... - _.... _ 67,. _.. .:u --. ~ _,. _, .. m. m.n.,_ .n .= ....-._a m ~ _p. % ~ w - . - + --. :x= =_j r - - - - - ~ t-g, - -...q.__....._... ~ ._- - _.. Mq..... + - " p. L._... _ _. _ _ri ---- n. - n= ::i:*f E!!~*' '.g.. ! .Ir.[ + =i.,"=.--L:==.------*n-- ._.._y._.-'u ' -_== : =.--: S.- :.... .,... \\:. a.-; n .--. _ =.==- t: =~._:... _. ; :l==.. .-;=--

:l

-- - 2 ;- g: ; ; =.--. -. - - -- + ; ; --- _- --- :=E.,.e - .._2 =.2 = 2.!u_nn=r= =,-

.- - e t.

--a- _.. : n: 2. t-== t== -- -- _.. =:=, ;;; ;:-.;. y ;;,. = _t-=-I~==4..."-.-..~ ~- - t u n-- :------- - -- -_- t M -:... s-----b-r- - {..;; : _=- 2;- - :=- i---:.i --.r- = M =::":~.:. ~- m m-1.- -E -N .:.I!bi"ch: ~ N5h.fbb4D i-Mhb NbhNC_h-[Ch:bkQ-hhC[:Efk! ! Q [u.: =55 U ~ -..._ -._.;., n u. yl: = :9... _ g._., y _ p--. ' gl.. .....,..-._-.;;,,,,, -.. 3..u. .n===d r= n3. a- _na- = I:;;:_=; : = $= = E =n 4: u:= g;.:~. p a 3 ::: =.: S=.l. -.===_:= u= =_.=_. =__. 2=ut a= _._ u-- - -. aa :.an:-- ta_a u_. u. : _ 2: =.__.... n.. :... 4........ m.... :: =. . :--=_.. _. - ;n g. .._.tn = ' _;_=---- = _.2... m..,,. i . _ -- _;g=;-

..- ;:, f ;=-~ ;n :;_.;.= r. ".:.;..L.;;.;;;-,

.=:n - .:-.j .. 4._ a __ _ b bO b .N-e..m.. ,,e,,

S uM # Q 4 442. Gl2i/-c I N PU T CAR D IMA G ES NEUT AFD 1 11 21 31 41 51 61 71 S EQ + + + + + + + + 1 RUN LDCASE=THRM1, 2 RUN LDCASE=WT1, 3 HED TITLE = MIDLAND TURS BLDG '. 4 VICE WATER PUMP 11-OH3C ' 5 F R OJN C=7 2 2 0, F F 0 E N O=10 0 ?,' 6 U NITS = 2, CO D E;3 315 7 3, U S ER: 7 ANC 7 -2.50 E=28.3E6,0D=36.0fTHIX=0.. ~ 0 FA=0.9,RB=0.9,PC=0.9, 9 LBS/FT=565.57, THERM =0.0 10 10-3.21 2.25 11 20-E-2.28 2.d 5 -8. 8 3 c.13 S? 12 30-8-2.28 5-8.83'- 13 40-8-2.28 5-8.83 14 EAL 40 1.0 DISP =-6.96 15 50-8-2.28-5-8.83 16 60-6-2.2E 5-8.83 17 RAD 60 1.0 DISP = -6.72 18 ._57-5-7.73-5 % 3-11.421 % D 19 70-2-4.32 25' 1-10 08o & 20 71-0-9.83630-0-6.68 a575 OD=26.0,THIK=0.375, 21 LBS/FT=278.57 22-80-7-3.49 1'M' 5-1.95 G il b 23 90-6-2.28 5-8.83 24 100-8-2.28 5-8.83 25 110-6-2.28 5-6.83 3*' 26 120-6-2.2E e t. 43 5-8.83 27 130-8-2.28 5-8.83 28 140-8-2.28 5-8.83 29 EAD 140 1.0 DISP =-3.00 30 150-8-2.28 5-8.83 31 160-8-2.28 5-8.83 32 170-8-2.23' 5-8.83 33 180-8-2.23 nn,,; s 5-8.83 34 189-7-5.75 5-2.84 L ~ 35 200-10-10.44 0.593 36 RAD 200 1.0 DISP =-2.52 37 210-10-0 0.546 35 220-10-0 0.546 39 230-10-0 0.546 40 240-10-0 0.546 41 250-10-0 0.546 42 260-10-0 0.546 43 RAD 260 1.0 DISP =0.0 44 270-10-0 0.546 d5 280-10-0 0.546 46 290-10-0 0 546 47 200-10-0 0.546 4'8 310-10-0 0.546 49 320-10-0 0.Su6 50 330-10-0 0.546 i'1 340-10-0 0.546 _j 2 350-10-0 0.546 53 354,-4-0 0.218 L 54 360 6-0 \\ l w 1

) 1 SNund q 4 5 H L2. G/ij74 55 FAD 360 1.0 DISP =-5.28 56 370 10-0 57 380 10-0 58 390 10-0 ~59 400 10-0 60 410 10-0 l 61 420 10-0 62 430 10-0 63 440 10-0 64 EAD 440 1.0 DISP =-9.12 L 65 450 10-0 66 460 10-0 67 470 10-0 68 480 10-0 69 490 10-0 70 500 10-0 ,,71 510 10-0 72 520 10-0 73 RAD 520 1.0 DISP =-3.12 _74 530 10-0 75 540 10-0 76 550 10-0 77 560 10-0 70 570 10-0 '79 580 10-0 ?O FAD 580 1.0 DISP =-5.40 61 590 10-0 62 600 10-0 63 610 10-0 84 622 12-2 0 65 EAD 622 1.0 DI S P= -0. 4 8 86 END + + + + + + + + 86 CARES IN INPUT DECK 86 CAPDS IN LOAD CASE THEX1 86 CA?ts IN LOAD CASE WT1 O WAPNINGS O EFROPS 0 FATAL EEECES .00,PL 93. "?EE SCEACH. C WAF NING 10C00CC00000 t .qT,K P ' X E 101. F. E 101 I ' l 1

  • r. E 101 T * *
  • ME101I/FEP05
    • E CCRE CHANGEE FROM 35371 TO 41371 CECIM AL WOR DS

' P ' ?.. SPECI AL STUDIES PROJECT. b IDb M_k Ih SHEET I. OF l JCB NO. . 3 k.2:. 9_... __. PI AtJT DESIGN GROUP SYSTEf.O _N 8 d C-R.. _W_ IAM .6.U E.P L '/ 150 NO. M.16.M).8[M.1G7 Q REv NO. 3$5 } S .S 'IE i CALC.NO ..l_c o 5...... A. DESIGN DATA-B. CRITERIA ODJECTIVES l T 7 ~7 2. 2.o -M - 48'l (dk,)

1) PIPINJT C LASS SHTI.

IN B U 'R1 tr.b ?! PING "DUE TO REV'IT

3; p:F g g erJ T IA t_

SETTt E MENT ~ PIPE : '2. G " ST'> k/ALL MEE r "TH E C c)E R E5LVIRE.6 tv\\ AT L. St - 15F C L.z, gg. k c '7 0 AsMt s e e.. iit a t W come M C '5 65 2 3 ( 4-) ER - (10 a.) 2.) Sc i t 4 Rec.x. lu srev-e t w A M3 ,g 3S c 1: vi. t. pro FILE SE'tTLE* W i~ "iiE q A q E- .t> Ar A - A PR\\ L '"i 9 C. REF ERENCES: hASME. S E.C.. ill, Svastersau b/C ME 101 RU M

  • SMVM' 044 k4b 2.).

s) se.%(R r :%= vti_ %.O

27. c-2. i -73 5

P a.o n n.s T Tt.secNT- <fAGE h "7'A Fli.c : 3 7.2.s,_ g, 37, 4 fL4 l 7.9

4) S l<- C-G 71 SU R.V Ef Eb PI Pe uwe p p.,o g n_ g

~ F) YA O P I P/ NC 'Pf Aus ^ = r^ - c h 167 CA) % 5 ,, AR EA - E _M l4 g(g) g,gy.j ~ D. DESCRIPTION OF ANALYSIS,' STUDY PERFORf/.ED: l.- 1WAN E L A1 T Ic. AN A%'/ 3 I$ T5 h i T.E Tt m N c 'b I F f: ETZthstiat & TT t-EM e hJ T"' S m.E35E'S IA,) 3 V R1 Eb Pi P1M I

2. G"- 0 4GC-55 :

S E RV i C E. WA i t= k SUPPLY L l M F_. I; E. CONC LUSIONS: SS,= 52,scoNi 2 h, 2. 72 5-c 3P h 3 AT e E&.(loa.).oF-AJ C-3 G 57 *3( $) I 5 MUY' hh a ~h.43 Oh

  • Up M bl 4 I2 N res s.:.? M(di) ::, l M L

/ rms res s u nor senet.re ~ '*Wumn Ru"* n uwm 5 ACTION NAME SIGNATUR E DATE cri cui ano., uv C,S4d AVAR.ATU ho R 5 7ACo8slWW P e..M 11-6-RO i I ' "t cri u rn .._ s g 4 %, o in,,, d ll.-). g o A. p A-T p t__ M _ rgp _ t -. 3 - s e ^ O 'tii '. [.Yi$ Y."C,'[uS*" " " '~#* ' ' ^ y-

( CALCULATION SHEET ( "'./ 8005 CALC.NO. REv.NO. dbO 'I DATE CHECKED M## ~ CRIGINATOR OATE PROJECT JOB NO. SUBJECT S~ ~/9 'ON SHEET NO. / AN I g 'X s 4% I.Tc. g/ L ".* 5.. S So %.50 g i, Y I h NY O 6 N/, 1 mod g o l4'b.o'1 r7%+% jA

  • )

9' n S S~o44.*1l " M '*O S 5's t f..co 5 $1t(. 0o g C E~3rA.To E 507 57 hD

6. 5 o 4f..St E. 72 4. 46 4131 66 686.05 Iol-.%.

(2 6.15 '1 (, C,.10[ ' 64.1 6 38 43 7.35 - I. 2. 9_ Tw- ' E1:22 - f4.93 .36.o'7 59.5 6 S'.6 &' 36 4 Sub M er (, ' % b4rf,. . _ _.. _.. h to @ o = _ (, pr,,, l 4 20 :. 1. FT

s. cil6.o E. 6%.o s 50 7.S'7 TA- # /24.44 = 34.39 "

U 12.4 44- ,917. 6T t* &.877 4% 9344'l' E Eoi.57 % 4 60 14 3.o 7 ID 07 41.~1. 64 z $ 5 0L..oo zq. s o 50%.50 4 qq,94, 29 5o AAO.520 G/76

( .Q, CALCULATION SHEET hg# 00 5 g cat.C. NO. REV.NO. b~ I CHECKED'- M^4* - QATE 11-C - 80 ~ ORIGINATOR DATE I k D I b JOS NO. 1EO PROJECT 3-SUBJECT O - N~ SHEET NO. ~ VI x = -59. Ec. C== 3 5 = - 4L7 9 '. pm 67E-5 'i. S c. < ^ 3 5 ' : M 16 {# -/l.f 7 ' $6 X = - 14.o Ceo. B S

  • s 3.o 3' y

14 s $a b5* 20 E = = BD X = -10 oo Cn3G = - T. li' s - to.co Cao 35o -%Il' g NX 60 5 : -tp.oo (As36o = - $ @l gd e e 60 %

- h0.so. Ges360

- 15. l*l s p ^ = SO a 5.~.3 6 * =. 35.e @ 4 AfIh9. PT 30 FT-L = '9 1. % FT % 1 3 64.4 M 444 {. L :. 13' 11" ; rom j h5e Fo 2. D 4 ni PT-b.5 rr ro @ L:.is'ti D o y_ = - 1 5'-11 Cos 35 -/38 2 @e@ -/l.# ' = 13'- a ' S m 3 5 ' =. o bs z'(.s,+) = ym 20 'E =. ~ ~ " ~ I b'- n" + 4d = E I '- n "

. 51.91'

~ (@

59. E' - 5 3 9 t -.

s.6+' - 5.64 i....C.os 3 5 - 4.67 '.. G 1 R~ = 3 23' (s 1 3 5.G 4 5 m 3 5 0- /0 - L '- / ' - 3' n " % 25* - 3.y ' jo 7 = l 3.9 t. ' Sm 3 5* - 725' to 7 -=. AAO $20 6/76 - -. - ~,

~- W ( CALCULATION SHEET IOO5 REV.NO. CALC.NO. "D CHECKE5 du Ar-CATE ~~ ~ ORIGINATOR DATE kk b JOS NO. i PROJECT MC-SHEET NO. SUBJECT s= 30.-: cos a S * = '2A 51 2 -) n l x 2. 30 sin 66 ~ = e y :. - 3 0 Fv k 2i 7.s 59.5c. 4 14 2.c o 314 5% 60 j y 7 50 g i Y;3, ,,7 so -. yo.go = 9. zo' 7 d hx :. 9 2.0 I' 7. 8 ' s.n 3so s @E= 9 2c tes 3 5 '? E4' = = 40 x - 10.o h 2. S * * .f. / b ' T.lY 90 's- = 10.0 Cis $ 5' = / p l4 - in.o if 12.5 o B 214.N 6- ~70. 8D 36, p.363f 17s.77 I To 135 L = 5 31f M 6 9".=. f.3% 5 <N 35 = 3.o9' 1's5 % =

5. sT' cos 3 S * ' 4.4l '

.e e .g e

  • e G@W4 e*e eeaee e

G We -W AAO.520 606

( CALCULATION SHEET _. 005 REV.NO. 1 1 CA LC. NO. 5J G~!h*75 St GATE Ik OmGINATOR DATE CHECKED g M Ib 4N) b ~7 11 0 PROJECT JOB NO. Ob~ !b h 3 7 SUBJECT SHEET NO. i N i h h w 4 23 f 43.oq F g g

  1. 3 29o Tt:>

42.o 4 15 ro + $o 29 60 4 % + s o... 9, (Sb 457

f. 5 '

g c m 43l ou v e t_o I,5CAof w 39 o" = 3.2S ' ( i 4 t I 1 ~. AAO 520 6/76

~ ( CALCULATION SHEET 2 ~ CAk- [ loc 5 h.c _go n gy, yo SI oar, 6 -is-7 s a,,, m,,,, oaicinaroa g b b k7 / i 7110 PROJECT 06-me c - 66 sdr ~6D 6 of 12. susnCT ,,\\'.C & l I 67 Rew % : m R P 'n+ s e v.- c.s77 h 4.M 6 O i s\\ f.11 Jh ,.m \\ c g imma ure se,, u -r v% ,7 3.J- -A 8 9 .4 ' /,0f@ \\0 j \\.03,, [hof31 l'oS + (2.o hif es Ag ,o i

2. 3 2.f

~~ AAO.520 6/76

t CALCULATION SHEET ( "- / !005 cAtc.NO. R EV. N O. 67 b*Ib* b CHECKED A 'OATE I!' 4 -N OniciNATOs OATE M i XW3 1d L 22_.o enOJEcT Jos NO. 3(3 -0N-A/% O MOC ~ 66 SHEET NO. 7 SUBJECT f L AY 6 2 C. 0 1 I O la3G.96 c.9L E b 16 b2. 49i 40 c, z g. f5 6M' e bo (, t5 47 6.~12. l 5n ~ occ o v 60 S 2.S o \\ b 2. c.+s %u 500 Q 77 ' b is P = 5.~t T... i P -(. l = ( ) AAO.S*0 6D6

~ CALCljLATION SHEET d., C,tc. No. iocc nEv.~o.

  • I O
  • b II~

CHECKED On LA CATE ORIGINATOR DATE PROJECT ~ bAO JOB NO. 96-0461 5's [2/44'Et) 6 of 12-sus;ECT ssegr No. I so' N d'o (,4.Si W t 2- .as. l L g 81 .6 ~3g(s.(iQ 60 90 - 32..oe D o' 'T44'l' /T.fo I hC.W-. l i 141 f s. .p i z.m @ Y _2 4. ,y adl /4 5b 4 ./ l AAO.5:0 $n8 s 1

( CALCULATION SHEET -a CA LC. NO. REV.NO. b OATE CHECKED OL M 'OATE ~ ~~ ORIGINATOR \\ ND PROJEM JOB NO. b "" ! Of I1 SUBJECT SHE ET NO. c.s as* 5,N 3 6 ' l,0 to (o G L s 4.67 ' X -3 8 7L 2.63' g, - i.9 1 ' 1.21' 65 n c21 t. 2.si = b~110 63 L: 2.21 -I 3 I' ' l 2 'I ,, _,_ l 69 m70 L-10 - 0,% 11 ' O,57' 70 n 71 L:10 - o.S 6 ' o 57' af 9..... f 0 / \\ d\\* t / 10 y f.\\ g/ v p \\,x .\\@>*s \\ ('. 4 ~ ( L 36' s V go c l. I w-AAO 520 6/76

I ( . r CALCULATION SHEET d "'j, IDOS REv.NO. l cai.e.n o. 5 ORIGIN ATOR DATE CHECKED / OATE fW i D f A-tJ D I 4 "L. 72-o

es no.

pno;ger 36-OMBd-/9 / % - Od 6v. - FE 10 c1. l'2 - ss EET no. sus;EcT / 4 I a -- p. s ~ i m i Dit o t ( i i 4 E a e e.e.. e ...e N = .N u. p. ..ee .e. .g gum,,, e O T = f ...p. .s ..m...s.- 6mN @ m*6 .a e e. og..e e o epm. ..w. O m e ae. .m p l AAO 520 6/78

y. g g

4 sw n at W C' 4V . jW FULL PROFILE SETTLEMENT GAGE DATA S tr.s f[ TABLE No.- 12 PIPELINE DESIGNATION _26-E30-M & l LOCATION OF REAOCUT POINT rase. e-t '1 se. f e e w e er pu, s...,e..... { ELEVATION OF PIPELINE INVERT AT READOUT POINT AS _ 'M8 BECHTEL POWER CORPCRATION - 625.94 E p N 3> 13 DISTANCE FROM INVERT fi READCUT POINT ELEVATION COMMENTS atsw (ft) q g? 3P.e l (ft) ff INegas 0 C2c.of M t.et All Field Data Collected [Ae 1 (. j 10.0 625.77 7 and. 8,1979 i I ko) 30.0 - 3 12. i 625.49 fl i l -G '43 50.0 625.41 ii l -7'4 4 70.0 E Isn.4s' 622.90 i -l - 4

  • 4 M

90.0 622.89' l [ 110.0 ! ~ 6 '7 2. 623.06 - 4*68 l h '130.0 l 623.12 } -3.Sf. 150.0 623.09 l -4 '3 2. O 170.0 i 623.10 l -4 2. 190.0 623.06 l -4 C7 M 21 0'.0 623.06 l-54 t 230,0 622.72 l-g.'/f j (2.so) 250.0 - l622.57 ~ l - 10 5% i 270.0 . 622.56 (2.9o) 290.0 - t o. Gg 622.58 0 -10 4f i (310 310.0 622.55 - 3 0* E0 330.0 622.60 "'IC ' t o 350.0 l622.64 kb 370.0 622.78 - 9 7 2. 3'0.0 ~ 2'Ok [ 6SU 9 622.87 - G.5% 410.0

622.75 b

430.0 l622.81 ~8'40 i e k b l 451.5 l623.29 -763 - l'N l U l 4 y MIDLAND PLANT-I/ilDLAND MICHIGAN n ei v g Gs.t"11 s S ~*

ee.#m e es Me 64&%e em..h-@6+aD+ 9 emes-m

    • W*

as* = *

  • g a

e e em 6

  • e.-

m e 9 8 '4 / SM k i y t ~=:-I?=G] Cf:irf. 3 -% .a g4 N_ + -. -.. .. _ = I ~--= -3

4 5 n: :. ;..

-Q r - :- * - r T--:

C 4-

-1 ~. .. _ _... f* y . s _T 4m e -n.._.... g --- - / ...p4 ~~ g ? B *A* 2

.s
-- a x

- m 2.&:--. e _ r, g - (;1. $ ~.m N i L- = c .s _ '} -u Z. C --+ = a'x h _-T.. 1 M n +----- i eme r 4 to

--=

v r 6. -f..--..-..._--.---.-.. 3' S i O ~:3 N 4_. 1 --A pi---. z w w 6'D p s em M W ~ .1"C' 7 a I _. W p -j p[ ens g, 1s ~. Os Me z, s he

  • 3 s

U W. ans.g a-_... gp 0 1 m "4 ' P; ^ s Sw ~

== N O' "3 m 3 '. ? L---. " - - -g 2-'s -w, - ~ ~- 3 ,3 -~ "M

-CL,

. _ -. -i* _.Q*_T (m) A V

f. N 'J M M q 44.?.'. 5 Gf 21 f T
  • ME101

.= INPUT CARD IMA GES FUT ED 1 11 21 31 41 51 61 71 + + + + + + + + Eg Itif.EE=TMEM1, 9 RUV LDCASE=WT1 '2 RUN TITLE = MIDLAND SEEY WTE PUY 3 HED TO U C1850_16-CR C-*5, 4 P E 0Jh C=72 2 0,2R C5 NC=100 5, 5 UNITS =2,CCCE=E31S7,3, USER =! 6 ANC 7 -2.5' E=27.9E6,0D=36 0,TFIK=0.3~ 7 FA=0 9,aB=0.9,RC=0.9 6 9 10-3 21 2 25 10 20-8.19 5.73 91 30-8 19 5.74 12 RAD 30 1.0 EISP=-6.48 40-8.19 5.74 J3 14 50-8.19 5.74 15 60-8.19 5.74 15 67-4.62 3.23 17 500-8.1,9 5.7c 18 3AD 500 1.0 DISP =-5.28 19 67 71 1.721 -3.0 2.uS7 L CE=76.0,TRIK=0.375, LES/FT=278.5 20-21 80 5.28 7.54 90 5.74 8.19 2.2 23 EAD 90 1.0 DISP =-6.72 j l 24 100 5.74 8.19 25 110 5.74 8.19 26 120 5.74 8.19 27 130 5.74 8.19 FAD 130 1.0 DISP =-3.96 2.8 29 140 5.74 8.19 30 150 5.74 8.19 39 160 5.7u s.19 32 170 5.74 8.19 33 PAD 170 1.0 DISP =-4.20 34 180 5.74 8.19 35 190 5.74 B.19 36 200 5.74 2.19 210 5.74 8.19 ?? 38 RAD 210 1.0 LISP =-5.4 39 220 5.74 8.19 40 230 5.74 8.19 '41 240 5.74 8.19 42 250 5.74 8.19 43 FAC 250 1.0 CISP=-10.56 44 260 5.74 5.19 uf 270 5.74 8.19 u6 280 5.74 S.19 L7 255 3.09 4.41 L 48 290 5.0 49 FAD 290 1.0 015F=-10 44 __50 300 10.0 51 310 10.0 DISF=-10.8 52 FAC 310 1.0 53 320 10.0 "3 ~ 3 30 10.0

.. _,.. _..... _. = - - = - - + C- } ' l . s grar. C.I.; G C3 340 10.0 350 10 0 360 10.0 ~~ 370 10.0 " iia D 370 1.0 DISP =-8.04 360 10.0 390 10.0 ?AC 390 1.0 DISP =-6.96 400 10.0 410 10.0 420 10.0 428 E.0 L 431-3.25 'fA 3 431 1.0 DISP = -7.68 440-8.75 450-10.0 457-7.5 PA0 457 1.0 ENO DIS P = - 1. 9 2 + + + + + + + + + 73 CAFCS IN INPUT LECK 73 CARDS IN LCAD CASE ThRM1 73 CAPDS IN LCAD CASE '4T1 0 WARNINGS 0 EEECPS 0 FATAL Eh?CRS ?). 'ACH. MG 10C000000000

  • /. E _101. M E 101 I II*

FE101I/ TEE 05 . CHANGED FRCM 35371

  • 0 41371 D ECIMA L

'm CB CS

fic7 SPECIAL STUDIES pf%g i o p 6 ___. M lad.)../IM/I_ I........ PROJECT SHEET _ OF

Os NO...._. Z420 ei Ar2T cEsicN croup

_..__00dRfshfd7'd \\YAr/st.. ArWF SYST Et.1: . 8-167..[4). _ _./QO h..... l'O NO. CALC.NO ..._ R EV NO. 6 A. DESIGN DATA:

8. CRITERIA OBJECTIVES b

lba fkt J Ae/Afl

1. Auss exan SurvA4eihisfachis'

,;,J k o d ,.,, 4,., g,, j, A'M : 10" Sea 4 0 d' uen h/ sef,t%es/ //al'/ : AlMr 12106 sh A 0.J. ,,,,,; lAe us,eywwe,/

2. &,1 g Acx larsaxrar:,n.u krw.

j M r Jici;.n c, 4 0 - 3 6 r 2. 3 (b) asrrumr Cass prs Jaxxsay- ' ' ' *

  • m' '

Sc x y' 15 79

s. au. sicr..d, k.ucrios-de C.

REFERENCES:

e 2.)(1301 Aurs JAClG@suxQl3f'16 @x.F2) s-2 3-79)

3. Ai Al - 7$14 Aorfir Ostrxsxcar Css / fATA - TAs. J3 '79
4. Saxuf.9 A'Nxik/J /s.7/fis :

SK-C-G50 Jed. A $- fAA9 b*s$dd JJ - kArA -0 o M-167' (a) Aad. s O. DESCRIPTION OF ANALYSIS / STUDY PERFORMEO. Shrsissrrax. dirruxxxt frissJn is ,dusiso Asise p 1 z ' 1 0 1 - 4', s ra x L e s a r fe jsAxisis. ,bst,/s : 10- Oh'80.2 7 - kuics %6 rex Ja,wy //sspsA /Iwt A6"- oHAe -ff i% fik,6 ",Pr'afx. frdtJArex, CooxxxJ (14.e J-2CA ) E. CONCLUSIONS: )yjalajo?Y A0 " Y C k$000 /?

  • ;.2$$$0 c

f /a io -, sc-ssex.3 (i) n Ac/ ae E E ACTION f JJAME SIGNAM E f,_ DATE B c^n un ma>u uv y,ayfos Acaysd (foi A iseae.s ) /4 M JJ 6-80 l m eru> n, ggg;gur g,L J y_9.ro unoivi o av A. PA ret _ J.04FL 11-a-80 U 'n '2..^G:',':, ';i,r;; ;', ;"v~ ~~" '"~~ 1

. ~ ~ w pac e 7. op e, i FULL PROFil F SETTI FMENT GAGE DATA

SUMMARY

TABLE No. 6 PIPELIE DESIGNATION 16-27 ...e t ~ NOTE: SEE FIGURE No.I FOR LOCATION OF PIPELINE AND REACOUT PCANT 7 hfA DISTANCE FROM CohedENTS a, READOUT PCINT NVERT ELEWTCN o (Nf (FT.) {FT.} yo') A l ; c / M E d f.? 0 623.27 /.16 ef - i 3 - 79 i u?.83 5 +.w,..,n n.. 20 20 o eo 7 30.0 e23.2s 9.9G" 30 to. 08 " 40 40,o e23,24 50.O 623.29 9.JB" 50 7.44" GO so.o e23.4s 4.86" 70 70.0 623.70 Q.- I Y i MIDLAND, PLANT DIESEL GENERATOR BUILDNG I MIDLAND, MICHIGAN d w (. t 1 i U bh .'uuceam m m m w 1 ' ~ ~ * = - _, -

PMe2oFG l .I 5 6 s 2 .i. . l -1 ? ? 't- 'l f. t l _1 i .g.

.3..--._i__.

p. p 4 l n. . J J;.o. a ..i

3..

[ .l p' -Ai-d -(P 4 i. o- ... ]. tg g .3 __p' z..

... -, y. p..

e _.l. .p o

t$
f-r,.

l: j.:. .f. 1: I le I .' l J., .[::j

h..

{ .;j. ],j:.. i.'j,.l i] .I 7"l.,- :q g. h.:--O " l ~t n;:-- y3

-!r.. ( --!..
, : 4., -

., r. ,-l.

  • l ir'

..}. v .w I -. o. ~ .?- i l - o t -- 7 j g -l g N, .. _3 _ 3 .M.nl . j% a. i_ _*- o o. ":Q Q.... j ' -l-{ r. ..l. j 1s. Q k. 1 l l !

i. l: ' ; '-

l v e I c _..i. 4 l-i L -l-

i::

i L 6 s

i. -l -

ti - !. 'n y ):. l m_ l 1 i I-e . l (..,(. -J,T r l l 1 ?!J +. i:

1..

n l i. m rjy- - l.. l.. "i : - tu li.;4:r!'. .i. . pg y aj.- r -;.i. "i j j ..l.: l

.3..
n..
l. -.

..l.

t.
.:....p:
n..i. n...,a g 4..,

4 -J t.. .t. n r. ..u. .t-n., .t jipp : .. f-f: "i ih -i:};j i.;.].ij:!d. ::.y.

Q 4

-.--..nt:n:

n.;;;

I' l:. '

;j:-

5 }i:fis ile.

/p "- in
i:f;i:..:!ii!lr A

.i:i., i i.: i . ; pt. - l l i' MC !E P TE-l:~.iE!

b-

~4 lli

'il);j" ii -El'F I

ifh h ; nMi ":!! 1 i' 15l@ F!! ii 0 i . ;. :. l' n : r... l.m... l.: :. ::la. n.; =..r:.:.:.:..: g1 ::

..t
:-[u..

^

r. a :.

n.:..: s..

=..

}. g -fi Il5I5l 5iG #1lG ni" ' l Eli nl:iihF i[ IbiN i:b I* N $- Rp!M Y i f hi - i EW'.:j;i! i 1 .:.!n. \\r.. 4:. ji. p

n.s.:..p.: ::. :d...n:W; LIji:.

-@c .r.!. : n.4......:. a.h... !a.. .q;l: !.....l.:... .... : 9l:.:i : .r:

. n ;
. p
  • pij;l

.i:lli-EJ

{ Qi-iii-i
p

i:-ih

N
.:ji i:l i.

Eii i.i-h ] gj.i iil:i ':2!.is i!!! 41:;-ij:;iin.' -i.!:i

+ rai:gi;iti:

qM:i.ej.j;.. 4 :N:q: ,j J M_n ni:0

i 4 91: 1

.:;i:: i" :l :i:F.tiliii.:

  • H iiiii:
ri;i-l
4:iir:#i:

ri.:. I % 1:. N i 5 .=r=. a.,.. :_; L". :.32 ; *.!.. qngibi::_ca4w=.in. : n 2=. ; iii- .i F.:1.=p:yi ~j ni gi j .Q [ "I.~. I b

k..

ii*f -f f..

.iy hE[.
-f.

j

  • * } ;j Nj.. j. fj:jq

,.f, i'i:5 g ,. a j. :.a "n""l... .g. g ...g. i.. [ n i.

p. :.

g:-

1...

..g..

1:

i ~ 0J i .cr: t i. w ..:........1...;*..,...4. ...":.. _ j '. ...... ::.g......... i e ...g... .... l.. l..- . :;n..- .{ . j ;.t.r.. P. 1. t t. c.. e 4 ~ - f ri l-. f. i"

t :

}" lt -y: [ ' ! :~ l :f:- hn!"*-l "i ' 23

1 r

i-] . l m. - - - l I 8: I* -l ..l 3

  • i 2

I . i r.

t. -

/. l y j -l-l'- A.i. I l-i.!- 8l, "-l., .'k'. L,Z , =. !. I s e j 6... 8.. i i ce p.

+i Ja t_ _ _1 n!.:

s; ig n-1;.- p -ya

p I

y f.. {;

l-
-{ -

.c M l'

j L

,..1... .I a. u_:: 1-l I ) 6 T. l .-g t t i W -_j + o r A;4 N._ l l ! 4 + t t t --t J._..,. s v I f

  • e i./

i l v i. I, i ni.. .._4:. :... -]j. j.. \\n...1 [ . /! l i. t u. ...L.. _ :. 4.- 7 - l j. + 41

i
n l \\ j. !

i 4 i-

i. l-
-l

' N. - ~ _:_.J._.__ 6: 5 i

i. _ _.s 4

2. .i _.....;. .M.- i i t .. _j._.. ..... L ...:. s. m_. :. l ! l N i :- i l ( l-t 1 } l r -{ .g; 3 n O o O O-0 . Ce c. Q. ... ;.......f- . :.... c...'p e t g 0,..;.. Y:....e .N

. u,

. a. p. .co g:. i r ,c. i is o p

l e

8. gl :. i i 1 + l ? e j i - g._. i i j t .. l .a._... f f i ~ l f, '!2 l1 ' l f [ o

~~ '~ ~' ~ PAtt + c F r ( CALCULATION SHEET REV.NO. f "./ CALC.NO.

    1. L

'//d V CATE II* s*bO CHECKED DATE ORIGINATOR bO '72 AI/) M1 JC B NO. PROJECT SUBJECT

  1. f s

10"- D M C-2 7 SHEET uO. s1:-4.56"

08. 2. }l-!GT(Oh ked. G O

r SK-C-G5O /e/. A (a N Y 5s k ht/A A's!Alf: JAClG(Qt3 fig ^ 4:o,, s-23-79, t /N x k'a~n, ~ <e,. ~ 12 i %8"2MBC-310 to" CHAC-2'I i 2s"-oHAc.55 (12. cas'-s") l sO (.n.an's") %,,'e {p'st e. o kj y/ c. - e., A,q J +: 30 A' ' 20 2s Comishs : i. Waar J/. p. t to l do u Je n" (z"- one -ss),sn2ygegs?uI:es I J/.p. 42 do ype pyuku ( io", a ryn // Jf./.2.z)I. 15 ~,. don /d.Je" Nwo.ur .2. a (J.tr - ,- J Ar s.aos", s ryn/ jf/ J/. jli.9 7) 55 Jo /c/,de

  • Ws2p-Tir" t

3. s (af=

a. coz = sen

- s s< cm saisu, a '"/" # > '!" [c / AAO.s:o on.

pua s or c ( J CALCULATION SHEET' /006 R ev. uo. ene. uo. I M k V oATE If*b*OO CHECKEo oATE ORIGINATOR ( Jhw410V &,'< i '72 2 o

o. uo.

,,Ros,cr 4*M Al2 1 40"- ONA e -2 7 sneer no. suesecr 10 "-OHAC -2 7 26 "- OHA C - 55' }{alen?sli: ifJM/ - JA-106 AJMJ - JA-1SS' fr. A G. J. 4't. X C - 7 0 0.J. d.9 = 10. 75 " op=26.0" YAEx = 0. 3 s5" fjkx : O. 37s " z = 2 9. 90,*n ' z.= 190. 60 in /s/ra z : 6.3 7 ( 3115 G 5 ; st' - 489 kJ drruwr lrx. A ra m stfr m s ex30 - e 10 101 - 97e> g is'Ne ,/ s s 7 aers e izs - iors V9.wAt4,9,e a in 3 78 s3 - e.u AA - 2 sos s conjules Aar 19297 - Si2H;M/3 - 30,29 /2d"o G.37 \\ 3137 ) 19995 -*- 6 121 [16ars ..It A str= s:2x, (31 ' 7 x 522) }/,,ll,* 4 dif': 1.97 10884 G-55;55f - JJ44i 7 fioeds x1.97) J/y',u,~ A rx m s,3,w r 2i9w,,e (e,ees) a a c,y,,/e. a 4 AAo 5 0 6n6 l

g/ CALCULATION SHEET P"'* G OOb REV.NO. CALC.NO. II*b

  • hO CA INATCA A

u /A A V QATE ~ CHECK!O CATE 2 /I' ' ' * * . 'l.! 4' ?A A O pacatcy JC B NO. S'v 9. ECT ~ s '~'i /JJ l.+'f.

  • d " %*

~~/ ( ** **//J /. **I*" $H E ET NO. o ,..i.,: .-w : a ri a, m..sr,w r. era .s.> cw:w m.m u ,$f,$[ %'s 6'A!/s.~4fo , dd / C//,*/ 5 Y

  • .G 4,1,,,

,l -.A.,, 4A,i. A,, A n e I'.9 - r) + 2 ~,dia,,cl '/pr - - *- (d-t) + 2 t-l- -rdchaien ,di,s 7-x a a.,atd.:,m/,i,/d g-

i. a,

u 5* ('o..s+ r/d), a J. o wA*de& <n g % n f; - 1.0 + 0. os('r-3), o,z j.o a wliu e 26" J'cx. Jr.9 (du,, A;> ) 10 " Si,?. -1o(4s,wl,",'h:) .9= 26" 7': 0.376 s1 = fo. 7S " l = o.3GS ,l = 1 2. 8 1,2 5 " r = 5.1925" r' /A) * = 0. 6 3 7 (A/r) ' = JO. S29 f(r/A)& = 1.0 (l/r) = o. 9 73 = o. 40 5 =

1. s 4 = 'L.o + o.or fr - 3) ~ $ = 1.11 o-4s(A/1)5(t/A)'(!/T)(6)(&) -

,c)a-r'. -.a i, i, = S.2.z = I,, = S.2.1 Ea = 0.17(A/Y) ' + 0.2S (f /7)(T:)(f ) ~ in = 3. 5 - i, = i, = 1.0 i, = 0. 40 ('d/r) */ (5 )(6) !,=:.s7 f

c. so('d/7)' Y'(r/2)(f ) m i;, = 3.79

= u Igy ;.,. D .,. hie) J rF' = 5.22 e 12

  • /g A AO $23 6/76

t- _m_,__

r'.'e -- i? Ill"lf k/:..~n ME101 I N PU I C A E D I M A G E S 1

11 21 31 41 51 61 71 80 + + + + + + + + + F C.': LDCASE=THEM1, EUN LOCASE=WT1 Mr a IITL M ILLAND 10-OhEC-27 EAST VALVE PIT TC TEE, ERCJNC=7220,FECEN0=1006, UNIIE=2,CCDE=E31fT O SEh=5J ANC 1 -9.72 E=27.9E6,CD=10.75,THIK=0.365, FA=0.9,FS=0.9,RC=0.9, L 55 / f T=14. 6 8, TH EE M =0.0 55.0 105.0 il 4 22 L 15 2.75 20 5.0 EAU 20 1.0 LISP =-1.32 25 5.0 28 2.75 L 3C-2.G FAD 20 1.0 DISP =-9.96 35-5.0 40-t.0 45-5.0 50-5.0. RAD to 1.0 LI5F=-9 98 55-5.0 ~ 60-5.0 t 5-5.0 70-f.0 FAC 70 1.0 EISE=-4.55 c.u + + + + + + + + + 30 C7 FPS IN INFUT EECK 30 CARCS IN LCAL CASE THRM1 JG LAEst i n LU A U C A 5 r. ~Tl a 0 WAFNINGS o zer. Lib 0 FATA L EEECRS ?3. C.-ACE.

  • '. I 101. M F 101 I
    • 1I'**

ME101I/EESCS . :. L c: n.~ r., t r. L t.

.eu 2.

- 1.v u c t Li..n t.saLL

=

PIPING ANALYSIS CHECK AND COVER SHEET P44.e 1 0F4 A SPECI AL STUDIES PROJECT: MiotAun SHEET OF JOB NO. 7MO PLANT DESIGN GROUP SYSTEM: SERVict W ATa n Main _Es-tren trva . CALC.NO. E ISC C.tO. M l67 (C) REV NO. E A. DESIGN DATA:

8. CRITERIA / OBJECTIVES:

TO SHOW THAT T/IE hPIPin4 ct AGS Sh rs. STee.sses id SuRiaD PiPiNQ 72.2c M - 4 8t (Q) 52 2.V 15. @ 78 DiFFE.EEMTi A L' St.TTLEW7 T DE MG MuiEEgg97 Pipt **

2. 6 5% " MC M. W41 L ASME SEC.lll BkPVCoDE M ATLt A ST M A 155. 4 l 2 uc,.g.g [g gg (s ogij (1977)

NC' 7 0

  • I. M CL f. 3 Se,

3. SetL 4 f204 INSTQuMENTATICM. C.

REFERENCES:

Futt Fee rtL g GETT LE MENT hASME SEc $, 50e>SECTIC4 NC C-AGE CATA - IJANU AR. 79 1977 J.) ME lot Ruu

  • M sesion F2.

b) s 4 R I Fot.t.54um Q 37 M 52 D PROF LE i, SET 7LK.MCAT G AGE DATA Fits s D-nao.e DT ilnh 9 M SK.c-475 sun $e.sr.D PipEuwe s) w eo e m % Pi.4 ~ s 'P a

  • m i. u -

Ant A.c Mis.7A) Rsv 5. s ~.. D. DESCRIPTION OF ANALYSIS / STUDY PERFORMED: LINE AR C LASTl0 AMA{,,N SI S To DETE.R MINE OtFFE.R em ) AL S ETT LE.M t.ut % Tresses tu FW e.iec Pt9t NS. 2.d>"- IJ ISD -2 SE.R9 tc8 W 47E R., EggM LiW C. E. CONCLUSIONS: [Mg T b,p,go

~3~

$10 6 ) ASc: f ] {c o p,c{. Ed(104)or Mc. 36 5 2. 3 (b) is MET .[. M - 1'* 5 6 ACTION NAME l / SIGNATURE DATE l

s. o yy, y ( % x. s,wi)

A ttey> 11-7 Ce cAtcutAriosav Z cascxsosy C. 8A S Av4 RA N -Ge >wW' kW 11 - 8 4 APPROVED sv d, pkypt ,7,g M _ Il-$-Ie .m,

il QML 2 CF 4 CALCULATION SHEET E CALC.NO. REV.NO. ORIGINATCR

  • DATE CHECKED ATE

(' Mb d M3 - W M - 0 0 /. ,po;ge7 jes uo, M ** /IO -2 / sus;ECT SHEET NO. &p wce in-2 M hh/. EffuR.d L ing n )y -DlG. /b l.b $. fJ M 7~-/. YuRB. A L.D G, . N 5-Fo b3 '_08 \\ $ - 164 o ^ L \\ g \\ N

  1. E4 car om

~- , #$.2pr 30 @/A/ 7~- Y ?2

  • iN I

N 5 h C. - 4 / e4 s. \\O' $\\ DS/9N ffEss$-//0 yis p up.-/M *F i s "em ' Mar! - 8s TM -A -Irr cL q'. Le 70 d*373 kHl., hM) i AAO.520 6DS

p,we 2 or 4 j ULL PROFILE SETTLE.iENT GAGE DKfA SUMMA PIPELINE DESIGNAT!ON _26-1.Tm-2 1 TABLE No._ MOTE: GEE FIGURZ No.I FOR LCCATION OF PI 4 t).-45

  • i, b1N D '

CO ?.7.lENTS DISTAt!CE FROM '4 VERT ELEVATION READCUT POINT y (FT.) (FT.) py g,,, 0*Y JAL 0 623.04 0'dE'

1. SM 10.0 623.07
    • 3'*

L 44 / 20.0 623.12 0 41/ 3,7 > m3 1a 30.O I' 37s 0*b min a 40 0 oH/ s.'f L 50.0 623.14 59,25 623.13 0 3L / '3 6 4 # e i i \\ s i 1 e 2 DIESEL GENERATOR DUILD:NG e ~ MIDLAND PLANT-I MIDLAND, MICHIGAN d EEAD.c UT Peini IS O n RT.D uca t 47 37,5, c n I(O kdbN U O' nit'c>Wot umWNTATION CNCI'NCCTU n

PMe 4 cP 4-y..-.g;._ ._...._-.7._... .-s.-_.g_7__. b-*-.:g ; _ _ __ -b -: _ _ -.. l ; **-* !... .f N. = ?.;1* _ * ... - - =. - " N=._._.____.__..________.3____ _=.;_,._-.2-"-*.-C".2="'*..-- = _.._______e_.. 3-l -~=u2------- _;I u- ~ ue.;. L _=- y,._.._=._ _,N- :. ?- M. . _. +.,. h iti r=r-i.%. _,_ ._.=-;.C h y y =_ 1. _ _. d :-- _- --4 -- -+- 4 --- =_- y_ a== -t=-: --+-_ .l. = -. = = _ - ~ a.a..

__-er_ :

3_=_; k. _w___-- 1 m "_M =k:... w-- q---" ' - .___..;=:--- c.::=-d 3 3 _c.._ '_. d._ -.D _= C J

  • 2- ~~- ~

-=--=.o __I I-O :* T : ___ 4 _a ._._g--- .=.=.;= 4 - 2 :. = .. p - 4.; y _.____~_:.__.. ( ~ _ - -

==. = :m :.... _ = N. _ __. ~ .= a.._.._. _---2--;= ...._._...__m g -' f.w _=1 4 ;_M@4

=_0== F.;"- t-

---*~.=U-~ --. C= 2.s- - ' ' * - ' ' - - ~ ' ' ..= -- ; L; --... s --===---i - - "-.t=: . i _===e in._ -+ %. - u 1. ~ ~~ 9.5,:.fo_ _ ' ^ ~.

  • -- - r--~ }

W L_ = - =r5 t _ -...p g. - _ _ _ g _-_C=_. d.. . = _... T__.-_- . :t ,.-_,w_ 5._ =! --+ .._,, 4- __.,.-.]. _= r.=;._ _ '

... - --v=

=. - - - -

=.

=::=. ~- = =. :

M.y __ _=_.. M.!

=== u =---'--:-

.='

._m -. - -- - - {C".--".{1 -- - - 4.y: W= - - -.:_. u -.. _.. - _ _ _. __ --- u - = :. - :.r__j=;; r - y- : =q_=-~ ,M* ^ --=..r- = 4. N L,._l ., - - _. -._. __. _.... _,.".Z!.r' -~~*. e=e tD ..--.a 9 ~.__s_.--- . - -. _ _ _...-...l;1_

w... +

.____..._4_..__... _ 2Y.. _. - _ ._C ,___._.~s~-,"*,~... ~~~t7 = : ' A:L - ^ _t b.: t b----.. ! * -* I ~ _.. Y,.. .,.. ~..,. - -* -- I~ : ~ r*=. - - - - + - *,. t=. t. _ _ _,, - * =---*.t-.;-' l-r:?-* ~~~ . _.. _. _., i 22-----"-'"*-.;=;-. - ~ =--**: ,;.g

  • 4.---

4 c. ....f-*."? g *

N r

6_

  • - - ~

_N-1-*--*h.==*J;; Im. _ . r,4 :-4'==3=.!E--- -- w_ __.. -. _. . - - = " ' ' .._; N. ,h.._._.-.'_....'~.}.....Z.;=--;=--.- "- -' k. ::im=n.=.D._-.. _. b...... ; =-- t ---! ..._.t---- - =

n;

= -:: _ :r -

.1.N =:- ; = t :;- -
1. u.:=. r r -- - " - ".

t=:.= =.r n..: =::.;_ ;n ; .:g;; - '

r.p T.;
1= =a; n r - -

+ _;=r--.=~-=-- __=t_--=..'.._.2== .=u.=1="-._-t--.-_.!--r--=== =- ::- - ~= n2 =_ n. .:t c..., :: 3 g:.=s r:c; +-=.:. - - '.._.. :.:.:::.== p=n. Eve.n: tg:r_r. ::_; :;.g. .=:;=~--


_6 r-*=. *

' -.. _ =... _ =..nt.; s.:4.- ::-.n=;=

==.:----- r:2 9 W t:-- -.T==--- . :r-._.. : =-- : nm - - -r. : - - c = =d;==i ~ Q"W-.

-_- m=._"..'%

3 _t-4.. ..g -.,;..,_h_=: =tn ", , % = _ : : _. ; - _. _ _,..._. n " .r. g

t=___..----"-r---

5:= . _ _. - ___._%._.w==.._ _._.. _... ;.::.n.: r = yI ..._=: r- - t-- - j.:n_:=-----*- _.i_.. -t .I -rn- ;fc~%; _... =:.: g.-- _- }+ :..." 3 .=:--. ..r au- - :..==

=.

= :-. >8 t r ._=_..g.._._,__._ y, =- -. _, -_.. ! ;__... L.. _=_ : _... =,2 . _. _ =. _ = _

  • I 3

t__J--.- _. _ _+

  • 6 n._
- n a

sp E-, 7;=s.- r. q. g . _ - - - u. -.a--. 1_ __ _.z_.._ _ _-. y==_._-t =.- t = u.. >j g-n _ ~ -.;.;..,, g y W *- 0 -~;P .-.-* 7" J --(T gg - - g ; g _g-go ~. _.s-._-_.-- .Z- :7.- 22't={-- 4_ = * - - D_ g. __.. J"~Z.l=:-{.C. ....--!--t. g 6 _._ g p.=y__.7 =- a -r---- _ _ _.._32g-=4.____. ,q i .a J----

4. _2
4 = F ?)t

=, =2 ,._ _. - ;;.g=_gg j _.E=____""=_=.._=+-._ D'_*"*-**"--**I q g + 94_ --s -Q 'u-_ -4 ~ ~ ;;;;,- -.: - i ~P-- -*f-t _ u:._:: n==t =. -..c = :-l:;-- ;-.;-. l %= :.._.. 13 ---t- ---- =1 ---"----=t===

-^. u.)
=:.= j Q., : =b=_ =t

+--- - q =ui -- - :===- m-. = =.. 7: .+. ---'- _.r.= ;;-' := - :. :; = : f....=_r.._= _.,r= 3 _ a. =- t. =n - - -. = t.--.: ===.-. -- -

r...=_.y.. : =_. ;J :._=_=..=: -,;. _ _ ;=. _===a __.

.. g.,___. _.4 _ z,g _ _ _._ __ _.t. _.u.;_-. _2,=_ s. u _=.. .=c...=. =_ }. ;_.u.. ;.. -c - =- ::; = .,_.m,. ._,__g.g.. 3;;;. ._.-_-w=--=:=.....=.====J =, =_,.,: - -,.;b. 3 r_ = =:=. v

=:===..

~@N~_2Y2.' D1:NiN.NM. NhIN.+2 *M..._. _"_.=DCT2 ~ NN sin:E-1 i;-Y-d- ,._=_; _p_ ___.__l_2.= _ m.,,_ ;__ _... .,.....c..__. r _=_,.......t..;..,,c,. 3 (ll > l l / G7 I I l

-- - - E- ~ ~..- x -_ =..-. - = - - $rjun yL C 37m 5 C.l:: ME101 I N PU T CA R D I MAG ES 1 11 21 31 41 51 61 71 8 + + + + + + + +

      • M-167 REV-6 AND SK-C-650 HED TITLE = MIDLAND 26-1JBD-2, PECEN0=2 PROJNDE 7220, 0

- UNITS =2, USER =KVS,CCDE=SC374, RUN LDC AS E=THRM 1 LDCAS QiiT1 / EUN j ANC 5 -4.92 E=27.9E6,0D=26,IMIC=.375, j LBS/FT=320.1, THERM =0fRA=.999 R E=. 9 9 9,~ R C =. 9 9 9,' 10 -10 20 -10 RAD 20 1. DISF=-3.96 30 -10 40 -10 RAD 40 1. DISP =-3.72 50 -10 60 3 BAD 60 1. DISP =-3.84 END + + + + + + + + ~ 19 CARES IN INFUT CECK 19 CARCS IN LOAD C ASE THEM1 19 CARDS Id LOAD CASE WT1 0 WARNINGS 0 ERRCES 0 FATAL ERRORS 'L 93. $~C E A C H. .M

  • M E 101. M E 101I
101I*** ME101I/FEB05
CRE CHANCED FROM 35400 TO 41400 DECIMA L WORDS i

1

(IIf,7 SPECI AL STUDIES PROJECT _ I) b4 - V MIT b SHEET l _ OF O JOB NO..7.2.29 W A M _ _L I w E, Pe ArJT DESIGN GROUP SYST E *.1. _N9f.8D.m SHOg _..h -. ! 6 3 (,0 ) _ ... REV NO. 3 CALC.NO. . I CD j ISO NO. A. DESIGN DATA-

8. CRITE RI A/O UJECTIVE S

~N MEf 5C O ANW NT PIPP Mg C_ LASS S HTS. "7 2 2.0- M-h N IN BU R,10 PIPINT ME To l RsV.15 W F F G'34NN L -STITTLE wet' pi p g. 2 o" m. % t i_ MATL *. 4 - 3 95 TAs 30Y C L e '2 O R-- y c, 3 c g z,3 (j,,,j A - 3 12. rP. S o Ll.. Asr4g See, gig

  • (Id 2.

3 011 k R O C l<- 2~ N S T72-U6 TA T ' d /V FULL ~P R o rel L E S ETT L E 6 T' 63S,.e GA{c hA - ME I L IMS C. R EF E RENCES: 1,) As tn e S EC.. lll, Sv rasec.T-s o N kJ C, I $l7

1) M E(vgp3g 8R)U AJ. S N u m : Q 101 2T-G-I S-7S 3)SdRI f:LU L L P R ef:. s L G SGTTLGrwrur GAqe M "8'G: D-12. 2 - g.

'NT". 4 l L 4 l '7.9

4) S k - c - Ga s' - s v tt.vey en pipe UNE P R.o t= 1 LE1,
5) YAR.3 'P IPING P L A ha - A st.e A C M-lG'7(80 D. DESCRIPTION OF ANALYSIS / STUDY PERFORMED:

3 ic:r:gg.e-M T1At

5.,, te uwr Sre c s,z cs ia

~3 V R I e.D Pl P/t % M E loI - L I N GIA '*, GLASTIc. A N A t.y.51.5

2. o '#- 1 H C D - I G, S C~ o N2)ENSA M M V $ IT I L L ib%

i 4'~-.o N '>c'N.15 A 6 w 5 rc RA 4 E TAed K, E. CONCLUSIONS; (ct),1-( "> = z.s, eas p c 3 Sc = s oA.oo >sc "2 N c - Sc 57_.3 Ur) 85' met. O t. e 6i (loa). op IN - c ugt.x,, Rgv a ry 17 WAS RUND NAT Ob w C% LIER (67L'ERCQ j w A3 Wo ft.T ED E ACTION NAME SIGNATURE DATE k CAL COL Afif 8N MY (. MVAMD (POR $.MMhNMMW ll-T-M I c.nt u:t u n.

s. % g jg[g' jf,9, g -

^8'8<ov r o a y A.PATEL. M Pel.4 I i 9 o m:..^;w;n=.,r; ~--

( 0 CALCULATION SHEET d" 100 1 e n C.NO. REv.NO. 7' !I' 7 I 7 b' DATE OATE CHECKED ORIGINATOR O PROJECT JOB NO. $U5 JECT O "" ND I SHEET NO. ,Y =. y.. EL (.tl. 2.0 G3 M 3 )4o ( ~ e ,Y JIF ' g. .' A*h M Ei (, 24.1c I.... W Ol%. g.40* ___k I 3 4, " ._ E l-c= t 2.o, 3.. 9. e um 20 e.e - I6 6LL l"lIL 3:3 m II:5.._ S.Q.._W s 3 0. 0 6 _ __ _.._ _ l k AAO.520 6n8

( l t v 1 CALCULATION SHEET d' 100l CALC.NO. REV.NO. 37 6-6-79 I 7' h' ) oars caecKED DATE oniciNaroR g. l D l-jog NO. 9ROJECT 2 o - / Nc b - / 6,9 2 d-3 ssesT No. susJacT _. A 1 h I X Talh* e6 35# f i (" okosas Ars SroRna e TAA)<. p i CoM OEMS AT12. 'r STORR G E -rF-M 4 ew a as... i ~ fid c a i _,-s Et f,"2 d.10, I g0 e ( I AAO.520 6D6

( CALCULATION SHEET $OOi / CALC.NO. REV.NO. j 7 ##~7 9 7*h*99 ORIGINATOR DATE CHECKED DATE ( PROJECT JOB NO. O D ~ /d SU8 JECT ~ SHEET NO. Y 0 . 3 5 2 4 r. 3 s. s 4 5 cis / E ?- T7 3 L / fo8.c o .23. s 2275 L. = 3 3. 3 5 ' 5 t; 23'7 7 (. / 9 L 7 2. 'Z.S 65.51 ro C 408 00 21106 16'1.co h i59 d) ro 5 -( 5o 33-o8 \\5 nz.15. 139.l7 Dh L E R GT14 __. _... _.. 3 3 3 6 -r-G 5 5 i + 'T1.c o + IM. q

  • 429.o3

( AAO.520 6/76

i CALCULATION SHEET IOO! REV.NO. CALC,NO. ~ !~ ORIGINATOR DATE CHECKED M ~ !E ' DATE PROJECT 7A JCB HO. b O SU8 JECT O ~ SHEET NO. 'C) E.$ 16 O Ro O / 3 5 *F Avsrsa me srss e. W ~ Md Y /0

  • pst TQ,gg = /.90T0 yo G

~2-7.7 x io '. psi = m @v.s27.>}'# E, s e = i n -, e 6 , 2 i. 7 vo - p T(.o sr... > -7o ( i I t k, I i AAO 520 6/76

(gPg CALCULATION SHEET Q"/ IOo REV.NO. l CALC.NO.

  • EI' ORIGIN ATOR DATE CHECKED I

OATE ( e. M I D L* D 7 2 2-O PROJECT JOS NO. ~ SUBJECT SHEET NO. b S P c a ce e s su7-1.o 4Dmcr brSn+wCE ht<PL M 2 M G u i- /U n-Apart I.0,79 Aspic. 8,79 _ __... o o.24" o.24" i 20 3.24 9.17. * ~ to 4o 2.86

2,64 4o 1.77.

/. 66. _ 7 o _ ___.. Bo 2.26 2.c4 /oo 3.24 3.o0 /2.o 2.i6 /2o rs o ._. / N -99 ~~~ _ /51.5 39L 3 9(. I8o I.20 0 9L l 7.00 - o.% -f.26 (__. .2,o Rzo 0 34- -/03 2.4 o O.OL - 0.24 i RGo 0.3G

0. 3L 2.so

/.7o /.G8 __. Jao /.R /- 9 2... 22.o -/.68 -3. Z(- 340 -I.20 M 4-n 3 r.o o,S4 '/. 0% So, _ _,,,,, / D,, _. /.h 400 0 2 4-6.24 42o -2.x -7.44 i r r ..e__. s y P r 1 ( AAO.520 6/76

CALCULATION SHEET / OOi REV.NO. CALC.NO. I 7 N Y DATE' ORIGINATOR v CHECKED .DATE ( r I 50 9ROJECT JOB NO. SUBJECT O I NO D" I N SHEET NO. Conce us a,g_ 5 ro e c.<,g, n y s 4 - ,f p Toca,~s h oc-yN F X e ju Wp,o I jg l6'10 139,f7 Hc o eLoss. /So Psi Soo *C 4%m A3Gb G t 3 0 4-CLZ. t... Sco = sve w na ru c. AUSTSN tric. S.Srsst. b 65/6 o 35 Pst 136 'F- ~Y E' s g'.. 'I._..._. I v ...Er Ltd Io @g u.u f t., 5 S' 39 3f. 6 e2.6 l S.% Et bl l. ZD 116 A, w i.- g g .e. 1 l S.w su n.s I ft?I AAO.5:0 6n6 C *C4 N c- 'M T o I l

' 9 Suivavu.n. FULL PRC'!LE SETTLEMENT GAGE DKt N' % k O 34 i 5' PIPELINE DES:GHATIOMJa "" "o w eer Pues structure E2*c ant Se M ee TABLE tio._ LOCATIO*1 CF REA00UT POINT T AS SURVEYED BY ELEVATION OF P!PELINE INVERT AT READCUT PO BECHTEL POWER CORP 03ATION _624.68 1 I ss,,a- l 360.0

  • 'i :

} 624.10 l - 0 *

  • 14 M

380.0 J I 624.18 endde$ste 400.0 I Dierg. nee to eibee at h l 624.43 tu < - O 420.0 t m -e e s.. <. Q: f as mescured by hose grndustions. l Mj' -} 5 n I \\ 4 !(a : MIDLAND PLANT-hilDLAND MICMlGAN Vu -'E E m .g n fi u _ >so. im.m~ mms m.,~m J ~. N l om,,.. e.a.s.

    • '7 5f 7 d C 4 a

5

3 nl ,__.:t===.--- ~: : = 1:. __ :.- ' $ Y= = =:=:=. m' ~= :r===.L =:=.=:== e - _ r:.:.. ~ -*--ti:-*=.t=-:-'^=--.:--_.._. -~_~=._-_:-.-

==-t- =T-- = _:.: = l =_...- -. : t = n . w. ...-*-*_.._._r.:...__.4.__:.._ __I_._....._~!--*-~~-1"*-. .._a_ n. -f

=== c-- - r.-1 === r.. __., __p..__ . _.. _ - _ _ _. _.. = -. ~.. ',M__ - - - - - =. - - - u., _._ =&=t __2 _._.:=-.. i ( = u t = =_ =,: _= r.__.. _ q_=. =_-.a = =:... . = _.. . = = _._u,.s = - c--


t.---

- +- =t r_ ;:. --.- = ----:-=.-. a.,

==q== : --_:-- _=.__._-.==__q_3*.------ 24=.e.- 3-

== w. M. = s -- - - -.,-, ._._.-_:= ~ __..====m -'--===t==-

==...=- 12::- ~ +


m_

=M.b-.1.'=__.1hJ'.i_=="._z______._____.---_.a2----: = + . = " *.* m :=. . =. = ~ ~ ~. _pd.~ = :* **- $.. *%=d'* t- , g J-- j 41".. _. -a. - ~ *:.~-'m .- j..._. _ _ _ ..;_wh I-O ..== _$. p..w= - = - 3 __--: _u ; :===__"=:.-

  • h' "" * :'d ~. :
".4
.g.""*~---."I'."~*.*"'.*""""'
.

. - -. ~ ~ ~ * '- - - _ - - - - - - - - -. -. - - - - - " =1.3..- =_ ;: It _ _ - - =. - -- % ag= ;--- ._...._.._.._..._.Y+=----==.;=:---.==== v -- - 4 v. ;g;;;;.;. -...- -.= _- _ g .y %yg _- _ _--, g....__ _ _...- _.... ..;_u_..--_ .a y . 1 u.J -- -t.=n =~.-e _.._. y __._. - ~ r 2 %_. _===._ r#. -;:=.t== -- * --~ --- --"M...g.....,, =n. m,=.-.=- - - - -... = - .S_=-2 =-w =. ---a =- 4_.. _.. = w. ~= s _g.Q g=.w :_===== a: =---- . i.:=, p=;-=i42 --- - .., a,. __. 4; 1-. _.g__- ... a p=- *- _. y - ---. u ; _,. _._. -- -l : : . - 10: = =---T =... L..,7 * - _.,,,.C --__:=-... ._.__P -.. -. =._ D - EE=KH+gin._ __=_".=."Zv=G=+ T= =E EE* " ~ G~~-t= T -~~~-^-~ ZA. W=a= = m G N.+.M===vL%;-;;;i=E=E=-==smiEE=19==t:"===~L

= ~~~ ~ ~ l

= e. n__ - ;=.=_ -m...m~ --:=, =.:=.: 4 - ,===2_==__._

__73q5,

--,t : S t.. _. _ _r Lo e .w*----- : ~4.__ u_ J.._ - :-.r_.. .;;;_;_._....r-------------*----------4-----+--- . %--.- - - + - - - - - - = .... n - =: _ =r_. _. _. _ _. _ _ '. _.-- -.3 =- ..._.._...__._.. _ _.._ =__ =-m =- -. _ Q... _ _2-*.=~1=~.- _. _..._ =. _ = _ _... .._......u__.-..._.s _._s. ._._r_ ._._.._.y...., .... = =. =. .._-_.-i-_Z._.._.-.=_ n=. q r ._f2= M, =, - m .y

t=

- - - -.=-,n f.r- _.. 4 n-- - a'#. = 4 .... ;. _ -. _. _ ~ ~ ~ '... _. ---h - k. .___.ct=*.__...-t:__. . ~. . -.d'" _.:= : _a ._:= = = = = - 1 t a_ ___ _=

==f_'. + =a= : v - -- r =-.=:.L= =:==r.----~ =:- =~ 2.== a-. s., = +-- __._-...-u== o

=== r===:- 2 :== = :==- ___a ~r 2.u=: -- .___,____.23-===- _6__.2 .4 6. _... M.: ! .1"'* _ e --_=;=._._.__--- __. _.. _.. di- - -3._.-.-._, = - - - - + - - - - - - - - - - + i..== ..=: r. = . _ = = = (.

-

., _j=... _ .= - r - -- =2 = Q . - = -. _ _.. _, _ -.. _. _ _ ._r.-=.-:------ 4_..._ --.:- g ._:= = a_.:-..::.4 :..: ::.. :. u==r.=:a3_=:=:. rm -.u__: = ;.;= t=::=_ q...:;=;.=.r:_9. =.= r.= g:==:=2 ;;.= - -- = = r.=: = r.== - 'J --==.-- =- - : :-----tt== re== _. -: a M :. - -==. ;2 - - =. =:-. _ _.. _. = = - - =. b --"5"~hD"H h-I:---55=lii=NhNf=4=?t3: #!=55:EEEii-f55f-$E--MEE=is riiF=ii=.F - l

._;. _
ga.r ii se.cEm= +eism:ss%w==._;== u===i== =a=. i=_asm=== = 45.ggg o

2 m - Q,c:._ .__n 1 _..- =- - - _ _ _ Fr==. - -.---_-i . : -- - a==

-~. =EL-_----- - -- t.__.. _.2 _:

=t _.. u.=_;2== =.

== :r-r ----t_- e: ... - _. =. _. = __=__. m w g p, _;.;.;._._...-..n_._s. ..7._... ___._t.,_.-t,_=...g. _.2 ..._4_._;.__._,. n .. _._1.._.

= ---4. $ _.=_.. _._...4. _ __j_..r___gy 3___.._..__

2: .. _..- _. = - - ._-- j . _. _ L g _ ___ _=p._. _.,_,

-4.

_j.. q p __._-t=..__:---+------+--y.,_.=.___., _m.__ .___g._ ..,3 .k. e g:_ _ 4- .t r, .. =--_ 4, =_=_=.E :. :.. O =.O.. E=. -i_El. = =:Wg_== =.__ t _.._., - + . ;_..i...=.. r_=;.d.j i_;=a=.j-- ;.If-. Q..-~.j _m u q _ _. 37 g l.___....

=:: p...rd-. _._ _.,n

t _ =


+--22----

--+----4---t_....___,._..__,___,_...;.ly_- n.,, m " :._:r - ....g,, ._.._,_Q.._j.._g._=.._==..._. - -- t =i ;.- , pp _.._._...4_._ . 3._, 4 =_=. _= = p r t.: =_:= : _._. ~ ___,_.:g..--+ __ _=_.:2 --- =. {

j. - - _..

_ :.a. 24 g' m._._. _._ =d:=;u._,.= __. _... _ _. - - - - - * -L. .=-:=- =.. - - -. , _. - - _ _==: r._ _ ;, _ =_ s--"-- m=---+---- = =.y ; _ _== ===:__.. _. t _ _. g d

===. - -,. _.. .= -Q>.... - - t j_ _;. _a_.g___ y __y_ g=== =. .g. g 3 -.- g-a .e .41__._-'-'--+ L.__ i: s J. -. i.g =u= _ _..._. _..__ .-n.

r.. ) -"A. w

- : T__*.- N :r__ - =- . _.. g%.._ __...._ _ _.. _ _ " "___._..-__._..da.";*=.- w"@., __.-r-j

= :_ r m

--*--~!SC.._.__..--='.== ;.--.. f i .___.____,__m_ s ...u. ad-__- __ x l r w. ___... t r- =x; v, _. -=_4, =_ _I, ~. m m - __ ' h _.y J.- -*~'--,-t-- :-q:[q at ~ ~ :t==.__.4 :=. _4 ~ __M K.=L- "= =t=- =' V: :_

_-_.-._= = t== :==&

4 .3==.-1===2 =2._-%g- =-II. %u. p:. " =' :...."r1 - 8 '- 4 . r. i-;.=:-- .r; 2 ;._=.. _ _. _. = - - + - * - ~ - ' - * -- - ;-. m 4 _ _ _ _. - -- -- =p_=.-

  • _m. 1 :-.=zr - __ -

.;g --.=~..'.*.=._^r_:=*.**! - --- :._fs j... = - 1 = T.T t=: = 3 = = 7

===n=..a;.=--------- t--+ ._ __ - : d i_.:= w q ="=-* : :t - " * - .:. = = r =.:. = r = =.. - -+ ---! --* r ".-i n --- ": f ;* P. -

  • f ".. r = f =t * -.* ;
  • __;_..F--

L -' 7 F. --* --d *- - : ~ - - - 'A..:= . 1: 7 O _ :;. 4 ;=.. 1"'

  • ~.!. - - - ~ -'

"- - - 1 J..: A - ===: _.=. - 4 =. 4:s_. _ _: Q -- -C3 J::.;; J.:.: ( W -=---.i. =.Sa _ - 1 -__.w.._-3..__:* g. _l. ? =. _ _ _. s- ... 4 _- --: t = :: y:.== g. _ - =.7===; . --- -'~

== ~ _W ~ ~ - *" "- l'. l _ *- 4 r ;.* { - ~ -- 't=- , - - :: - ---t :=:- 1 = = : - r -_: _ g. 4

...- =

.. ::.. t ~ t

  • !st VM # G rc a: t, Sj'l3l~=

ME101 IN PUT CAF D IM A G ES 1 11 21 31 41 51 61 71 80 + + + + + + + + ,? LDCASE=THR51, RUN LDCASE=WT1, FUN TITLE = MIDLAND 1 TUEEINE ELDG HED TO COND STG LINE 2C-1HCD-169/ PROJN0=7220,PROEN0=10074 UNITS =2,CCDE=331573, USEE =SJ2771 E=28.3E6,0D=20.00,THIC=0.375, ANC 1 RA=0.9~RE=0.9,RC=0.9, LES/FT=204.27,THE57.=0 0 24-0 L 3 0-8.84 8.84 41-0.16 G.16 51-0.16 0.16 6 0-8.84 8.84 L 102-6.0 2010-0 /. FAD 20 1. DISP =-3.24 3010-0 4010-0 5010-0 j 6010-0 5AD 60 1. DISP =-1.92 7010-0 8010-0 9010-0 / 10010-0 RAD 100 1. DISP'=-3 24J 11010-0 12010-0 f EAD 120 1. DISP =-2.16 / 13010-0 1399-0 L 140 1-9 21 9 21 142 1-2.84 2.84 S 150 0 160 0 'EAD 160 1. DISP =-3.96 t 170 0 180 .0-0 190 0 200 0 / EAD 200 1. DISP =0 96 V 210 0 220 0 / EAD 220 1. DISP =0 84V 230 0 240 0 250 0 260 0 270 0 280 0 / RAD 260 1. DISP =-1.6' 290 0

~ ~ c a: 9: 5 fi:F % ~ ..n, ,s. -55 300 . 0 / 56 RAD 300 1. DISP =-1.56 57 310 . 0 58 320 . 0 59 RAD 320 1. DISP = 1.68 / 60 323 6.0 61 326 . 6.0 L 62 329 2-6.0 63 330 0-6.0 54 3,4010-0 65 35010-0 66 36010-0 / 57 KAD 360 1. LISP =-0.84 ' 58 37010-0 69 38010-0 7C RAD 380 1. / DISP =-1.2 # 71 39010-0 A 72 391 0-11.5 73 3921-0.5 L 74 393 0-8.84 8.84 + 75 4004-11.03 11 03 76 4107-0.84 7-0.84 77 4207-0.84 7-0.84 78 RAD 420 1. DISP =2.76 </ 79-. /4221-0.73 . 0.73 - 30 ,4151-9.21 9.21 L 31 ,428 5-0 52 { N35 435 5-0 23 ANC 2.76 24 END-R A=0 9, RE =0.9,R C= 0.9 - + + + + + + + + 84 CAPDS IN IMPUT DECK 84 CARDS IN LOAD CASE THRM1 84 CARDS IN LCAD CASE WT1 0 WARNINGS 0 EPECFS O FATAL EERCRS

,PL 03.

E SCEACH.

ARNING 100000000000

,KR

  • M E 101. M E 1011 ME101I*** ME101I/ FEE 05 CCRE CHANCED kEOM 35371 TO 41371 DECIMA L '4CR ES S..

~ w --~

' fil!,7, SPECI AL STUDIES PROJECT./N/blAf/b_.-UfitT kl,/E. .SH E CT . OF JOB NO . 7 228_._.. P t **. JT DESIGN GROUP SYST E:.L f.f.RifJCE._. WAT_E$ CALC.NO. 1 7 2. IEO NO. ///-/d f ...... REV NO. A. DESIGN DATA B. CRIT E RI A 'O BJE CTIV E S To Silow rdAr TWE STCESSES

1) pipwG cuss stl Ears. 7220-111-471 (g)

/u sugieo hbsis Dus To 2av, is bli~MENut-3aTr&9nEnr H T ME E /s2n26MikT3. P!PE : 2W' srb. wM,. 3V stb. VMLL. mArel : Asms SA-iss ct.ss 2, go. gg-yo AS/7]E sseTica g,a.34a.3(s)

2) Solt- + tock

.nsrRumeyraricy 5 84-S 3' Sc. Full t% FILE SarTI.Eh:syr $1'bE OATA - APRIL l929 C

REFERENCES:

I) ASmE SEC..zt, Su8sEency ye 2)6*** F-2/4-w19 Wa g/9/79 /72 lo/ RUN'.wutil'$ G23P53

3) s nz fvu. ge,pu.a sa7,iges GAGE tATA FLE # b.2220-R UTEo: 4/2fff).

1)BeC//751 t.// win

  • SK-d-675.

SWAVE YEb P!!El./46 floFILSS. 5)dEC//TEl BAAW/ACS * /fi-/69,jf-4id /fl-/b$, /fl-I?3.3//-2 REV. S., e-ti / D. DESCRIPTION OF ANALYSIS / STUDY PERFORMED. DIFFERENTIAL SETTLEMEAir STRESSES /A/ BuKIEb PiPIN(r 17/E tot Ln/EAA Et.ASTIC i4M9L}/5/5 sq2e -. oygc-m

suvu wara sano um mm 2surca M-

+ /uL &Db. TRAIN A To VALVE 21. E. CONCLUSIONS: I5246 gj 3 S = S2,500 pa. Ax = = e 7@ u. EQ. (loa.) of Ne-34s2.3 (b).is nor Exisena. ok n h ACTION NAME SIGNATURE DATE B c^wn nnw ur E.;;* mARuT/% k.V. D/AmY) G.E /71.42urff-<h M. V Sr/Ami'5' ll-6N70 I <...i co n e

s. x Ah h,,. i n - 7. Po

^m ovr o uv _A. PA ra M/M 11-2 -8 0 __ p g g' \\

CALCULATION SHEET CALC.NO. REV.NO. i (./. ."*a./p3O lf. / CalGINATOR DATg CHECKEO lIIllW OATE U* ' /. b !_ / rs . A PROJECT i s s h. o. e ^! soe No. p f, -!***/.~* -l[,. l / '/ 9.b l SHEET NO.

;pitjt, f];- 31! [El-CZg t/.5 AOG

2d-OHt3C If. .a m .i ) I. h t, N ED V 6 T M '. o,, g-s /i 9 9? g$ s

m. Q f~

s N b m e,. o 4 s t. s A 4 N k O D N W W 5 h g u 9 v. A ~ .y. sg 7' N t/) e b ~W g m . s k gj D / N / / ~N. g ,h A k k .s. Ws n 4'., w a g, O D %7 ), 4 l' t' s N s' Dc ? .i rW6 5 N '4 O 'h ? h s e. N-4 M g 4 % v. g ys. i N n tb .5 1-W s c. d .c, 'v. c 7_ m b 5 N f ER , 7, ___ _ _ 2 '<

i. t.

T / y" n v. .t ' n.' T'"-l%I d'\\t

m-,r

,h N y )

~- CALCULATION SHEET .e CA t C. NO, REV.NO. i CRIGINATOR DATE PROJECT M/DLMD WM / / - OATE N'7' CHECKED gog no, C T12.0 suSJECT ~O E O ~ !b SHEET NO. f427~ (inch 'Z \\ n.?"et. ,PPoNLei A Y. D-Fl R E M M L.: iv i l 0 826'03 $24 *0 (a O*3$ 35g to 42g.c3 o 3.rc Tse HQ.d'-> .50 42c 9y -I oe 34 s~. g4. g ?,97au,a.(.cri.' v 5o f 2g.Jis b1b

  • 2 5~

2 't 300 7es e.96 32.' 70 f.2.6

  • 1,7

- 3 Fb 3kf_ _, 90 C24t17 . - 3.Sb-330 f ll O 62/3 33 '), ty t.\\ .yjg X f . ~- /M bzs 5'i + 0

  • 7 2. ~.

/50 C 24 F2 + 0 ' T4 k. 3 0 5/C k /70 t 626. % +0 Ik 3 10' .!c 1 425 33

j. %

ns e thw. :.10 42.4 17 - 3 34 l . is ' 424 l/T ^ pso A% I5'g.(n & Lf

  • O !

h*'b5 2A T ib g, g .M L2f. 52 62.r. 92 ~ &* W " $90 l f 424 23

70 4 a.-r. s 7 f 31
9f l

Us 9, 624. /4 62.r TS 3

72. t ' ^3 0 I

5 's \\ 6 26 or 4 :. 5 7 5 w ;I c,:.r.gi - 3 24{ v7f

r.,o w

ezr se 62r. rr. 3 12, 1,o 2,w ! 245 39: G =s. 70 s 2r. 'zt 4 2. sso s to 42r SLt 4 32. 2.ST s

  • 30 p

g2.r. 28 - y 91 .2.g0

so

, f 2. r. i S. ae ' 2yr n 70 g2.g.IC

b. 2t s 2.u o s9a

' 6 2r q - 4 36 '

2. = C J/O

(' )r. / f. - (3 2 y O'd X T30 61C. 2$ : - 5. 2.e z.= r [.5~9 ' (, 2.f ' }} ~ !z.1;4 . i'] l ( 7 f. yf ' ,:.. D 2 ;/2 ,~ ! ~ l ' ( :C

  • 5;,'

-/*ff 9

e f 9 e l i m.=...=..... --.--m ..-.=S._._,. hm,i 'i ^ = W [ e 4 ';.'. i. '-5 I Af Nb: 4... 2 "'T r - N - m ;= Q=.J $- : &'--* +. s. 4-_____...

4..

3.- M----=: 's'." 3,~_ } - ' 4--* _~c.~. W


g.

,, ' ~ =a ,._a-m ,h-- wh.'s m_ ~ m

== _i. 7 og _..+ em y 4 Q., ,-3.- ,%v .- 1 _ -< a g -Q m 4 _~ m ~. - 2 1 -O m, ,ia_- r

m. -4'e

,.m S e&% 1.N. -_ i -'_W q e %,9 n m1 m- '~ i._. MN r-. g ~, mm . -s - - --l--- N __ y - F-- g o__.. [ %._#N w A Jg - ;- w* am-: t, ~. --' gy mm _,g, .2-2- w3 = -11 m v a.- g l W '- =x Ce L'- W. U =M 4 x3 g *E _4 - ~ - - -. p a,f- + -- x m-V m-" [%% ^d% = y ~ 1 s ex a 5


7-----.-...__.

l' h __ - X k_, i-- e 7 _--_t-.. O_ _ f _ _~ 2 r m-y,--- 7 r - _d. 41 (ew() A 7

D Typ 4p+j79 FULL PROFILE SETTLEMENT GAGE DATA

SUMMARY

26-OHEC-16 TABLE No. PIPELINE DESIGNATION 13 Baser.cnt Servf ee Water Pudo Structure LOCATION OF READOUT POINT ELEVATIO'N OF PlPELIME INVERT AT REAbouT POINT AS SURVE ED BY 626.06 BECHTEL POWER CORPORATION b DlS'TANCE FROM INVERT COMEm READOUT PO!NT ELEVATION S/ (ft) (ft) dY o/SP. //A) AllFieldDataColleebedonApril 355 1 0 626.06 10.0 626.03 3 and 4',1979 r 945 30.0 625.94 l -/.08 i ^ 50.0 626,25 70.0 626.17 f 626.1-1 - 3. Sfo 330 90.0 t l 110.0 6'26.33 Y 4. 3 [s '320 l 130.0 - 626.51 3/5l150.0 '626.52 + 6. M - f l170.0 626.46 l 190.0 626.33 .!210.0 626.17 l - Yd8 2}$l230.0 626.01 l' I250.0 '625.92 'I l270.0 625.87 l290.0 625.83 -3.2f 275 13'10.0 625.78 I l330.0 625.70 i 350.0 625.55 l390.0 625.35 Note 40 f t. incre:nen t 255 410.0 625.34- - 1,32 ~ l430.0 625.29 !450.0 625.21 - d. 2 4 E 240 !470.0 625.18 l490.0 625.17 MIDLAND PLANT-MIDLAND MIDHIGAN C t.s.oi rf"HNe *At sN tTI-d Mt:NTATICN ENGINEEnG r

  • - p -* ;-. -

e.' - - -- - w 1,.a.y=yarr71*I1r* g Yi o y,c VS2M -h ,ry r f_^'s 3 p p g ;f;; -yFg.f{ ]

(Q O FULL PROFILE SETTLEMENT '* D TABLE No. 13 i LOOATION O.~ READOUT rolHT_p.ew ene serviee unee J. po BECHTEL FOY!En CORPO.* ATION_626 en senieture ~ S SURVEYED BY l$ O! STANCE FROM p,p,,R,EADOUT PO:NT IM era --i

== evv (ft) ELE TICN COMMENTS j _230 1 I 33g'O 62s.is d I A se. b v.) 5'o o '1 sn.,s Go 24 sno n I sn.,, 476 n j 2/O 590.0 625.56 g 610.0 625.4a - /.4F 630.0 ~ -20l 653.n 623.33 j I [ ,w ? [ O [: 2 1 6 IDUND PLANT-bilDLAND MICHlGAN i c., g Egi'1W va~ve, ,w- -'4 i 1 i ,-,+-e,,--- ,,w,,---- e e, ,-rw--w wwwww w w*w w --v- - - - ~-,='- m en wr ww'w

= 9:yec -g C: % MJ E/'j~" ME101 IN P U T CA P O IM A GES lhPUT CAPO 1 11 21 31 41 51 61 71 aty + t + + + + t + 1

      • M-169 REV-5 AND C-1146G REV-0 2

HED TITLE: MIDLAND 3c/26-0M61 -3 SERVICE WATER RETURN, 4 PE06NO:222,PPOJNO:07220 5 UNITS =2, USER =KVS, CODE:S! F. RUN LOCASE:TMRM1 7 RUN LOCASE= Wit 8 ANC 355 0.36 E 27.9E6,00:36 T H I.C =. 3.7 ' t 9 1LBS/F7:Se6.0, THERM:0, R A: 10 R8=.999,RC=.999, 11 353 1.94 4.468 12 RAD 3 5 3-"-- --~ ~ 1.0 ~- 13 RAD 353 1.0 14 350 8.64 5.49 RPOI AM=36.0,RP THIC: 37' 15 352 1-T 71 3.~2- ' ~ - ~ ~ ~ ~ ~~- ~ 16 350345 4.6 11-5.6 17 RAD 345 1. DISP =-1.08 --to 347343 -10 1.5 7-1 1 19 342 9.71 1-3.2 RPOIAM:36.0,RPTHIC=.375 20 342344 1-2.053 1-8.07 21 3 4 2 3 4T --~-T; Q 1 1-3.2 22 335 6.48 10-2.17 1 00:26.0, THICKS.375, 23 (BS/FT=320.1 24 330 - I ti U. 6 11-5.o ---~~~~ -~ 25 RAD 330 1. DISP =-3.36 2e 325 -le-4.6 11-5.6 ~2 7 320 -1o-4.6 11-53 28 RAD 320 1. DISP =0.36 29 315 4.6 11-5.6 ~30 WAU 315 1. 013):0.84 31 310 -to-4.6 11-5.6 32 305 4.6 11-5 o 33 300~~ -lti-T.6 11-T.6 34 295 -to-4.o 11-5.6 L 35 RAD 295 1. DISPs-4.68 36 290 0 ~ 37 285 0 38 280 -20 0 39 275- ;2T-0 - -~ - - ~~~--~ --- 40 PA0 275 1. DISP =-3.24 41 270 0 42 263 0 43 260 0 44 255 0 L 4 5 ~. ou 255-1. DISP =-4.32 46 250 20-0 47 245 20-0 g -. 49 RAD 240 1 DISP =-o.24 50 235 --.2 0 0 g 52 RAD 230 1. DISPz-e.24 53 225 20-0 5'4 . ~ ~ ~ 220 20~0

^ .ce: ve. -r c:&tc-b/"/n 1

  • 5 215 20-0 5e 210 20-0 5 7 '.'
  1. I0~ 710 1.

OISP=-1.68 58 207 20-0 59 205 20-0 oo 201 23-0 L 61 RAD 201 l '.- DISP -4.32 92 --~ 201105 6.0 9.0 L 63 170 26-0 e4 180 67-9.0 L e5 170 9.0 4 0.0 L DISP: -2.28 oe. nAD 170 1 oT 160 25.0 56 150 20-0 60 RID 15U"~ 1. 013D=-2,16 70 140 21-0 71 130 20-0 72 ^ RID 130 1. DISP:=2.le 73 120 14-3.0 74 END + + + + + + + + ~ I4 CA7U5 IN INFUI UEI6 74 CARDS IN LOA 0 CASE THRM1 74 CAROS IN LOAD CASE WT1 0 WARNINGS 0 ERRORS ~ o P K Til ERFUIT5 00,PL 93. ( AEE SCRACH, di,4M *ME101. met 01I

      • ME1011*** MEto1I/FE805
      • COPE CHANGED FROM 35400 TO 41400 OECIMAL nUROS ***

h

yt y,,. SPECI AL. STUDIES PME I eF ~ PROJECT 8//dlA/dh -@lT.ONE--- SsEET _ O r... JOB NO. . 722Q Pi ArJT DESIGN GROUP SYST E f.1. _.568v1.de __ WMER CALC.NO.... j C O 4........ 15O NO. d-/67. 4 _ ///-/d 7. .. R EV NO. Y L A. DESIGN DATA B. CRITE RI A 'OBJE CTiv E S To SHow 1Nar 7//E STRESSES J) pipit /G f.' Lass s/EETS - 9220-!71-#1(0.) 'M A'AIEa P//>NG LVE To Esv. /5 4/jy? M yr/At. .gra'.viEJVT' fjpg ! ff" Hb. WAtl IflSET TNC $C05 YEGi/itEi7:E!]TS. aart : Asms sA-Iss Bass 2, &>. KC-90 AsmE SGcr>w.DQ Ad-36S2.3(f)

2) sou a scal <

zusnumzunmou E' (' *) A $1s E2s. e Ftiu. fgomtG SErruid3- /r 2 C. REF ER ENCES: DATA - MRit I99f i) iistijs Sz-c. 21*., ScissEc7]cW Ne

2) ofE Ao/ fuM: Swm # d?38L52 6'Esw F-$ Is-19) yyg: 7/ J/79 k
3) 3 4 AE R/LL ffoF/L2 SETTLEnf.Nr MGE MTA F/L& $ b-2220-R,GE: 924/19 4)B&*.HTEL Maww& R SK-C-(; 75.

SUAVEyED ///E/.jMS /bMLE5a 5)sscarEL t/jwus:11-/67, C-Il4G > irH4 9> /rf.173 -S/h2 Lax.T. D. DESCRIPTION OF ANALYSISISTUDY PERFORMED: DIFFEA5NTIAL-SETTLE /7/ENI~ 37RE5555 iA/ BuRIEb i /A/NC. - IME-/01 - LiuEAR ELAs' Tid AMalySIS. gg"- oggc g4

3sev1CE wAriK RERRW FRom UNIT fl 19281V5 BUR 04 To

'36"-OHBC-%. E. CONCLUSIONS: (q;;gx{ S A Ah = 2f445 g j 3 Se = S2,5x. p = o. Ee. (tosJ of uc-3452.3 (k) is por wnn.

. ok s

I E ACTION NAME SIGNATURE DATE k C^t Ctut ^180.4 uv Q f' 777)Q(jf & }, jf[g) & }&) (& S. g[.pg$) ff,f l7g f ~ s.g w k ik,,,, _1,1,1h ' t ea u n, ^'mivr o ur A. PAtct. M h_ ti liN 9e E'O.'n'i..^i -;V; i.'-ll.'. ;',,*o~"~" ' "~aa' i l

( i> CALCULATION SHEET REV.NO. o cAi.e. NO.

  • T-DATE - 7
  • 2' ! ~

CHECXEO H ". A - DATE Ii -7 90 ORiclNATOR DROJECT IDLN D UNIT 1 f1 O7ho JO8 NO. D44 CSK 26-O & - % / sus;Ec7 3agg7 no, S St/O.S

  1. 1-v&f CM S6 HS **

5 % 31 l G t M.co 577z.77 fLCo' 3.5 Mo Wo gT,. [ 90 M '6 1 2' eg ff St.oo f25 l 335 E.Cs 7.33 5 5I 64.0o l ~E /b4.00 i "7 o f.. L-A '( Wo 40 - b.14 lb 60 M.w L sY At (, o - G.-l t, (pgo - 3 4% , y.4-g g,oT /t -5 64 ydo 31 1A %.12. SO 'diL (,7 0 C4 'I l G T5 !. 41 90 ~~ f-44 9 (,o -- 4 4+' O ~5 7 5 ~53 706 To 100 - 3.Ts 4 6 50 - 3. O - 4%9 760 'C i10 '. 9 4 e40 - 3 6'O ,t.4-19 3.it 6 50 2.6+ 6 to .3-1 L oM -7 60. 13o 14o 2.16 4 to LA C 160 j.9 t boo 2% 0 5(. tO po - 2. 2.3 57 0 /70 - 2.TV 5To - 2.40 o s +T (To - 3.Go 570 l \\ cib -3 % Seo - S. % o. (, o >Qb - 4.8 L. 210 - 5 40 5 40 -4A4 0% 220 6-36 C3o -6.% 52o -G.4o - t. gc, 24o mq A4-M5 - 1 to Em -63 -o. u AAO.920 6/76

( v CALCULATION SHEET 1 co 4 CALC.NO. REV.NO. N*'7"? D* O* DATE ORIGINATOR l DATE CHECKED PROJECT ID D U N '? I IL JOS NO. C71'2 a b b ~O ~b

UBJECT SHEET NO.

4_.._... E y22-77 55154 o o -4 % % 61

1...

.537 u 7,h 1Dh ) a i L=. M'7-I$ . O.32. s .6._-_. b k _, _ __D b ..? t. a 4 19& C.. Q& - _.. L h. 50\\ -34 y_.. r .l t i .....-.....__f...__.... I i 1 1 l ASO.Q20 6/76

~ ( CALCULATION SHEET CALC.NO.- I O O d REV.NO. lI 7 DATE 7*1I~79 CHECKED Af # DATE ORIGINATO9 DROJECT M % hi hh U M ' "f I Y1 JOB NO. o711.0 SUBJECT SHEET NO. / 4X AY d V-L / 34.7f TO 00 p.60 - 2 6-(, L. /0 / 44 9 % sc.cs ss w j 3 6.11 265 -ll-6.(, - /c.- 4.6 ao.o pn su. w ?% - /-S.64 3 -o C4% so 4b . /.7 t. 2A ..4'4 y x 4-? v4 70 44 95 ylX 35.n 7... s. G --ee. G .+ 6 4@Se me e ..he et e e 1 1 AAO 520 6/76

.y;' ~ [7 FULL PROFILE SETTLEMENT GAGE DATA

SUMMARY

A }1.4 l 7Q. h~ 26-OH3C-54 II PIPELINE DESIGNATION . TABLE No. LOCATION OF READOUT POINT Basement Service Water Purao Structure ELEVATION OF PIPELINE INVERT AT READOUT POINT AS SURVEYED BY t BECHTEL POWER CORPORATION 626.06 DtSTANDE FROM INVERT COMMENTS READOUT POINT EL'EVATION a/;J." (ft) (f t) hY asp. //a.) O 626.06 Al1FieldDataColleededonApril" 20 20.0 626.04 5 and 6, 1979 l - 0. /2 40.0 626.15 l -5.52 60 60.0 622.99 80.0 622.86 10 0 100.0 622.71 -8. 88- - ~ ,W2 [20 120.0 622.60 -Y. ib /40 140.0 622.62 160.0 622.70 180.0 622.85 200.0 622.95 220.0 623.05 240 240.0 623.10 l - 1. 2 i. 250.0 623.06 -dO 290 280.0 622.95 300.0 623.00-320 l320.0 623.16 'I '- 3.48 ~ ~ 340 340.0-623.16 - 3.4F ~ %O 360.0 623.20 .3.00 l 380.0 623.16 - Y. 2- } 400 400.0 623.10 - 2.1 l 420 420.0 623.25 440.0 l. 623.25 k df,0 460.0-623,22 ~ - 2. 75 N 480.0 623.01 J j 0 MIDLAND PLANT-thlDLAND MICHIGAN w ET [.. e f~.. 'l ~ :-7 Lt J:.. .n rr,- ca..vu i...:.~ w o. c .-w m 'D _"A,, ghh gge .m'-- 3 _ _ - _ _ ' c__ _ _ e

w. m* 4l2.4l~M ~ i _ FULL PROFILE SETTLEMENT GAGE D e ! F. i ! W TADLE No.- 11

y PIPELINE DESIGNATION
  • 26-ORBC-54 l"

LOCATION OF READOUT POINT _ Easement Service W ELEVATION OF PIPELINE INVERT AT READOUT P BECHTEL POWER CORPORATION: 676.nn <~ .s -6. - DISTANCE FROM. INVERT i READOUT POINT ELEVATION COMMENTS ! u $0' (ft) (ft) ~ Soo J 500.0 AY o$P, (/.) 622.92 ~ _520 520.0 -4.30-623.00 ' 8.40 540.0 623.08 - 560.0 -623.17 t 520 580.0 l' 623.25 ) MO 600.0 - f.4 ~ 2 623.26 620.0 -.2. 28 623.19 640.0 623.15 660.0 623.08-I 690 690.0 622.91 ,l i -5.18 I 1 a 4 l i i R i z i e i w d MIDLAND PLANT-fdlDLAND Id!CHIGAN a j _ GOl! ~~ -..:- -- g -- - f [=~- ~ ~ [ "~ ~.'.T:- - l-_

1 S M J t' Q 3 5 L 5 2-l/ !/~T ME101 INPOT CAR D IMAGES ZNPUT ' CARD 1 11 21 31 41 51 61 ~ S EQ + + + + + + + 1. RUN LCCASE=THRM1, 2 RUN LDCASE=WT1 3 HED TITLE = IDLAND SEEVIC: 4 TUPN 26-CHEC-54, 5 PROJNC=7220,PRCBN0=1 6 US ER= SJ,0 N ITS= 2, CC DE: 7 ANC 1 0.36 E=27.9E6 0D=36 0,E:1 2 2 8 LES/FT=565.57, THERM =' 9 PA=0.9,RE=0.9,RC=0.9 10 .214-8.076 -11.53 11 20-4.856

3. 4 '

12 RAD 20 1. DISP =0.12 13 30-8.1926 5.736 14 40-8.1926 5.736 15 J46-5.186' 3.63 16 800-5.186 3.63 "C D = 2 6. 0.,_TRI K = 0. 37 5, 17 LES/FT=278.57 18 46 51 1.72 -3. 2.46 L OD=26.0,THIK=0.375, 19 LES/FT=278.57 20 605.41 7.73 21 RAD E0 1.0 DISP =-5.52 22 705.736 8.192 23 80 5.736 8.192 24 10011.47-16.38 25 RAD 100 1. DISF=-8.88 26 12011.47 16.38 27 RAD 120 1.0 DISP =-10.2 28 14011.47 16.38 29 RAD 140 1.0 DISP =-9.96 30 16011.47 16.38 31 18011.47 16.38 32 20011.47 16.38 33 22011.47 16.38 34 24011.47 16.38 35 RAD 240 1.0 DISP =-4.2 36 26011.47 16.38 37 28011.47 16.38 36 RAD 260 1.0 DISP =-6.0 39 30011.47 16.38 40 32011.47 16.38 41 RAD 320 1.0 DISP =-3.48 42 3357.75 11.03 L u3 3u0 6.53 44 RAD 340 1. DISP =-3.48 45 360 20.0 46 RAD 360 1. DISP =-3. 47 380 20.0 48 400 20.0 49 RAD 400 1. DISP =-4.2 50 420 20.0 51 RAD 420 1.0 DISP =-2.4 52 440 20.0 53 460 20.0 54 RAn 460 1. DISP =-2.76

s a u - q s s ts 2_ 7/ulm 55 460 20.0 5'6 500 20 0 57 RAD 500 10 DISP =-6.36 58 520 20.0 59 BAC 520 1. DISP =-5.4 60 540 20 0 61 560 20.0 62 580 20 0 63 BAD 580 10 DISP =-2.4 64 600 20.0 65 PAD 600 1.0 DISP =-2.28 66 620 20 0 67 640 20.0 "68 660 20.0 69 690 30.0 70 RAD 690 1.0 DISP =-6.48 71 14801 a.856 -3.4 72 END + + + + + + + + 72 CARDS IN INPUT DECK 72 CAPDS IN LOAD CASE THEM1 72 CABDS IN LOAD CASE WI1 0 WAENINGS ~ 0 ERRORS 0 FATAL EBRCRS

D,P L 93.

EE G RACH. 2T,KM *ME101.ME1011

  • M E 1011 * *
  • M r.101D F EB 05
    • COBE CHANGED FROM 35400 TO 41400 DECIMAL WCEDS

=e

-3'.!;j' SPECI AL STUDIES Pf4c, G. I cf 4-PROJECT _.b hl..A_ N. I QNI SHEET \\_ OF. I JOB NO....._7. & L 0 Pt AtJT DESIGN GR'OUP SYST Ef.1: 5 s_R_.y! c E. _tOATER- -'R. N AM CALC.NO. ___..._. 110 NO. N-. lla.*7.I.k)i_.. ._ REV NO. 6 A. DESIGN DATA-B. CR IT E RI A/O B.'ECTIV E S l ro s we w r44 r-s m r n.sw h Pl PI MT C L ASS SE. sTRazrss Lv raua. sed Pf Plaq ,2.2_ o - m - 48 I w

4 y,

m,y,% c,x 8 '# S c-++ 4 0 ) (0 : 8' ' S, Ptps : N C ac.52. 3(L,s & =. o 3 ?-2." AsMa s ec.. I s t NATL. S A-10 6 GR. S sc52.. (1 O a.)

I S'7 '7 2 }. s oit., 4 R o c x lu smue ra ri o u
1. % :s B S c l=U L t PfuI:lte. S e e ^^ Ni-E

@@ +ATA TNVhy M C. RE F E RENCES-j gg_ c_.c go s ua.veyeD ?!Pe LIN E p ra c r:I LG. Plpsy PLAM-Am C. 2). /AfDM - I fo 7 (dQ)(. 1 /

3) SJ$RL M T:A j b - 2.2.2. o - 2., 3T-lf 2.3/73 8 8La s

+) A s/ w a 4 PV c.oe, Sec.113 1977

5) M E Io1 RVN: VM*[df 6-IL-M

{va 4/<3y 37-152 1 l/ g,gtl SNUM; e) D. DESCRIPTION OF ANALYSIS / STUDY PERFORMED: M.r e s tN E U f M E.2) P IPI N g 23 u e To 'D i l: it sTtem T/4 t d5s TTL e m.cAJT L wnR., EL.A A 7 i <- bh>'M, 8"- I HP C - 3II ; Ss R.vi c s kl ATC R. % E ru R M I:Rc M b m E-( 2 U"M 00 W i E. CONCLUSICNS: %pg=^ 2.3,7 8 3 P.s t' ; 3 Se = 4 5,o o o y d 3 r e s. (l o a) or: N c-3 c n. 3 ( 6-) i s ^* r . '. Ok, l E ACTION NAME SIGNATURE DATE h C^l Cut AflO?J UY (, hg% Q*"{f , f, '[ ll-[=hh o.t ca n to pgra bygg ,A g p ~ jj - g - go 1 ^'<ovco uv A Mvh FRu H _ g- % l ?'O.'MM,'Mrt;;.urt"~ -' \\

( t ) PMe s oc 4 CALCULATION SHEET CAI.C. NO. REV.NO. CRIGINATCR DATE

  • CHECKED "t/f M ATE

~ ~ ( pno;ge7 M/ 3 2M - ON/ 7 I N2 O

oe uo, SU8 JECT

/ OMO N * 'N' SHEET NO. MG-b/A/E : 8 - /h% C - 3//. 3y ....__...._.._...__M S-47:0 Bl \\. /..E.aRO*3ff..... t e. a e '- g ". .R s$ to Z q._ g - 70,o c fy x

m. s,

y n 834 cs y x. 7 M G. -O .e...,,- .,m g '.I H&C #blI ^^ g s ^ ~Q t o' fr n' Qt ( N bb'b, u 1.G6 4 2&bec. S 'Wi; AAQ.$20 6/76 ~

7- FULL PROFILE SETTLEMENT GAGE DATA SUMMAKT g, 3.H s u.. 8-IH3C-3II EA P!PELINE DESIGNATION TABLE No. LOCATION OF READOUT POINT See Attached Ficure 7 ELEW. TION OF PIPELINE INVERT AT READOUT POINT AS SURVEYED SY 634.75 l BECHTEL POWER CORPORATION P Yf7* ll, $N + 4V D l DISTANCE FROM INVERT COMMENTS i READCf)T PO!NT ELEVATION mm (ft) (ft)lDER@ ^ 0 634.75 63s.5T All field data collected on -9 (id) 10 l 627.43 C.ts 17 l Sept. 11. 1979 - 3 55 [ f (T5) 15 627.42 l -9 j -874 h' 20 627.44 25 627.51 -7 32. F. f (33 30 627.63 V -4 % ? I i 2 I wA 2:e i Q t 5 i ,4 hi x 3 l l I } e i Y \\ O n N d f I E MIDLAND PLANT-MIDLAND MICHIGAN I I i w M I e ii 11 caera:-=c~s we~rarc~ se.Gs=s f, b h !! [

I l f g w _ _ _ _. _ _ 4 --' ~.~._r_-*.-;;----** t

  • --'~.:I_..

w i I _q_ _m _.A.- _. y -~--"' --- _ *-d; - :g ~ +- W --- 4 :- y*" : - .m _- w .--e , g1_-,_ g - g. ;_ C-1. ..___..y- --w i _.;.----.. + m c m g N_ L^ ~..

.m a

- 77.* x 1 A --+ Jgj g a-----N + m 4

r. a-m

+-- m

4. -

~. N m D (O V A .'_g _-M--- .x-y-~- t...g ._4.___ ._. f g- - _2. ^__.g ..w .._ 4*

..-.3__2--

4..__.._.... g ~.- ~'.- "M _ _ n -- .,._.C c_ c . _: 3 .:n-.,;;_ _. a:.-.--- _m ~ ~ ~ w 6 - a 4 a - _.__. 6.* .; ;y ? _ _ -d-eeem-' 3._ m _....e-m ew I k u 4.- *. - - -.^[ . wk} k. .=_. '-ur ? i : - ~'1; f; Q _7.. E ~ 2 5s .4_.___ i w +

  • t 4

-~ w _7 Q 2g -f- ._N ! ~ .._._a m__.__._._._ g w -LN y 3 )%- p "O X-? .._._=2--- u = Oe ? "e ~_s--- OW m -4 .h-mem ..*e_.W.ee--- .-.e. i . m.._. _~ -w. 4 c y .mo-m., >='s.4 1 D-W g. 4 W.---e. ..__..&--_Y "W' 'd 6.esh.-*W'. .e._M--.ime.. v._. ..~-t_-._- ~~ p.... --q-2. :.. y, ..____-+-....--.-.,g..--- '--- :-----t-.. -- t_.:.3_ :: :.:,- g n. ; _.;._ ,L ,, -. _ = ~ ~ - _.- g _- :


;-~C---+~--+-*

  • --.tm. !: ;;. --,
  • --.g.__;

m _ __ _MC,.* O_3 ._":.=-+._ h: - ~.=:: t.- r -- - t-.-._ 4,:..... _. - - - - -_. ..q._ -._.-..~.}._._.;._1...._,...r._._._.5..._... ______,,.._..,_.,_.,,,._t__.., ..e_7 a .i a __m b- - --.-.,--_.,...r..__7 .--a-.-a,--..+._.g

p. =: = = =.

.___,._,,1,.__ - - = = = +ao+4>vd I % aum e

_. __u. ME101/G4 HE101 INPUT CAR 0 IM A G. E S INPUT CA.R0 i 11 21 31 41 51 61 71 SEQ + + + + + + + + 1 e** M-167 REV.*8 AND SX-C=650

==== SEPT 79 OATA 2 WED TTTLEsW1DLAND 8 = l HB c = 31 - 3 PR08N0m ,DROJNCa

722, 4

UNITSm2,USERuCS,CCOE2SC: 5' I RUN LDCASEnlh3Mi 6 ANC 7 -9.0 Ez27.9E6,C0a8.626,THICa. 7 THERMS 0, ras 999,RBs,999, { 6 10 3-0 9 RAD 10 1.0 DISPa=8.88 to 15-s=0 11 RAD 15 1.0 . 0! spa =9.0 12 20 5=0 l 13 RAD 20 1.0 OISPs=8.76 l 14 25 Sao 15 RAD 25 1.0 DISPa=7.92 16 30 5=0 17 RAD 30 1.0 DISPu=6.48 18 END t + + + + + + +- 18 CARDS IN INPUT DECK 18 CARDS IN LOAO CASE THRM1 O WARNING 3 0 ERRORS 0 FFTAL ERRGRS FTEE 3CRACH. AC HARNING 100000000000 KGTe<M eME101.ME1011 oceME10 t' ! * *

  • ME101I/FEB0 5 000 CORE CHANGED FROM 37044 TO 43044 OECIMAL WORDS ***

L k

8 g-PIPING ANALYSIS CHECK AND COVER SHEET o we, / SPECI AL STUDIES PROJECT: / 1 Add //a/4-2 SHEET OF JOB NO. 72 2 O PLANT DESIGN GROUP SYSTEM: 0~dosdJ M 1 W M j's Evr . CALC.NO. 1008 ISO NO. /-167 %) REV NO. 8 A. DESIGN DATA: B. CRITE RI A/ OBJECTIVES: r; shs H I /Je s/seau

1. Asia % Smr: j f-4 e i f w. i e

,;, jnu e J A,', -y de 4 (Mac-Je.14,) d e,&I se///e,,w, / aea/ A,,, S e " Sex. 4o j,fsc^r?Y5c?sss.3@) 3 fal. I. : Abit - SAlos Gn A 0.9. ,,,,,c, g 3g c

2. Salz $ kocx. AJfAaMzdra1Iod C. REFER ENCES:

1.JJMZ fact 2. 0.d2Jcroh/-50 i ku ldof5s 0srfxJMsdf SACS AfA VSNGO(fay:Q4.$ LOG .2.jffjoj)far, S (Vfd. G4 &llLl50 0""MAH - &'1: 11 ,7'9

s. s us-6 Asrizz Jirrizx.u<

fJ.$ 60 ) E x t.i2rrA - Jzs t. J J '79 4.daA/AMD A'/sxias.r Asrixs : SR-C-650 fed. A

s. Ysip Aws Ass - bra-C

//-is7 (a) fes. e D. DESCRIPTION OF ANALYSIS / STUDY PERFORMED: 9:/rswrIAx dirrxsxur dixissa la,daxkp /p//r ~ }{A-1O1 - pssag fiasric,ild,uysis pas,/s: S- ANAC Osaacs \\ Var.ce brxtr wax .)2*Jsi Crs'aArut 0cisx 2CA s E. CONCLUSIONS: J/.L6 .,*./ 15 'q', = Q" = l134 7 ; 3S : 4 5000,u,- 7 e fa. Los or /0-3652.3 ()) ,'s Mel ox E ACTION /,NAME j-SIGNAT[g DATE y cAtcuuArton er y,'*u n jb d A IG<o 1 4 / fl.*o"W !1 8C7 2 catexto av C HAKfMaeJr E,4s A v e U ~ &,,/d Q fl. 4_ % t 11 TO APPROVED 8Y J. plyg t gJj7 f f _f g_ gg p_ 1 SHh'i#4;"w'a ro*"*" * "'""-

6 m' (' U l CALCULATION SHEET OO R EV. NO. CALC.NO. l I O -N N~b*SO CHECKED ATE CRIGINATOR OM ' /' C CATE JC8 NO. NOO PROJECT ')ldil') // 2w M ' 6"- 2 h'A o - 82 ssEET NO. sus;ECT b (0] C'!* 0 / AW= S.. ~ e.$ e +5. G 3 0"s 6 ' i 8/(-C - 650 /d. A ~ o h&Udfil bd 2.- YSN00

. ~

I- - fwM 0. __... __... f a p. i.._... .2 .. _.-.-- L.--... O.. 4 A e At. GAB.6_'. 8 .. _. _.. _ _. _..... __~ x..._ 0 i __ __.. G.Q a-. _. A f Q c. - _. = o. 15 - w---- L M -c. 2.4, L..__a....__ 4 C _.. _ ..._ o.. _ .,:- J.. 20 .._1..__.._. s _. 25 _... _' O ~_ _. (4 AY - 4. 56" i i I.- .i. t. 4 >._ .._...._ p Q ._--_.- _ N. __.... 34 .t g 1 _ _ _.. ~. t i 'l w ..i . k _ '. ..,.,....._..-_...._.......s. ,,-l- ~ ~ ~ _ ~. j AAO.520 6n6

cn +g,w-. w w was aca e m w w w w e m m e,w g #. a a # m.ssd FULL PROFILE SETTLEMENT GAGE DATA

SUMMARY

TABLE No. 93 P!PELINE DESIGNATION T-?H3C-82 LOCATICN CF READCUT POINT See Attached Ficure 7 ELEVATION OF PIPELINE INVIRT AT READOUT POINT AS SURVEYED BY BECHTEL PCWER CORPORATION 634.96 DISTANCE FROM INVERT - hA'A-MTA COWENTS umW READOUT POINT ELEVATION j,7yy (ft) (ft) 0 634.96 All field data collected nn -I'48 7-10 627.63 'Sectember 11, 1979 l -G. 48 - 10 15 627.59 - G.96~ 16-20 627.59 ~$ W 20 25 627.65 '-G.24~ A5" 30 627.74 -5. 3 G' 30 33.7 627.79' ~4.5G" 34* l I I ~ f i j MIDLAND PLANT-idlDLAND MICHIGAN = GEOTEXCA4. INSTA_r 'ENTATCN E.%AEiU'G

a T 6 m .._~..!. 1 ? I l 3 $ s.% w l ~ 'J=~%.:_.- - Mi-j 1 W l 4m l ~> = t- ' ( - w = _v l - O ---4h w 1"' Y_ ---s -t ti Wry ~M ~ =% N In m q --+r j R: 'Q-s 4 m_. m O N s I 2. w' w w u 6 ( . m _L s e 5 .j -epm wi E _E,. g$ u 0 t Wn. ts

. o
  • g y

a xE e* mE h ,W- , + Y-V i Y g h-' t 4 N __a ' ' ' ' - ' ' ' S A 6 -h.- q _._5 9. . q .._r. .a... N_ ^ e ( ui) Av e

<7 sw. - v i sj f u. v i c a-s7, w_,v 3 5_a733, o yv i e gryo,o'v i g gypa r ovu 14 3?qa r ovo 14 3ago r gvp 123 0' ME101/G4 ME101 INPUT CAR 0 IMAGE $ NPUT tRO t it 2t it a t_ M! 61 71 SE3 + + + + + + + 1 _2 3 [ REF. ORAW. NO.1 9=167 (G) REY.S LINE NO. 8'-2HBC=62 8 _J =. REF. 90fL t ROCK ins?RUMENTATION aFl!LL PROEILE_3ELI' 7M:Nt_ GAGE 6

SUMMARY

a TABLE NO. 96 = OATA COLLECTED ON: SEPT. 11, 1979 7 5 HED TITLES SERVICE WATER QUTL 9 FR. DIESEL GEN. COOLER 2E 10 USERaVINHSON, ,11 PROJN0s7220,fROSN031008, la UNITSz2,C00EsSC374, 13 RUN LOCASEsTHRH01, . _1 4 RUN LOCASEsbT01_j 15 ANC 7 =6.48 00s8.625,THICxso.322, 16 LBS/Fia50.24, 17 Es27.9E6, THERMS 0.0, 18 ram 0.4 R830.9,RCm0.9, 19 to 3.0 20 15 5.0 2'1 RAD 15 1.0 DISPu=6.96, 22 20 5.0 23 25 5.' 0 24 RAD 25 1.0 OISPe=6.24, 25 30 5,0 26 34 3.7 27 RAD 34 1.0 OISPa=4.56, 28 f END 29 30 +- + + + + + + + 30 CAROS IN INPUT OECK 3: CAROS IN LOAD CASE THRH01 30 CARDS IT C7AD CASE nT01 0 WARNINGS 0 ERRORS 0 FATAL ERRORS 8EE SCRACH.

WARNING 100000000000 IT,KM
  • HE101.HE101!

1 'oME101 t *** ME1011/FEs05 ,6 CORE Ch ANGsU IROM JT044 FD 43044 UaGIMAL WCHUU ***

fT;' SPECI AL STUDIES PM6 / OF 6 ~ eA0;ECT.////.4LASA . t/A//.T ONE SuEtT . OF JOB NO 22.2O_.._ Pt i.rJT DESIGN GROUP SYST E:., ..SER .L.E_.. _W/IEA ./[/- /h 2 .. REV NO. CALC. tJO. _1 C.4 0 tiO NO. A. DESIGN DATA B. CRIT E RI A 'OBJE CTIVE 5 To 3Mcw THAT 7/!E STfiSSE3 })fif/A/G dLASS Sll5275. '7229-ni-48/ (Q) /N BuMIEo //P/ 6 00 5 To D/FfEREhT/AL SE77/2 Rat =NT pipe: 2 " sc3. 40 MEET THE dxa facutRinlENTS. ^ D]A T A L.' A 5 n ] & S A -Ic(o, Gn. 8 AM SECDcW.22T, N6-345z 3 (f)

2) So!L 4 Acck Zi/STRulE/./Temw Ep. (ipa) @ g 3 Q '

FnL ffoFILE SETTLEMENT 2 EAd6 D R TA - M All l]')] C. RE F E hENCES:

1) ASR15 SEC,12C SV8 SECT)oW N0-2)&aw M/&is-14)

I?)E lot duA/,' Swm# Gl3P/2 tg75p : 6/zt,Q

3) 54 KZ Fou PfoFILE SErrlEt;EW SME MM FILE #b-2220-R, a4TEb : #24/'11.

4)SMVE YEb.eetrTEL fBwit.G #S P//fLS6 f/'of/LES. s)8EWiEL MAwi%5: 01-167 far. 7 D. DESCRIPTION OF ANALYSIS / STUDY PERFORt.'ED. ofFFEt?&WitA/. SE77LE09/r siRsss&5 iAi BuRIEa PIP /NG - 17/E-/0/ ta/ EAR ELAsT/6 AtMlys/3 8"- jH8c-gj l SE.@lcA WATER int 2r To bW5sl $>DIEAATOR tooler IE-25 6 E. CONCLUSIONS: bfb - = /3655 (d j & = 45,600 f. (QQ = 9.@ EQ.(I0a.) 0F 16-3652.3 (b) Is MY EXCE2eEb. o% pk E 5 ACTION NAME $1GNATURE DATE E c^n uc ^" " E V mARur(bn & JAd085) d.R /)br.oI (k 5.aAc EiT~ 11-6 Yo~ ~

s. u d

~ b>, o ri 7-6, o.i c,: r " 'n I 9

l_g-Zo M/y

^" o v t o u v A. p h l I Ill '8 I fl ( ,g g g g

a. g, _p PMG-2 of 5 ^ l 1,,. i l i. l !.. l.... o 4 i i t g i,. 0-i _. _ _... s, i I .._ I... l... .. f...... .,i .. f _.. i.0 i .. i.. I si 4' . r-i -O-r- t fy 6 d) i.i ; i. .I 1 i ,l l l T.. 's to. ._... i ..i ' p p

... ',o t

i l l 1

i. a 1

3 i } y. _ i. C". - -L .. _L-- l I-.. - - -..:. ..._ L.: - _..L. _..:._. - -.. : a...... ..! o ~ ;

l '

i- ' j 4-E'

-l -

[ .t ~. i._..,b i a d .i. + 1 1 !-}.- ' : _.. j - i ! l! l i;. !Qta...f ' -- i.... l .. t4

.i il I !

7 ._....,i : l - -i{. -1 l !-l.. i l J,.'.l... -[ i l-j { l i (.C i i I ._J...._.'. __:...I _.1 1 l !

1: l-
i i

.i l ! i ..._ e i

l... _

id.l h l l l.. 2:i.. .l. ..l. .l:l t. :l. l n i.!.:. +. .l 1.ni.. . q.. i., + j ] i. u - l - 1 -l., ,I u

i 1

,,s i.. e m - i m

1 tp i.:

n;- .....M_. il. __.t_ _ t 4 ^h 'l-t

i.. i. :.
i.. -

. l.- F..i . j. t: s t p

i.:

i:! 4s -p

i
. M i
ii

.;i ~ i

lg

.i i.lg s !...p nig .i: .l.: i. .n e r p: --in - w

7 s,.M ::-j;

.t: un =: :) er. .i[g 91 : 6 T J-n-- a .!.-. ? e dil.

4:-

?I.. ..n)..i!: Ep h..!...l.i.U:

l a.

Ji. t j.. f

4-!i-

+8: lp. .:1- +: .tpi

i inlq p. f. C -:,::i.;

n!.pp:' :fr si i.i : H.. ..p. -. i. I.

$..jf.

.:{ lp!-

p t;.

np=li:..;. ]. ri- ..{ ;

j,

L fi: 'l-(. .l ~ll r..; i..:1.

p-

~ .. ! n... I....mr:&. l. :.'. -) -. . f.. g. - --l .--. -_r.l:1 ( r : g. 2_ .c ..i;- ,r.. ' Fr i= .m N I r.--

.l.

t.. 'm 5 .m !:+ .-l

=-

. in-.:p

p -
.1 :

- i. !:i n! :. 50- , p.rl ! ;. itc. :.

g.

i. bli; !!! 1 ah

ilr iii!

S!:!. l :; ii ii:ifi.

Hu Wi:i-
i. t_,sk.

i;: nl.: pn y:-.. .l.. .b .t.; rr: - i-g i-g. .s.. i s t-t* +O ~.li. '!h l. ] - jiji: . i:2

[:

3 3" ~". l. f. ill i .i.l.} g Ga.. g *t pf l.., .--+l - l. rl.

n. j:.
4..

. 4-w . c t-- ;* - l-n i.n.

I d 1-

-}.. 2 t- .i.. j u" ~ ]-

l" i

.t: ..il :.

ir
'.1. -

i

l:

j. i. .. V; l lp - l7 l :j cl :

l.

.i i "j -

(

ju-

j.

-l Z o 4 j: .t., i n,, y c i j .} -v e i-1- l i [ _o H._. g .t. J q,, t p-e - l ~ . + =.2 .i. . l.: nj.. at .l -4 ..i .1- !,u l i .l. l,- t + i . p. j i . _{...j.. i I 6 .t, .'t. ? . a.. f... . 9. _.,,,f t ! -l_, -j.- i.

J.

j.. ,.:.l _.. l. ,= . r; .1 i. g. l

i: F:. I -

!:L ..j.- ;;,h' t.y! --... ni :

i.

i:. "i.. bl.:..ii.,.

i

-_a . l .!l=,l. l 3 l- .l -i -i + ... j. ..:..._ 2 _t

4.. _

.. j _.. I l ~ I --c - -. 9i - ! of : iN ! *d' :. M.. 4 :! etc,. - e!,4 .. w .m . *! i- .C o' . : *.. u* r I e - -. ~. - - g ! 1 t ~, -- ; ner. ; i

i. -:
i p

T} ; 7 ;g i 't

.o --!.

i t o y r--- l l s ( _4.

..j

. j. _. .-.4 ..j.. l 1 l:i

i!

i. 2 1 ..g.. i I

PA<E 3 o f 5 ~ ( l CALCULATIO?! SHEET ' f_ClO REV.NO. CAL.C. NO. E.EMA20Tl'h S.JAC195)OrrE ///d/fc N& h-9 N ORIGINATOR CnECnEO OArE NIbMMO V M IT i W2O l PROJECT JOB NO. ' lYb0~SI blY SkbUObb UTilY0 ~ SUBJECT SHEET NO. Y j i N 2 X 4 I P 4 150 w. d C I g u. mw f_ 25 g.' t ygc - gi _ f f // / L. / s b { AAO 520 606

u. FOR DETAIL') OILY 5.5

~~U R 3 \\ r BU LJ \\G WASTE auMP LINES SEE PARTIAL Pt.AN 26-2JSD-2 S.5033. 08 y' M-lG7 ( H-8) -oo ( EL.621'-G". E. 564.00 N i ~ ^ -l J 6D-7. ui I -) 26-2JBDl S.9033.46 NC ~ ggg A 4 EL.021 6" _ E. 391.5o L

s. Soss.08 1

M-169 s.go33.o S.5032. I / E. 104.0o 4]E/ Twec-s2(ets2ev A' " ' ' g z/ 6 g q q g e s'6' " lH6c-S L t EL G26-O ~~ e g g' " ( p% . C f W

  • ~i- ?.'! ! l l ','

\\' A _! %\\! 1' p - _J .g=; j 45 it ^%K- .n / q i lph% x b[.: fi WE\\ ~jJ Eqs-2 Hec siiteto26-gg w 4 c 7g ar \\ I i G

o. 8 l q g ' j;.

E61 S.5061.8l I I l..M02I E l'S 24.50 h m \\E. 209.875 ~ l E 3 *. e':A, y k4 i s soeziai e'esec so ~ ,7 i s.GoGi.81 tu d 1 u so-rr e 324 50 ~ .tELG28v f 2 1.87 5 w cc%. G5tNca. SEEclVK.C M'$ E_S k geu2ig ' JENL GENERATOR BU _)[G ssosais '" ":QiD g b d j' llll s 8 E S49.00 ^ Nc ~ 2 sins,ca l ljl l' ]jl S. Gi20.81 ~\\ 5. llils.si2odil [ s.167.00 i.So*le S ry) ll E. 296.25 / S G'o S.'I6 ],gggg,gg) y x s.Si2o Si / q 6. 51 5 i 5 *'2a ai esu.a. N uc.c2e.c' O= 1 ino e.2ia.37s e a x m,< % A x N e,2a.3,et-re1ii 7 o,333i

e. 2sa.2s.

33 Ii e,uec.go g e nse g g _ - eensc p J. w sp,y& k a.;:+ e, v. . -. - -... - - -.. -. - - - - ~ -. - - - - - - - -. - -

I ~ FME SoF5 i FULL PROFILE SETTLEMENT GAGE DATA

SUMMARY

l (~ TABLE No. 7 PIPELINE DESIGNATICN s-i=c-m i j NOTE: SEE FIGURE ki FOR LCCATION OF Pl.:EUNE AND REACCUT PC(NT H2-M \\ DISTANCE FROM i 3, p, y REA>>JT POINT NVERT ELE %TCN COMMENTS l Ruu (FT.) (FT.) a y g g g y,) l n m 1: l-n~79 10 / 20,0 627.73 & readine then at 10.b ft. -5,28 / l 24,67 627.68 } 40.0 627,42 l { 43 / 48.83 627.22 - //.Y / l 60.O 626.9'T 626.82 - E 2-70 / 70.o 80.O 626.SS I 90 / 90.0 626.97 - /Y.Y 100.O 627.24 i 110.0 627.42 h 12 0 / 20.0 627.72 - 8. Y / l 130,O 627.61 140.O M7. 76 150 / 150.0 627.87 .7, 6 i i i a 2 MIDLAND PLANT DIESEL GENERATCR BUILDNG I MIDLAND, MICHIGAN w () E GEON NGTRJ.'tENTATX"N'ENGENE35FG ,,.,--_m.,

-~-

m. _..

~ ME101 IN PUT CAR D IMAG ES T 1 11 21 31 41 51 61 71 i + + + + + + + + RUN LDCASE=THRM1, RUN LDCASE=WT1 HED TITLE =8-OHBC-81 MILLAND DSL GEN BLDG, PR OJ N0=7 22 0, US ER = 7 PRCBNC=1010, UNITS =2, CODE =L31S73, ANC -2.64 E=27.9E6,0D=8.625,THIK=0.32 LBS/FT=50.25, THERM =0.0, RA=0.9,RB=0.9,RC=0.9 20-10.0 RAD 20 1.0 D I S P=. - 5. 2 8 25-5.00 L 30 -5.0 40 -10.0 l 49 -9.0 RAD 49 1.0 DISP =-11.4 60 -11.0 70 -10. RAD 70 1.0 DISP =-16.2 80 -10. 90 -10. RAD 90 1.0 D.I S P = - 14. 4 100 -1.0. 110 -10. 120 -10. RAD 120 1.0 DISP =-5.4 130 -10. 140 -10. 150 -10. FAD 150 1.0 DISP =-3.6 END + + + + + + + + 31 CARDS IN INPUT DECK 31 CARDS IN LOAD CASE THRM1 31 CARDS IN LOAD CASE WT1 0 WARNINGS 0 ERRORS 0 FATAL ERRCRS PL 93. t ~ CRACH. S ~ (M *iiF101.ME1011 EiO11*** ME1011/FEh05 .~.- -}}