ML20062J754
| ML20062J754 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/04/1982 |
| From: | Roman T NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML20062J720 | List: |
| References | |
| NUDOCS 8208160455 | |
| Download: ML20062J754 (4) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _.
NIAGARA $10llAWKPOWERCORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE July 1982 The Station operated during the month of July 1982 with a monthly avail-ability factor of 0.0% and a net design electrical capacity factor of 0.0%.
The Station was shut down March 19, 1982, for a scheduled main-tenance outage. The Station remains shut down due to Reactor Recirculation system piping cracks found during Vessel liydro on March 23, 1982.
CLASS I WORK - MAINTENANCE - JULY 1982 WR #17863 - Replaced unloader valve - recharged with Freon and made all i
necessary adjustments to #11 Inst. Air Dryer - 7/16/82.
WR #17903 - Opened valve 53-08 found only problem was crud on seat and disk - cicaned and put back in service - 7/27/82.
CLASS I WORK - INSTRUMENTATION AND CONTROL - JULY 1982 WR #18126 - #11 CAS Sys. Sample Sol. Valves 201.7 checked for Icaks (Leak check - none found).
CLASS I WORK - ELECTRICAL - JULY 1982 MO #2151 - Mark I Containment - New Torus Temp. Monitoring N1-MST-M1 - 125 VDC Batteries, cells specific gravities G battery voltage WR #17405 - #11 Condensato Transfer Pump - replaced bearings.
1 Phg
t P
OPERATING DATA REPORT
\\
DOCKET NO.
50-220 DATE 8/4/82 COMPLETED BY T w unmnq y-TELEPilONE 315-313-211 1
OPER A TING ST *.TUS X1383 t
~
I. Unit Name:..Nine blile Point Unit #1 N08'5
- 2. Reporting Period:
07/01/82 to 07/31/82
{
- 3. Licensed Thennal Power (SIWt):
1850 640
- 4. Nameplate Ratin;(Gross 51We):
620
- 5. Design Electrical Rating (Net SlWe):
i
- 6..\\laximum Dependable Capacity (Gross MWe):
630
- 7. Stasimum Dependable Capacity (Net SIWE):
610 l
S. If Chan;es Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gise Reasons:
T
- 9. Power Level To Which Restricted. If Any (Net 51Weji
- 10. Reasons For Restrictions.lf Any:
This 5!onth Yr..to-Date Cumulatise
- 11. Ilours In Reportin; Per d 744.0 5087.0 111,743.0
- 12. Number Of Ifours Reactor Was Critical 0.0 1874.0 gl,.50s,3
- 13. Reactor Reserte Shutdou n lionrt 0.0 0.0 1.204.2
- 14. flours Generatur On.Line 0.0 1872.5 78,562.3
- 15. Unit Resene Shutdown lio::rs 0.0 0.0 20.4
- 16. Cross Therma! Energy Generated (51WII) 0 3,421,093 129,374,390 4
- 17. Gross Electrical Energy Gemated (N!Wil) 0 IS. Net Electri:21 Energy Generated pin H) 0 1,169,791 42,743,090 1,134,758 41,392,651
- 19. Unit Senice Iactor 0.0 36.8 70.3
- 20. Unit Asailab!!!:v E:::;r 0.0 36.8 70.3
[
- 21. Unit Capacity E:.m C>i;; MDC Net) 0.0 36.6 60.7
- 22. Unit Capacity Factor (U>in;: DER Net) 0.0 36.0 59.7 1
- 23. Unit Forced Outape Rate 100.0 62.2 11.3
- 24. Shutdowns Schedu!cd Oser Nest 6 Months IType. Date,as.d Duratiaa of Each1:
- 25. If Shut Down At End'Of Report Period. Estunated Date uf Startup:
March. 1983
- 26. Units in fest Status (Prior io Commercial Operation).
Forecast Achiesed INITIAL CRITICALITY
[
INITIA L ELECTI ! CIT Y COM11ERCI \\ L Ol'CRATION l
(oi;;l
+.e w--
--e
- ~,.,
AVER \\GE D AILY UNIT P0 heft I.EVEL c
0 DOCKET NO.
UNIT 9 bfile' Point #1 DATE R/4/82 CO\\lPLETED uy _ T.W. Roman rse TELEPilONE 315-353-2110 X1383 AIONTli July 1982 DAY AVERAGE DAILY POWER LEVEL, DAY AVERACE D AILY POWER LEVEL
(.\\lWe. Net )
(MWe. Net)
I O
17 0
2 n
iS 3
0 n
0 19 4
0 20 0
5 0
2I O
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
0 26 11 0
l 0
27 12 0
25 0
1 13 0
0 29 I4 0
30 0
IS 0
31 0
16 0
l INSTRUCTIONS i[>l
"" E""'#' 3#'#I "' M WC Net for e.seh day in tii. r ep.. :,,p in.,nig,, t,,,g,,,,g.,,,
t.e are t e 3 s.3 19177 I
l l
l
\\
(
[
O S0-220 UNITSilUTDOWNS AND POWER REDUC 110NS DOCKET NO.
UNIT NAhlE 9 blile Point el DATE 8/4/82
-j REPORT h10NT11 July 1982 COhiPLETED BY
_T.W. Roman )4 W u u j
TELEPilONE 315-343-2110 //
X1383 g.
Licen
~
No*
Date g
1 Cause & Correceive o
p 3.3 g
g ; a:
Event ET S3 Adion to 3 (5 l Report a v: O yO Psevens Recurrence o0 a:
6 8206 820323 F
744 A
4 82-009 Replacement of recire, piping continues, core off loaded to SFP.
TOTAL 3081 l
~.
l i
I
'2 3
4 F: Forced Reason:
hiethod:
Exhibit C instructions S: Scheduled A Equipment Fa'fui:(f xp'ain) 1.hlanual for Preparation of Data D htaintenan:e of T :t 2 hf anual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Resinietioa 4 Other (Explain) 0161)
E Operator Training & Lie <nse Examination F Administrative 5
G. Operational Error (F,pl.'in)
Pl/77)
Il Other (Explain)
Enibit I Same Source
.