Text
'
'
{
ri
e
..
b
July 19, 1982
Georgia Power Company
ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
Subject: Report No. 50-321/82-21
This refers to the special safety inspection conducted y Mr. F. Jape of this
office on July 8-9,
1982, of activities authorized by NRC Operating License
No. DPR-57 for the E. I.
Hatch Nuclear Plant Unit 1 facility and to the
discussion of our findings held with Mr. H. Nix, Plant Manager at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
(Orginal signed by H. C. Dance)
H. C. Dance, Chief
Reactor Projects Branch 2
Division of Project and
Resident Programs
Enclosure (See Page 2)
M 8208160257 820719
PDR ADOCK 05000321
Q
_
gg(
,
,
Georgia Power Company
2
July 19, 1982
Enclosure:
Inspection Report No. 50-321/82-21
cc w/ enc 1:
J. T. Beckham, Vice President and
General Manager-Nuclear Generation
H. C. Nix, Plant Managcr
C. E. Belflower, Site QA Supervisor
.
bec w/ encl:
Document Management Branch
State of Georgia
NRC Resident Inspector
Hugh S. Jordan, Executive Secretary
i
!
l
l
RII
RII
RII
RII
FJape$r
7
/^
@h
d
ARHerdt
JFRogge
HCDance
7/y82
7/f/82
7/q/82
7/,cg/82