Forwards Insp Rept 50-206/90-11 on 900913-28.No Violations Noted
ML20062H372
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/08/1990
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20062H375 List:
References
NUDOCS 9012040278
Download: ML20062H372 (3)


See also: IR 05000206/1990011

Text

-

_

e-

o

e

..

,.

i,[,paeog%

UNITED ST ATEs

[

'g

NUCLEAR REGULATOMY COMMISSION

REGON V

g

-l

1460 MARIA LANE, SUITE 210

f

WALNUT CREEK CALIFORNIA 94596

%g . . . . * ,e

NOV - B 1990

Docket No.

50-206

Southern California Edison Company

Irvine Operations Center

23 Parker Street

Irvine, California 92718

Attention: Mr. Harold B. Ray, Vice President

Nuclear Engineering, Safety and Licensing

Gentlemen:

SUBJECT: EMERGENCY OPERATING INSTRUCTIONS INSPECTION AT SAN ONOFRE

NUCLEAR GENERATING STATION UNIT 1

This letter forwards the results and conclusions of a special team inspection

conducted by the NRC of activities authorized by NRC Operating License No'.

DPR-13 for San Onofre Unit 1.

This inspection was conducted on September 13

1990 through September 28, 1990. At the conclusion of the inspection, the

findings were discussed with Mr. H. E. Morgan and other members of your staff

-

identified in the enclosed inspection report.

,

The purpose of this inspection was to verify that your Emergency Operating

Instructions.(E01s) are technically correct; that the specified actions can

be accomplished using existing equipment, controls, and instrumentation; and

that the available procedures provide the operators with an effective tool to

t

manage and mitigate potential accidents. The areas examined during the

inspection are identified in the attached inspection report. The inspection

g

consisted of a selective examination of procedures, procedure walk-throughs in

the plant with operations personnel, and interviews with a broad selection of

j

your operations, procedure writing, and training staffs.

Through direct observation of selected procedures during plant walk-throughs we

have concluded that your operating staff can effectively use the E0!s to manage

,

and mitigate serious operational events, and that the E0!s are, for the most

part, technically correct.

However, the inspection identified numerous deficiencies in the E01s, and

areas where the verification and validation of the E01s was not complete.

These specific items are described in the enclosed inspection report for your

staff to review and correct, as appropriate. These items are based on a

relatively small sample of your E01s. Consequently, as you develop a

corrective _ action plan, we expect that your staff will expand upon this

list both qualitatively and quantitatively. General areas that need to be

specifically addressed include improving the verification and validation

program, and the writer's guide.

,

,

9012040270 901100

- _ .

ADOCK 050

6

gDR

. -

.

.

.

O

-

,

,

NOV - 81990

A comitment was solicited and agreed to by your staff to provide notification

of the Resident Inspectors if a significant change to an E01 setpoint occurred

as a result of an on-going review of instrument loop inaccuracies.

It was

observed during the Exit Meeting that any change to the E01s from this review

'

may result in a significant change to the procedures, and thereby warrant

further NRC review.

We request that you r: ovide to us, within 30 days of the receipt of this

letter, a corrective action plan that addresses the deficiencies identified in

the enclosed inspection report and attachment as well as your assessment into

why the deficiencies noted were not identified as part of your verification

and validation program.

No violations of NRC requirements were identified within the scope of this

inspection.

,

.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

1

t

will be placed in the NRC Public Document Room,

r

The response requested by this letter and its enclosures is not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

l

?

l

[

discuss them with you.

[

Sincerely,

j

) [

R. P

immerman, Director

Division of Reactor Safety and Projects

l

l

.

)

Enclosures:

1.

Inspection Report 50-206/90-11

1

2.

Attachment A to Report 50-206/90-11

cc w/ enclosures (1) and (2)

D. J. Fogarty, Executive Vice President

H. E. Morgan, Vice President and Site Manager

R. L. Krieger Jr., Station Manager

State of CA

.

.

. .

-

__ ._ .

. _ . .

,_

,

7.

,

'

[is

,!

i

1

j

. a -

,

3

.

,

,

>

e

y

. .

,

-

. . .

,

i

,

.

-

t. ,

,

,

-

,

.

'

,

.

3

r

NOV - 8 1990

,

becw/ enclosures (1)and(2):

J. i4artin, RV

G. ,'. Johns ton , ' RV

P. Johnson,'RV

K. Perkins, RV

- R. Zimmerman, RV

S. Richards, RV

L. Miller, RV.

I

L?.Kokajko, NRR .

' Resident: Inspector

]

Project Inspector

l

in

M.. Smith, RV

,

J. Zollicoffer, RV

Docket < File

,

>

4

i

l'

V

,

,

>

y

,

s

'

U

RV/j k-:

e

REQUEST COPY

REQUEST K Y

REQUEST RPY

E"REQUESTCOPY)

,

'

'

YES ' / NO

YES / NO

) YES / NO)

'YES /-(NO)

i

<

[

'JOHNSTON

'LMILLER

KIRSCH

ZIMMERMAN n

-

'

/

1

- 11h./90s.E '

11/ ~/90'

.11/h/90?

.

,

'11/8/90

TO

R

-

'

.

. V

.

.

,

.k

+

,

- '

,

~,

, , .

,

f

'kd

g

l

t

s

,

'

k-

.(.

'

..

)

-

"!

(. ,'e

'

t, .

1

-

1

1

"

'

pg.

-

, ,

)l

) . ,

p

~}

5

i,

. !, -

y #.

-

$*

'

e.

1-..

i

.,

,

q,

y

<

<

$

'

1

'

  • -
j'

,

L

,

f

7

-,-

,

?

,4,

y

'

f

4

g .

4

'

'

.

_

_.

..

_

,.