Monthly Operating Rept for June 1982
ML20062G123
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/09/1982
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML20062G115 List:
References
NUDOCS 8208120247
Download: ML20062G123 (6)


Text

.

. OPERATING DATA REPORP DOCKET NO.

50-244 DATE July 9, 1982 CCMPIEIED BY h E. 44 W - -. ~

Andrew E. McNamata TELEPHONE 1 (315) 524-4446 OPERATING STA'IUS Ext. 293 or 501 at Ginna.

1. Unit Name: GI1WA STATIN, UNIT #1 Notes: h e unit reactor power level
2. Reporting Period: June, 1982 was maintained at approximately 100%
3. Licensed %ermal Power (MWt):

1520 level during the report month.

4. Nameplate Rating (Gross MWe):

490 Exceptions to this are detailed on

5. Design Electrical Rating (Net MWe): 470 page 4.
6. Maximum Dependable Capacity (Gross PWe): 490
7. Maximum Dependable Capacity (Net MWe):

470

8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level to tich Restricted, If Any (Net PWe):
10. Reasons For Restrictions, If Any:

his Penth Yr.-to-Date Ctmulative

11. Hours In Reporting Period 720 4,343.00 110,399.00 l
12. Number of Hours Reactor Was Critical 720 1,470.00 83,112.62 1
13. Reactor Reserve Shutdown Hours 0

0 1,631.32*

14. Hours Generator On-Line 720 1,401.00 81,228.63 l
15. Unit Reserve Shutdown Hours 0

0 8.5

  • 1
16. Gross hermal Energy Generated (MWH) 1,078,152 2,047,056 110,952,610
17. Gross Electrical Energy Generated (MWH) 361,208 677,021 36,111,986
18. Net Electrical Energy Generated (MWH) 343,936 643,783 34,221,856
19. Unit Service Factor 100%

32.26%

73.58%

20. Unit Availability Factor 100%

32.26%

73.56%

~

21. Unit Capacity Factor (Using POC Net) 101.63%

37.81%

68.39%

l

22. Unit Capacity Factor (Using DER Net) 101.63%

37.81%

68.39%

l

23. Unit Forced Outage Rate 0%

32.11%

8.92%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Steam Generator Inspection - 9/25/82. Duration - 3 weeks.

l

25. If Shutdown At End Of Beport Period, Estimated Date Of Startup:

l

26. Units In Test Status (Prior to Ca mercial Operation):

Forecast Achieved INITIAL CitITICALITY INITIAL ELECTRICITY COMERCIAL OPERATIN

  • Cumulative 'Ibtal Carmencing January 1,1975.

t l

8208120247 820709

{DRADOCK 05000244 l

PDR

. AVERAGE MILY UNIT POWER LEWL DOCKET NO.

50-244 UNIT #1 Ginna Station MTE July 9, 1982 COMPLETED BY bi1,.2.M4 h Andrew E. McNamara

'IELEPHCNE 1 (315) 524-4446 Ext. 293 or 501 at Ginna.

MONHI June, 1982 DAY AVERAGE MILY POWER LEVEL MY AVERAGE MILY POWER LEVEL (MWe-Net)

(Mie-Net) 1.

448 17.

366 2.

482 18.

482 3.

483 19.

482 4.

484 20.

483 5.

484 21.

482 6.

483 22.

482 7.

483 23.

481 8.

483 24.

482 9.

484 25.

482 10.

484 26.

482 11.

482 27.

481 12.

484 28.

482 13.

484 29.

482 14.

484 30.

481 15.

484 31.

16, 483 INSTRDCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Cmpute to the nearest whole megawatt.

DOCKET No. 50-244 UNIT NAME #1 Ginna Station UNIT SfUIDON AND POWER REDUCTICNS IRTE July _9, 1982 COMPIRIED BY &L r-2. M'VM Andrew E. Md4asnata REPORT MO mi June, 1982 1ELEPfKNE 1 (315) 524-4446 Ext. 293 or 501 Ginna Method of Duration Reason Shuttino Licensee System Conponent Cause & Corrective No.

Date Type 1 (Hours) 2 Down Event Code 4 Code 5 Action to Reactor 3 leport #

Prevent Recurrence P/R 06/17/82 F

18 B

N/A N/A HC (Iff EXCH) Reactor power level reduction to approximately 48% to isolate the 1-B Condenser. As nsion to 100%

level conenenced the same date.

While at reduced power level a series of turbine valve and trip tests were performed.

NorrE: Unit shutcbwns are ntmibered on yearly basis.

Power reductions will be designated as P/R only, with ro sequential ntaber.

1 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Li nsee C-Refueling 3-Automatic Scram.

Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 5 H-Other (Explain)

Exhibit 1 - Same Source d,

I

    • Also submitted with this report is a revised page for the May,1982 monthly report.

DOCKET N00 50-244 UNIT NAME f1 Ginna StEtion UNIT SHUIDO6N AND POWER REDUCTIGIS DATE June _4, 1982 CmPLEED BY d A r F. AtMh I

Andrew E. McNamafa REPORP KNIH May, 1982

'IEIEPIKNE 1 (315) 524-4446 Ext. 293 or 501 Ginna Method of Duration Reason Shutting Licensee System (baponent Cause & Corrective l

No.

Date Type 1 (Hours) 2 Down Event Code 4 Code 5 Action to Reactor 3 Report #

Prevent Recurrence 01 01/25/82 F/S*

2935.25*

C 3

82-003 HJ (Ifr EXCH) ** 'Ibtal hours for shutcbwn which Ebrced outage hours 614.50 ended 5/27/82 01745.

Scheduled outage hours - 2,320.75 (Began 2/20/82) 02 05/28/82 S

1.25 B

N/A Turbine Overspeed trip test.

Generator off-line.

03 05/28/82 S

5.5 B

N/A Unit renoved from service to obtain additional low power (1-3%) data on the Westinghouse Metal Impact Monitoring System.

l l

1 2

3 4

F: Ibrced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Bquipnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(NUREG-0161)

E-Operator Training & License Examination F-Achinistrative G-Operational Error (Explain) 5 Exhibit 1 - Same Source y

H-Other (Explain)

  • On February 20, 1982, regularly scheduled refueling shutdown hours conenenced, reflected by the change from forced outage to scheduled outage hours.

Revised 6/23/82

8

. NARRATIVE SUMARY OF OPERATING EXPERIEE DOCKET NO.

50-244 UNIT Ginna Station, Unit #1 DATE July 9, 1982 CmPLETED BY dh[.Meme, -

t Andrew E. McNamara

'IELEPHONE 1 (315) 524-4446 Ext. 293 or 501 Ginna.

KNI11 June, 1982

'Ihe reactor power level was maintained at 100% level for the majority of the report month, after initial ascension to the 100% level on the first day of the report nonth.

% e exceptions occurred as follows:

On June 17, 1982, the power level was reduced to approximately 48% to isolate the 1-B Condenser to check for a noise problem.

ne power level was returned to 100% after the problem was corrected. A series of turbine valve and trip tests were perforned while at the reduced power level.

On June 25, 1982, the power level was reduced to approximately 96% to perform a periodic test on the auxiliary feedwater system.

, GIPDIA STATIN Maintenance Report June, 1982 During June, routine maintenance and inspections were performed. Major safety related maintenance included:

Repair of 2 small leaks on the reference leg for the pressurizer level.

Both times gas needed to be vented off of the pots.