Monthly Operating Rept for Jul 1982
ML20062H029
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/03/1982
From: Peterson D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20062H023 List:
References
NUDOCS 8208130273
Download: ML20062H029 (4)


Text

s OPERATING DATA REPORT DOCKET NO.

50-255 2,

DATE 8/3/82 C051PLETED BY DAPeterson TELEPHONE 616 76h_8913

- OPERATING STATUS

1. Unit Name:

Palisades Notes

2. Reporting Period:

820701 - 820731

.g

3. Licensed Thermal Power (51Wt):

2510

4. Nameplate Rating (Gross 51We):

811 7

5. Design Electrical Rating (Net 31We): 805
6. Stasimum Dependable Capacity (Gross SIWE):
  • 675
  • 635
7. 51admum Dependable Capacity (Net 51We):

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

1 6

9. Power Lesel To Which Restricted.lf Any(Net 51We):
10. Reasons For Restrictions.If Any:

i j

fi

,k This 51onth Yr.-to Date Cumulatise

11. Hours In Reporting Period Thh 5087 03.062 9'
12. Number Of Hours Reactor Was Critical 257 7 2359 3 51_,_082.5 if
13. Reactor Resene Shutdown Hours
14. Hours Generator On-Line 257.7 1971.3 h8.17s.7

~

,15. Unit Reserve Shutdown Hours

16. Gross Thermal Energy Generated (31WH) 581.Shh h,356,7hh 95,764,008
17. Gross Electrical Energy Generated (51WH) 179,370

___1,360,730

_ 29.,188.680

18. Net Electrical Energy Generated (51WH) 169,215 1.278.710 97.701.6ha 34.6 98.8 51.8 j

' 19. Unit Senice Factor 34.6 38.8 si.8

[

20. Unit Availability Factor t
21. Unit Capacity Factor (Using 31DC Net) '

95.8 39.6 h7.0

j. -
22. Unit Capacity Factor (Using DER Net) 28.2 31.2 37.1
23. Unit Forced Outage Rate 65.h 61.2 35.1

~

24. Shutdowns Scheduled Oser Next 6 Slonths (ifpe.Date,and Duration of Each1:

a

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

8/12/82

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICA LITY INITI A L ELECTRICITY Coil %1ERCIAL OPERATION 1-

  • u ~ aa nn c'onAanner Backpressure (9/77) 8208130273 820809 PDR ADDCK 05000255 g.

.R PDR

~*

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO.

50-255 UNIT Palise. des 0/b/02 DATE COMPLETED BY DAPetierson TELEPHONE 616 764 8913 MONTil Julv DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 1 758 17 749 2

.18 3~

747 19 745 4

20 5

739 21 695 6

22 1

7 712 23 730 3

24 7142 9

25 2II 10 26 11 157 27 12 28 13 29 14 30 15 31 16 i

INSTRUCTIONS On this format. fist the aserage dail "i' P ### l#*#II" MWe-Net for each day in tiic reporting month. Compute to the nearest whole mecawatt-(9/77)

.=

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-255

= UNIT NAME _

Palisades DATE 6-5-62 REPORT MONTil July 1982 COMPLETED By DVanDenBerg TELEPilONE 616 764-8013 r.

E E

.!E 2 2"d

~ Licensee

,E +

{"3 3

Cause A Corrective No.

Date g

3g i

jg5 Event u7 e-Action to

$E 3g=

Report sr r$ u gu Prevent Recurrence H

g o

e O

12 820710 F.

h86.3 A

2 Cooling Tower Pump Bearing Failure v

1 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A lk:nipment Failure (Explain) 1 Manual for Preparation of Data 11 Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C. Refueling 3-Automatic Scram.

Event Report (LERI File INUlti.G-D-Regulatory Restriction 4-Other (Explain) 01611 li Operaior Training & l.icense Examination F-Administrative 5

G-Operational Errier (Explain)

Esinbit I Same Source 01/77)

Il Other (Explain)

2LMfARY OF OPERATING EXPERIENCE FOR THE MONTH OF JULY 1982 The Plant operated at essentially 100% power until July 10 when power was reduced to repair P-39A Cooling Tower Pump. The unit was manually tripped off line on July 11 at 1720 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.5446e-4 months <br /> from h3% power when P-39B Cooling Tower Pump displayed signs of distress. Repairs to the pumps continued through the end of the month.

,