ML20062F864

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for May 1982
ML20062F864
Person / Time
Site: Turkey Point, 05000000
Issue date: 07/15/1982
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20062F833 List:
References
NUDOCS 8208120186
Download: ML20062F864 (1)


Text

-

T .

OPERATING DATA REPORT DOCKET NO. 50-251

. DATE JUL 15 68)

CO31PLETED BY P. Pace ___ ,

TELEPHONE (305) 552-365:

OPERATING STATUS Turkey Point Unit 4

1. Urdt Name: Notes * *
2. Reporting Period: May 1982 Unit 4 operated at essentially full power
3. Licensed Thermal Power (MWt): 2200 ,

I except to the outage.

4. Nameplate Rating (Gross MWe): 760 ,
5. Design Electrical Rating (Net MWe): 693 listed in the' unit .

shutdown report.

6. Maximum Dependable Capacity (Gross MWe): 680
7. Maximum Dependable Capacity (Net MWe): --646 I. 8. If Changes Occur in Capacity Ratings (Items Number 3 Throu;h !) Since Last Report.-Cive Reasons:'
9. Power Level To Which llestricted,if Any(Net MWe): I;= e
10. Reasons For Restrictions,if Any:
  • y This Me.:h Yr to.Date Cumulative  ;
11. Hours In Reporting Period 744 3623 7689'6

~

12. Number Of floun Reactor Was Critical 744 3444.1 ,

57423.2

13. Reactor Resene Shutdown lionrs O O 166.6
14. Ilours Generator On Line 740.9 3399.7 55483.4 1
15. Unit itesene Shutdown flours 0 0 31.2 l
16. Gross Thermal Energy Generated (MWH) 1619051 7443356 116659979
17. Gross Electrical Energy Generated (MWHJ 521225 ,_

2395635 37117752

18. Net Electrical Energy Generated (MWH) 496 614 2 277 936 35 166 714
19. Unit Service Factor 99.6 93.8 72.2
20. Unit Availability Factor 9.9.6 93.8 . 72.2 i 21. Unit Capacity Factor (UsingMDC Net) -

103.3 97.3 70.8

22. Unit Capacity Factor (Using DER Net) 96.3 90.7 66.0 j 23. Unit Forced Outage Rate . .4 1.0
  • 2.9
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.or.d D ra
ion of Eachl: - -
  • Stoan Generator repair prograta, 0::tober 1982, 9 raonths. .

t

25. If Shut Down At End Of Report Period. Estimated Date of S:m;;>:
26. Units in le,t Status (Prior to Connnercial Operation): Forecast Achiesed INI TI A 1. CRITICA LITY '

INillAL ELECT RICITY CO\l\1titCIAL OPEI! ATION t 07/771 i

G208120186 820715 PDR ADOCK 05000250

}

R PDR -

1

.,,._-,_.___-_.-,__i.,,_,,v_-,- . . . - - - - - - _ . _ - - _ _ - . _ , - _ _ r-e,-. - . - - _ . . _ - - , - - . _ . . , , b