Forwards IE Insp Repts 50-259/82-18,50-260/82-18 & 50-296/82-18 on 820626-0725.No Noncompliance Noted
ML20062J536
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 07/26/1982
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Parris H
Tennessee Valley Authority
Shared Package
ML20062J538 List:
References
NUDOCS 8208160395
Download: ML20062J536 (2)


See also: IR 05000259/1982018

Text

c- ,

a *

  • -

JUL 2 01982

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Strc Nwer II

Chattanooga, TN 37401

Gentlemen:

Subject: Report Nos.(1Q-259/8%)0-260/82-18, and 50-296/82-18

This refers to the routine safety inspection conducted by Mr. J. W. Chase of this

office on June 26 - July 25, 1982, of activities authorized by NRC Operating

License Nos. DPR-33, DPR-52, and DPR-68 for the Browns Ferry facility and to the

discussion of our findings held with Mr. G. T. Jones, Power Plant Superintendent,

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

l personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

One new unresolved item resulted from this inspection and is discussed in the

j enclosed report. This item will be examined during subsequent inspections.

i

'

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

!

David. M. Verrelli, Chief

Reactor Project Branch 1

Division of Project and

Resident Programs

Enclosure: (Seepage 2)

f408160395 820726

PDR ADOCK 05000259

G PDR [{g

. .

~

.

Tennessee Valley Authority 2

1982

Enclosure:

Inspection Report Nos. 50-259/82-18,

50-260/82-18, and 50-296/82-18

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. T. Jones, Plant Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Tennessee

l

l

l

1

l

RII RII RII RII

cv ycb q< p)

! J ase:drt YtButbher FCantrell DVerrelli

l 7/23/82 7/ 2V82 7/gj/82 7/J4/82

!

l