ML20062H120

From kanterella
Jump to navigation Jump to search
Forwards Notification of NRC Evaluation of New Info Re Flow Blockage Model for ECCS to Determine Design Conformance
ML20062H120
Person / Time
Site: 05000471
Issue date: 04/02/1979
From: Beverly Smith
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Callihan A, Cole R, Luton E
Atomic Safety and Licensing Board Panel, UNION CARBIDE CORP.
References
NUDOCS 7905070131
Download: ML20062H120 (1)


Text

.. -

e.

9

. fL....

M

(*

4 UNITED STATES

['r

'S NUCLEAR REGULATORY COMMisslON

[,

WASHINGTON, D. C. 20555 2

?

/

Apyil 2,1979 NP.C PIIDLIC DCCJMENT ROOM Edward Luton..Esq.

Dr. A. Dixon Callihan-Atomic Safety and Licensing Board Union Carbide Corporation U.S. Nuclear Regulatory Commission P. O. Box Y Washington, D.C.

20555 Oak Ridge, Tennessee 37830 Dr. Richard F. Cole

, e -;;

' ' % ' < g' " y,'s Atomic Safety and Licensing Board

-~

U.S. Nuclear Regulatory Commission i

Washington, D.C.

20555 4

. ei-i In the Matter of BOSTON EDISON C0ff ', E AL.

~

(Pilgrim Nuclear Generat ng Stat'i n, Unit 2)

Docket No. 50-471 Gentlemen:

This letter is to notify you that the Staff is evaluating new infonnation relating to Combustion Engineering's flow blockage model for the Pilgrim Unit 2 Emergency Core Cooling System (ECCS). This model is being reviewed to determine Pilgrim Unit 2's ECCS design conformance to the requirements of Appendix K and 10 CFR 550.46. I will forward to you the Staff's evaluation of this information when it is ccmpleted.

Sincerely,

.hq f L

Barry H. Smitn Counsel for NRC Staff cc: See Pilgrim Service List 7905070/3i.

G

.