Monthly Operating Rept for Aug 1980
ML20062J092
Person / Time
Site: Rancho Seco
Issue date: 09/03/1980
From: Colombo R
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To:
Shared Package
ML20062J089 List:
References
NUDOCS 8009160297
Download: ML20062J092 (5)


Text

____

=.

~

l i

v C

C 50-312 C

UNIT SliUTDOWNS AND POWER RLDUCTIONS DOCKET NO. Id"C8'O beCu lio - l*

UNIT NAME H

60-06-31 DATE O

COMPLE'IED ny R. W.

Colombo O

REPORT MONTil August, 1980 TELFPilONE 916-457-321I Q

4 e.

.,.a E E a.

=

n c

Cause & Corrective

.E E E

-, 5 x La.cer.sce 5 -r,

. No.

Date g

g g

.3 E, S Event u?

$3 Action to l

$E 5

fe 5, j Report #

Eu

$U Prevent Recurrence H

v 3C l

7 80-08-12 F

472.2 A

3 N/A IIA TURBI N Damaged thrust bearing.

4 4

3 2

3 4

F: Forced Reaum:

Method:

Exhibit G-Instructions S: Scheduled A 1:quirment Failure (Explain)

I-Manual for Preparation of Data ll Mainterance of Test

2. Manual Scram.

Entry Sheets for Licensee C Itefacting 3 Automatic Scram.

Event Report (LER) File (NUREG-r D. Iter,ulatory !!cstriction 4-Other (Explain) 0161) 1: Opesator Tsaining& Licensc Examination F Administrative 5

G Operational Ertur (Explain)

Exhibit ! - Same Souree (9/77)

Il OLher (Explain)

e 9

d VITUEll::G 1:iOT2%T10:: REGl.*:ST Rancho Seco Unft 1 1.

1:ane of racility:

2.

Scheduled ds:c for next refueling shutdown:

April, 1981

+

June, 1981 i

3.

Scheduled date for restart follcuing refueling:

4: Technical Specification change or other if cense anendnent required:

a) Change to Rod Index vs. Power Level Curve (TS 3.5.2) b) Chcage to Core Inbalance vs. Pouer Level Curve (TS 3.5.2)

. c) Til Limits (TS 3.5.2) d) Safety Equip cat Testing (TS 3.3.3) 5.

ScheduIcd date(s) for submitting proposed ' licensing action:

May, 1981

h. I:pertent licensing consideratione. associated with refuel'ing:

None 7.

runber of fuel assemblies:

a) In the core:

177 b) In the Spent Fuel Fool:

f64 D.

Present licensed spent' fuel capneity:

579 9.

frojected date of the last refueling the: can be discharged 1987 to the Spent Fuel Pool:

t r

l l

I l

l D

4 l

o

i I

l l

OPERATING DATA REPORT DCCKET NO.

50-312 DATE 80-08-31 COS!PLETED I;y R. W.

Colonbo l

TELEPl!ONE 916-452-3211 OPERATING ST ATUS Notes l

1. Unit Name:

Rancho Seco Uni + 1

2. Repertin; Period:

August. 1900 l

3. Licensed Thermal Power 13tht):

2772 l

'4. Nameplate Ratin;iGross.'.1Wer W

5. Desi;n Eie:trical Ratin: INet 31Wei:
6. Staximum Depend b:e Cyacity(Gross 31We):

9I7

7. S!s.si :um DependaL!e Capacity (Net 31We):

073 S. If Chan;es Occur in Capaci:y Ratings 4 Items Number 3 Throu;h 7) Sin:e Last Report. Gise Reasons:

N/A N/A

9. Power Level To khi:h Restricted. If Any (Net.\\1We):

10.' Reasons For Restri:tions. If Any:

N/A This $1onth Yr..to.Dat:

Cumulative

11. Ilours In Reportin; Period 744 5,855 47,112
12. Number Of ifours Rea: tor Was Criticar 290.5 2,548.5 28,622.0
13. Reactor Res:ne Shutdown Hours 0

0 3,975.I

11. Hours Generator Galine 271.8 2,445.4 27,386.7 IS, Unit Rewne Shutdown Hours 0

0 1,210.2 i

16. Gross 1hermal Ener;y Generated tilWH) 734,668 6,25I,304 69,315,002
17. Croi> El e:rieal Energ3 Generated 13thili 243,168 2,096,300 23,380,836
18. Net Electrical Energy Generated.\\lh H,,

226,II2 1,973,910 22,084,799 t

j

19. Unit Senice Factor 36.5 41.8 58,1
20. Unit Asailabifi:y Factor 36.5 41.8 60.7 I-
21. Unit Cg.i.1t> Factor (Udn; 3!CC Net) 34.0 36.o 53,7
22. Unit Cy:.it3 Factor 1U3i::; DER Neti 13.I
23. Unit Forad Ourage R:te 63.5 ___

16.7 q;,t 18.4 31.0

24. Shutdown > Seheduled Oser Nest o Slonths IT> re. Date.and Durat' n of Each):

NA S

25. If Shut Dawn At End Of Repart Period.Esthasted Date of St.trtup:
26. Unif > In Tot Status iPrior o Commerei:1 Opiration):

Forecast Achies ed INITI \\ L CRil!CA LITY N/A N/A INITIil rt !rTRICITY CO31%Iti:CIAL OrrR \\ riaN 10/77)

4 O

AVERAGE DAILY UNIT POWER LEVEL 0-312 DOCKET NO.

UNIT R.P.Lncho Seco Uni t Onc i DATE 80-08-31 CO\\lPLETED IlY TELEPliONE 916-452-3211 510NT11 Aoaust, 1980 t

DAY AVERAGE D. IL '

ER LEVEL DAY AVERAGE DAILY POWER LEVEL (SIWE. Net)

I 854 o

17 861 2

o 18 866 3

o 19 4

866 o

,9 S

863 0

21 6

867 0

864 7

0 33

~

866 i

24 865 0

9 25 s

869 l

30 26 0

868 II 27 0

12 255 0

1 28 13 0

0 0

14 0

30 IS 0,

33 16 0

i i

INSTRUCTIONS On this format.hst the aserage daily unit power leselin alwe Nc: for each da.s in ille reporting nionth. C i

the nearest whole nepwart.

r i

i (9/77 )

e e

NARRATIVE

SUMMARY

OF PLANT OPERATION 8-1 to Reactor ? 96%

8-12 8-12 0748 Reactor trip (inverter mal function) 1855 Reactor critical 2350 Turbine-Genera tor trip (excessive thrust bearing displacement) 8-13 0957 Began reducing Rx power to 5%

1125 Began cold shutdown 1339 Tripped Rx 8-13 to Plant in cold shutdown 8-31 Summary of Changes Made in Accordance wi th 10 CFR 50.59(b) 1.

Installed fence around tank farm and installed ballistic doors on control room.

2.

Changed Rancho Seco Emergency Plan.

3 Changed RPS high pressure setpoint.

Personnel Chances Recuiring Reporting Mr. Villis Ford resigned as Operations Supervisor. He is replaced by Mr. Do'nald Blachly effective 9-3-80.

Mr. Blachly is a Senior Licensed Operator and a registered mechanical engineer.

Major items of Safety-Related itaintenance 1.

Conducted continuity tests to diesel generator voltage regulator control switch per IE Bulletin 80-20.

2.

Installed new seal on pressurizer spray bypass.

3 Tightened studs on bonnet of leaking pressurl:er spray valve.

4.

Replaced "D" RPS flow transmitter.