ML20062F864
Jump to navigation
Jump to search
| ML20062F864 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, 05000000 |
| Issue date: | 07/15/1982 |
| From: | Pace P FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20062F833 | List: |
| References | |
| NUDOCS 8208120186 | |
| Download: ML20062F864 (1) | |
Text
T OPERATING DATA REPORT DOCKET NO.
50-251 DATE JUL 15 68)
CO31PLETED BY P.
Pace ___
TELEPHONE (305) 552-365:
OPERATING STATUS
- 1. Urdt Name:
Turkey Point Unit 4 Notes
- 2. Reporting Period:
May 1982 Unit 4 operated at essentially full power
- 3. Licensed Thermal Power (MWt):
2200 except to the outage.
I
- 4. Nameplate Rating (Gross MWe):
760 listed in the' unit
- 5. Design Electrical Rating (Net MWe):
693 shutdown report.
- 6. Maximum Dependable Capacity (Gross MWe):
680
- 7. Maximum Dependable Capacity (Net MWe):
--646 I.
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Throu;h !) Since Last Report.-Cive Reasons:'
- 9. Power Level To Which llestricted,if Any(Net MWe):
I;= e
- 10. Reasons For Restrictions,if Any:
y This Me.:h Yr to.Date Cumulative
- 11. Hours In Reporting Period 744 3623 7689'6
~
- 12. Number Of floun Reactor Was Critical 744 3444.1 57423.2
- 13. Reactor Resene Shutdown lionrs O
O 166.6
- 14. Ilours Generator On Line 740.9 3399.7 55483.4 1
- 15. Unit itesene Shutdown flours 0
0 31.2 l
- 16. Gross Thermal Energy Generated (MWH) 1619051 7443356 116659979
- 17. Gross Electrical Energy Generated (MWHJ 521225 2395635 37117752
- 18. Net Electrical Energy Generated (MWH) 496 614 2 277 936 35 166 714
- 19. Unit Service Factor 99.6 93.8 72.2
- 20. Unit Availability Factor 9.9.6 93.8 72.2 i
- 21. Unit Capacity Factor (UsingMDC Net) 103.3 97.3 70.8
- 22. Unit Capacity Factor (Using DER Net) 96.3 90.7 66.0 j
- 23. Unit Forced Outage Rate
.4 1.0
- 2.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.or.d D ra: ion of Eachl:
Stoan Generator repair prograta, 0::tober 1982, 9 raonths.
t
- 25. If Shut Down At End Of Report Period. Estimated Date of S:m;;>:
- 26. Units in le,t Status (Prior to Connnercial Operation):
Forecast Achiesed INI TI A 1. CRITICA LITY INillAL ELECT RICITY CO\\l\\1titCIAL OPEI! ATION t
07/771 i
G208120186 820715 PDR ADOCK 05000250 R
}
1
.,,._-,_.___-_.-,__i.,,_,,v_-,-
r-e,-.
-. - - _.. _ - -, - -. _..,, b