Forwards IE Insp Rept 50-397/82-14 on 820607-0709 & Notice of Violation
ML20062H650
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/02/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20062H653 List:
References
NUDOCS 8208160124
Download: ML20062H650 (2)


See also: IR 05000397/1982014

Text

r

, , fy- -

p (? y-

.

AUG 2 El

bocket 14o. 50-397

Washington Public Power Supply System

r. O. Lox 968

Richland, Washington 99352

Attention: Dr. R. G. Matlock

Program Director

Gentlemen:

Subject: LRC Inspection

1his refers to the inspection conducted by 11sars. A. D. Toth and

R. A. Feil of this office during the period of June 7 - July 9,1982,

of activities authorized by hkC Construction Permit ho. CPPR-93, and

to the discussion of findings held by Mr. Toth and Mr. Feil with

Dr. Matlock and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

l'ased on the results of this inspection, it appears that certain of

your activities were not conducted in full compliance with ERC

requirements, as set forth in the hotice of Violation, enclosed

herewith as Appendix A.

Your response to this notice is to be submitted in accordance with

the provisions of 10 CFR 2.201 as stated in Appendix A, Notice of

Violation. In your response, also state (1) the measures being taken

to effect prompt corrective action (s) once conditions adverse to

quality have been identified and (2) how you plan to assure that

your contractor (s) implement prompt corrective action (s) .

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosures will be placed in the NRC Public Document Room unless

you notify this office, by telephone, within ten days of the date

of this letter and submit written application to withold information

contained therein within thirty days of the date of this letter.

Such application must be consistent with the requirements of

2. 790 (b) (1) . 820s160124 820so2

PDR ADOCK 05000397

G PDR

[ ' hf

' " " > . . M.:.e p R.

W,... ......

6

,, ,

CU?NAME) . . A. . T.

. . . ... R. . F. . e. . t. odd.s ,

T,. B,isho.P., .....f . ,, ,,, ,

. 81..L.)B2,. Bj,Lj,g2,,,, 8),,2-f, B 2, ,gj,Q,g,7,,, f, , , ,,

!NRC FORM 318 410 80) NRC M O2 40 OFFICIAL RECORD COP'Y ~ u" +32**;

r

aHG  ? 1987~

(lashington Public l'ower Supply System -2-

.

Snould you have any questions concerning this inspection, we will

be glad to discuss them with you.

'lhe responses directed by this letter and the accompanying Notice

are not subject to the clearance procedures of the Office of Manage-

nent and budget no required by the Paperwork heduction Act of 1980,

FL 96-511.

Sincerely,

T. U. Dishop, Chief

Reactor Construction Projects branch

Lnclosures:

A. Notice of Violation

B. Id;C Inspection heport

ho. 50-397/82-14

cc w/o enclosures:

R. B. Glasscock, Quality Assurance Director

bec: Of1B/ Document Control Desk (RIDS)

Distributed by RV:

State of WA (Lewis)

Resident Inspector (2)