Forwards IE Insp Rept 50-409/81-23 on 811222-820331 & Notice of Violation
ML20062H628
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 07/27/1982
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20062H632 List:
References
RTR-NUREG-0660, RTR-NUREG-0737, RTR-NUREG-660, RTR-NUREG-737 NUDOCS 8208160119
Download: ML20062H628 (3)


See also: IR 05000409/1981023

Text

.

.

JUL 27.1982

Docket No. 50-409

Dairyland Power Cooperative

ATTN:

Mr. F. W. Linder

General Manager

2615 East Avenue - South

La Crosse, WI 54601

Gentlemen:

This refers to the routine safety inspection conducted by Mr. M. W. Branch

and others of this office on December 22, 1981 through March 31, 1982, of

activities at Lacrosse Boiling Water Reactor authorized by NRC Operating

License No. DPR-45 and to the discussion of our findings with Mr. R. Shimshak

at the conclusion of the inspection. The items of noncompliance were also

the subject of an enforcement conference (Enforcement Conference Report

No. 50-409/82-03) conducted in our office with Mr. Taylor and others of your

staff on February 11, 1982.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in noncom-

pliance with NRC requirements, as specified in the enclosed Appendix. A

written response is required. The fact that we took escalated enforcement

action in the form of an enforcement conference serves to emphasize the

significance we attach to these noncompliances. Our concern is heightened

because, in our view, Itcr. 1 and 2 have the same basic underlying causal

factor; namely, failure to follow procedures. These items were among the

information upon which Mr. DeYoung in his May 18, 1982, letter to you

based the statement regarding your poor record of adherence to procedures.

We reviewed the matters closely before deciding not to take additional

escalated enforcement action and you should be aware that future recurrence

of similar noncompliances will likely result in escalated enforcement action.

We believe you appreciate our concern about the quality of operations at

8208160119 820727

PDR ADOCK 05000409

G

PDR

.ZEO /

.

.

Dairyland Power Cooperative-

2

LACBWR as evidenced by the commitment you made in our April 1,1982, meeting

(Management Meeting Report No. 50-409/82-04) to develop by July 1, 1982, a

formal regulatory improvement program.

With respect to Item 2 which relates to the mode of operation of diverting

full reactor steam flow through the main steam bypass valve during power

operation, we understand you have administrative 1y prohibited that mode of

operation. We also understand that the prohibition does not prevent the

valve from being used as described in the FSAR for diversion of steam

during startups and shutdowns and for automatically controlling reactor

pressure oscillations during power operation.

It is our position that

you must submit a request to and have it approved by NRR prior to any

future use of the valve similar to the manner in which you used it on

March 16, 1981.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

>

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If wo do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

!

i

4

i

!

b

.

.

Dairyland Power Cooperative

3

The responses directed by this letter (and the accompanying Notice) are

not subject to the clearance procedures of the Office of Management and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

original signed by

A. Sort Davis

.

James G. Keppler

Regional Administrator

Enclosures:

,

1.

Appendix, Notice

of Violation

2.

Inspection Report

J

No. 50-409/81-23(DPRP)

cc w/encls:

R. E. Shimshak, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

'

Boiler Section

Stanley York, Chairman

!

Public Service Commission

j

f

RIII

RIII

RI

RIII

RI I

RI I

-

%%b 3v

O

-\\).)M

<

1

Branch /so

Streeter

Sp q @p

.ar

Warni

Davis

eppler

/26/82

"I/E/8Z

gg

y/g4

,