ML20062G090

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-12,revising Tech Specs to Allow Use of Vantage+ Reload Fuel at Facility,Which Offers Capability for Higher Burnups,Increased Corrosion Resistance & Decreased Fuel Costs
ML20062G090
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/16/1990
From: Skolds J
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20062G095 List:
References
813.20, NUDOCS 9011280385
Download: ML20062G090 (2)


Text

.__

Go h rohne El:ctric & Gas Company J n ko e sanxinsv ii.. sc 290es Nochar Operations (803) 3454 040 SCEAG

< *c=%

November 16,1990 813.20 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 i

Gentlemen:

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 l

TECHNICAL SPECIFICATIONS CllANGE REQUEST VANTAGE + RELOAD FUEL

\\

' South Carolina Electric & Gas Company (SCE&G) hereby requests an amendment to the Virgil C. Summer Nuclear Station (VCSNS) Technical Specifications. Speelfically, this proposed amendment revises Technical Specification 5.3, " Reactor Core," to allow the v

utilization of ZIRLO clad fuel assemblies and ZIRLO filler rods in the VCSNS core. This revision will support the use of an advanced Westinghouse fuel design, VANTAGE +, at VCSNS. VANTAGE + is a ZlRLO clad fuel design which offers the capability for higher burnups, increased corrosion resistance, and decreased fuel cycle costs.

Attachments 1, 2, and 3 constitute the licensing submittal for this Technical Speelfications Change Request. Attachment 1 provides the marked-up page for the I

proposed amendment. provides the required safety evaluation and contains the significant hazards evaluation pursuant to 10CFR50.92.

This proposed Technical Specifications amendment has been reviewed and approved by j

both the Plant Safety Review Committee and the Nuclear Safety Review Committee.

t VCSNS Intends to begin utilizing VANTAGE + fuel during Cycle 7.

As such, SCE&G requests the NRC to review and approve this amendment by March 15,1991.

I declare that the statements and matters set forth herein are true and correct to the best of my knowledge, Information, and belief.

Should you have any questions, please call at your convenience.

l Very truly yours, John L. Skolds EWR:JLS: led Attachments c: See Page 2 4

f 9011280385 901116 PDR ADOCK 05000395 L(

p PDC r).

L Document Control Desk November 16,1990 813.20 Page 2 l

c:

O. W. Dixon, Jr.

E. C. Roberts R. V. Tanner S. D. Ebneter G. F. Wunder General Managers NCR Resident inspector J. B. Knotts, Jr.

11. G. Shealy L. R. Cartin E. W. Rumfelt NSRC NPCF RTS (TSP 890021)

I t

NUCLEAR EXCELLENCE - A SMER TMOITION!

._