ML20062H142

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/82-31 on 820609-18.No Noncompliance Noted
ML20062H142
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 07/28/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20062H143 List:
References
NUDOCS 8208130320
Download: ML20062H142 (2)


See also: IR 05000373/1982031

Text

, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_

_.

_

__

. _ - _ _ _ _ _ _ _ _ _ .

_ _ , _ - _

- _ _ _ _ _ _

. _ _

_ _ _ _

_ _ _ _ _ _ _ _ - -

s

..

'

.

e

'

-

. i

s

s

s

,

.

JUL 2 81982

.:

4

Docket No. 50-373

'

'

Commonwealth Edison Company

,,

ATTN:

Mr. Cordell Reed

,

Vice President

('

Post Office Box 767

'

'

,

Chicago, IL 60690

'

,

Gentlemen:

This refers to the special safety inspection conducted by Mr. I. T. Yin

of this office on June 9-10, and 18, 1982, at Teledyne Engineering Services,

.-

and June 15-16, 1982, at Sargent and Lundy Engineers, of activities at ' '

LaSalle County Station, Unit 1, authorized by NRC Construction Permit

No. CPPR-99 and to the discussion of our findings with Mr. B. R. Shelton

of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas' examined during

~

the inspection. Within these areas, the inspection consisted of.a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

,

o

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any.information

that you (or your contractors) believe to be exempt fzem disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this _ office by tele-

phone within ten (10) days from the date of this letter of-youraintentien

to file a request for withholding; and (b) submit within twenty-five 125)

days from the date of this letter a written application to this~ office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

>

.- .

3

DOhK o5hhohf3

8

'

PDR

l { ll

~~

c

.

~

4s.

n.

..

r,

r,

f-

'%

+

- -

.'f

r.

J .

./_,:

F_

v.

, ,

,

!.'

~.

'

.j W dVCoeuconwealthEdisonCcepany

2

. . JUL 2 8 M

~

'

- - 3

s:

-

' }.O ,'j

'

,

.

..

1

.' ; , 3, ',

'

2

w.

.

s

which identifies the document or pait'sodghts to be withheld, fand which

contdins a full statement.it hheirdsoitd whid. cme the bases'for the

? claim that the information's'hbdid %withheldi'from pubitc disclosure.

2 Th'is section further requires tha stateme'nt I.o cddress Jith. sp' cificity

\\

e

. I the corisiderations listed in 10 CFR 2.790(h)(f.)'. The )1i2folrmat' ion sought

'

to be withheld shall;be' incorporated as' farfas'possible into a separate

,

'

,

, Spart of the affidavit.' If we.do not hear frolyou da this regard within

/1 the ;specified periods noted ab' ova, a copy'of' this letter 'and the enclosed

l/ in'spection report will be placed in the Public Docdment Room.

lffy

{.

i

o

O>

LWe Nill' gladly discuss -any ques'tions you, have coricerni'ig' this inspection.

s

.

4

.

~

,

.

y

s'

Si'ncerely, e

h'

W.S.) Lit'tle, Chief

.

E

/ Enginee' ring Inspection Branch

.

/

.g

.

'

Enclosure:

Inspection

/ ll /

/ y')

Report No. 50-373/82 31(DETP)

"[

>N.

,

i /

cc w/ enc 1:

,

'

Louis 0. De1 George,_ Director

,

of Nuclear Licensing

,

3

R. Cosaro, Site Construction

-

Superintendent

i

' ' ,

T. E. Quaka, Quality ;

[.

Assurance Supervisor

.

'

R. H. Holyoak, Station

-

',43

_ Superintendent.

- '

P. B Stephenson, Project Manager

)

DMB/ Document Control Desk- 4HIDS)_.

'

,

'I.,

Resident Inspector, RIII-

,,

.

Karen Borgstadt, Office of ,

-

Assistant. Attorney Gerleral

= Dan Bement, FEMA, RV

.

.

-,'

,

x

RIII~ J/

RI I

RIII

U RII' - l

'/8

hrelus.

C~4

'

~

" Tin /j

an

n

Litt e

N

7/3/

7 7)f v

(

d

~idhd

u

.ggp