ML20062H950

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-335/82-19 & 50-389/82-25 on 820614-18.No Noncompliance Noted
ML20062H950
Person / Time
Site: Saint Lucie  
Issue date: 07/16/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20062H953 List:
References
NUDOCS 8208160220
Download: ML20062H950 (2)


See also: IR 05000335/1982019

Text

'

.

.

DL6

1

-

.

July 16, 1982

Florida Power and Light Company

ATTN: Dr. R. E. Uhrig, Vice President

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

Gentlemen:

Subject: Report Nos.h82 19 apd 50-389/82-25

This refers to the routine safety inspection conducted by Mr. R. W. Wright of

this office on June 14-18, 1982, of activities authorized by NRC License

No. DPR-67 and NRC Construction Permit No. CPPR-144 tor the St. Lucie facility

and to the discussion of our findings held with Mr. B. J. Escue, Plant Manager,

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

\\

( Orginal signed by C. Julian)

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

See Page 2

I

pw.*

B200160220 020716

gDRADOCK05000g

m

-

e

~

July 16, 1982

-

2

Enclosute:

Inspection Report Nos.

50-335/82-19 and 50-389/82-25

cc w/ encl:

C. M. Wethy, Plant Manager

N. Weems, Assistant QA

Construction Manager

B. J. Escue, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Florida

,

RII

RII

)

RII

lri

msu

RIl$k.

u-

pc

right:aw

" 'CMUpright

ARHerdt

KLandi

HCDance

07, /82

07

/82

07/p/82

07/l$/82

07/w /82