Forwards SE Denying Licensee 920617 Request for Amends to License Changing TS 3/4.6.1.7 & 4.6.1.2f for Plant
ML20062J847
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/10/1993
From: Carpenter C
Office of Nuclear Reactor Regulation
To: Mccoy C
GEORGIA POWER CO.
Shared Package
ML20062J848 List:
References
TAC-M82135, TAC-M82136, NUDOCS 9311180042
Download: ML20062J847 (3)


Text


-_

i pena

..,.; ?z

!E' UNITED STATES NUCLEAR REGULATORY COMMISSION

%g'WiE  %,r j

/ WASHINGTON, D.C. 20555 0001

.....+

November 10, 1993 '

Docket Nos. 50-424 and 50-425 Mr. C. K. McCoy Vice President - Nuclear Vogtle Project Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201

Dear Mr. McCoy:

SUBJECT:

DENIAL OF AMENDMENT REQUEST - V0GTLE ELECTRIC GENERATING PLANT, '

UNITS 1 AND 2 (TAC NOS. M82135 AND M82136)

By letter dated November 7, 1991, as revised June 17, 1992, you proposed  !

amendments to change Technical Specifications (TS) 3/4.6.1.7 and 4.6.I'.2f for Vogtle Electric Generating Plant (Vogtle), Units 1 and 2. The' proposed changes would have clarified the action statements and surveillance requirements for the containment purge supply and exhaust isolation valves, regarding testing of the valves in the reverse direction of flow.

L The NRC staff has reviewed the proposed changes and, as discussed in the enclosed Safety Evaluation, finds it unacceptable. We disagree with your contention that the purpose of the required quarterly surveillance tests is to identify excessive degradation of the valves' resilient seals. The staff believes that the purpose of the quarterly surveillance test is to verify the operability of the valve at a frequency that would detect i.ncipient gross failure, thus, allowing you to take action to prevent the failure. You have failed to demonstrate that the proposed testing of the valves in the reverse direction will provide equivalent or more conservative results as required by Section'III.C of Appendix J to 10 CFR Part 50. Your proposal to verify leak tightness in the reverse direction does not adequately address the concerns identified in Information Notice No. 88-73, " Direction Dependent Leak Characteristics of Containment Purge Valves."

Since your proposed amendments are not supported by sufficient technical

'information, your request for license amendments is denied. The staff's decision to deny these amendments was discussed with your staff on October 13, 1993.

A copy of the Notice of Denial of Amendments and Opportunity for Hearing to be published in the Federal Reaister is enclosed for your information.

NRC FR.E CBER COPY 180025 9311100042 931110 4 DR ADDCK 0500 }fOi , i

f

.t: l Mr. C. K. McCoy November 10, 1993 If you have any questions regarding this matter, please contact me at (301) ,

504-1465 l Sincerely, ORIGINAL SIGNED BY:

C. E. Carpenter, Jr., Acting Project Manager Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosures:

1. Safety Evaluation
2. Notice of Denial cc w/ enclosures:

See next page DISTRIBUTION:

Docket File NRC & Local PDRs PDII-3 R/F SVarga Glainas RHermann LBerry CECarpenter OCC, 15B18 DHagan, MNBB3206 ACRS (10), P-315 OPA, 2G5 OC/LFDCB, MNBB11104 EMerschoff, RII M. Snodderly, 8D1 l 0FC LA:PD23:DAPE5_ PM:PD23:DRPE OFM/// (A)D:P024:DRPE NAME LGBerry N CECarpenter , , J74hw RAHer DATE_

1 /&b/93 /0/ fB/93 ff/h/93 // / f /93 UFflCIA'L RECORD COPY Document Name: V0G82135. DEN

l l

i Hr. C. K. McCoy November 10, 1993 '

i If you have any questions regarding this matter, please contact me at (301) 504-1465 Sincerely, (0&

8 C. E. Carpenter r., Acti Project Manager -

Project Directorate II-3 Division of Reactor Projects - I/II 1 Office of Nuclear Reactor Regulation j

Enclosures:

1. Safety Evaluation
2. Notice of Denial cc w/ enclosures: 4 See next page i

I a

.. . l l

Mr. C. K. McCoy Georgia Power Company Vogtle Electric Generating Plant  ;

l 1

cc:

Mr. J. A. Bailey Harold Reheis, Director Manager - Licensing Department of Natural Resources  ;

Georgia Power Company 205 Butler Street, SE. Suite 1252 P. O. Box 1295 Atlanta, Georgia 30334 Birmingham, Alabama 35201  ;

Attorney General Mr. J. B. Beasley Law Department -

General Manager, Vogtle Electric 132 Judicial Building Generating Plant Atlanta, Georgia 30334 P. O. Box 1600 Waynesboro, Georgia 30830 Mr. Alan R. Herdt i Project Branch #3 '

Regional Administrator, Region II U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission 101 Marietta Street, NW. Suite 2900 101 Marietta Street, NW., Suite 2900 Atlanta, Georgia 30323 Atlanta, Georgia 30323 Mr. Dan H. Smith, Vice President Office of Planning and Budget Power Supply Operations l Room 615B Oglethorpe Power Corporation 270 Washington Street, SW. 2100 East Exchange Place Atlanta, Georgia 30334 Tucker, Georgia 30085-1349- .

Office of the County Commissioner Charles A. Patrizia, Esquire Burke County Commission Paul, Hastings, Janofsky & Walker Waynesboro, Georgia 30830 12th Floor 1050 Connecticut Avenue, NW.

Mr. J. D. Woodard Washington, DC 20036 Senior Vice President - .

Nuclear Operations Arthur H. Domby, Esquire Georgia Power Company Troutman Sanders  ;

P. O. Box 1295 NationsBank Plaza Birmingham, Alabama 35201 600 Peachtree Street, NE.

Suite 5200 Atlanta, Georgia 30308-2216 Resident Inspector U. S. Nuclear Regulatory Commission i P. O. Box 572 Waynesboro, Georgia 30830 j i

l

.