Jump to navigation Jump to search
Forwards IE Insp Rept 50-321/82-21 on 820708-09.No Noncompliance Noted
ML20062J077
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/19/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20062J082 List:
References
TAC-48771, NUDOCS 8208160257
Download: ML20062J077 (2)


See also: IR 05000321/1982021

Text

'

'

{

ri

e

..

b

July 19, 1982

Georgia Power Company

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

Subject: Report No. 50-321/82-21

This refers to the special safety inspection conducted y Mr. F. Jape of this

office on July 8-9,

1982, of activities authorized by NRC Operating License

No. DPR-57 for the E. I.

Hatch Nuclear Plant Unit 1 facility and to the

discussion of our findings held with Mr. H. Nix, Plant Manager at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

(Orginal signed by H. C. Dance)

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure (See Page 2)

M 8208160257 820719

PDR ADOCK 05000321

Q

PDR

_

gg(

,

,

Georgia Power Company

2

July 19, 1982

Enclosure:

Inspection Report No. 50-321/82-21

cc w/ enc 1:

J. T. Beckham, Vice President and

General Manager-Nuclear Generation

H. C. Nix, Plant Managcr

C. E. Belflower, Site QA Supervisor

.

bec w/ encl:

Document Management Branch

State of Georgia

NRC Resident Inspector

Hugh S. Jordan, Executive Secretary

i

!

l

l

RII

RII

RII

RII

FJape$r

7

/^

@h

d

ARHerdt

JFRogge

HCDance

7/y82

7/f/82

7/q/82

7/,cg/82