Docket No. 50-346 TULEDO EDISON Operating License No. NPF-3 g
.J.os Id vr Acgag p C.T..SE Serial No. 662 Oll,"*"
v arass m 2, November 10, 1980 y fgqy,zgg 11 Director of Nuclear Reactor Regulation Attention:
Mr. Robert W. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D. C.
20535
Dear Mr. Reid:
This is in reference to the License Condition 2.C.(3)(k) to license No.
NPF-3 as modified in Amendment No. 17 for operation of Davis-Besse Nuclear Power Station Unit No. 1.
The above condition, in part, requires the Toledo Edison Company to complete tests and obtain test results as required by the NRC to verify that faults on non-class IE circuits would not propagate to the class-IE circuits in the Reactor Protection System (RPS) and the Engineered Safety Features Actuation System.
These tests were to be completed and test results submitted within 60 days of startup following the first regularly scheduled refueling outage.
Toledo Edison has successfully completed the Engineered Safety Features Actuation System Noise Test Program and is forwarding 5 copies of each of the following fault testing reports:
Document No.
Title 1.
ER 7054 and all Addendums Analog and Digital Isolation Device Qualification 2.
ER 7055 and all.\\ddendums Safety Features Actuation System (SFAS) Isolation Qualification In summary, the SFAS was subjected to electrostatic and electromagnetic noise tests. The test program did not render SFAS unable to perform its protective functions within the specified limits.
In addition, the test program did not produce any spurious channel or system level protective action trips generated as a result of test stimuli.
)/
_S THIS DOCUMENT CONTAINS P0OR QUAtllY PAGES THE TCLEDO EDISCN COMPANY EDISON PLAZA 300 MACISCN AVENUE TCLEDO. CHIO 4G552 801117055l
[
. The additional requirement of the License Condition was previously satisfied by Toledo Edison's letter dated January 11, 1979 (Serial No.
470) which advised the NRC of successful completion of the NI/RPS Noise Test Program and forwarded the fault testing reports.
This letter along with our previous submittal satisfies the requirements of the License Condition 2.C.(3)(d.
Yours very truly, ffb R. P. Crouse Vice President Nuclear RPC:TKR 1