Monthly Operating Repts for June 1982
ML20062F846
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 07/15/1982
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20062F833 List:
References
NUDOCS 8208120181
Download: ML20062F846 (12)


Text

_ -.

~

AVEllAGE DAILY UNIT POWER LEVEL 50-250 DOCKET NO.

i UNIT Turkey Point 3 i

JUL 151982 DA1E P. Pace COMPLETED itY TELEP110NE (305) 552-3654 s

MONT}l June 1982 I

DAY AVER AGE I ALLY 'WER I.EVEL DAY AVER AGE DAILY POWER LEVEL

- (MWe-Net )

I 7

685 g-658 689 2

3 686 693 3

4 689 685 20 691 5

681 i

6 3&B 22 676 7

684 675 23 683 675 8

i 9

686 25 677 10 685 675

.' 6 l

684 674 l3 12 684 670 28 13 680 672 677 671 34

,20 15 674 678 16 INSTRUCTIONS On this format. Int ihe.r.crage daily unit power leselin MWe-Net for ca:h day in the reporting month. Compute io the nearest whote ">y swatt.

(9/77) 8208120181 820715 PDR ADOCK 05000250 R

PDR

OPERATING DATA REPORT DOCKET NO. 50-250 DATE Jul i s mag COSIPLETED BY p-Paca TELEPilONE (305) 552-3654 OPERATING STATUS Turkey Point 3

  • Nygit 3 operated S
1. Unit Name:

g at June 1982

2. Reporting Pen. d:

essentially full power o

except for,the outages

3. Licensed Thermal Power (31Wt):

n j

4. Nameplate Rating (Gross SIWE):

760 as shown'in the unit I

693 shutdown report.

5. Design Electrical Rating (Net 5tWe):

[

6. Slaximum Dependable Capacity (Gross SlWe):

680 646

7. Slaximum Dependable Capacity (Net 31We):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A NONE

9. Power Level To Which Restricted.If Any (Net SlWe):
10. Reasons For Restrictions.If Any:

n/a e

This 51onth Yr. to-Date Cumulative i1. Ilours in Reporting Period 720 4343

'R1 889.6

12. Number Of liours Reactor Was Critical 705.6 1901.3 57661.4

, '844.4

13. Reactor Reserve Shutdown flours 698.3 1809.6 55700.6 l
14. Ilours Generator On-Line 121.8 (f
15. Unit Reserve Shutdown flours 1538557 3920231 113 117 786
16. Gross Thermal Energy Ge'nerated (51Wil) i
17. Gross Electrical Energy Generated (51Wil) 4973C5_._._.

1267495 1s 961 120

18. Net Electrical Energy Generated (51Wil) 473538 1196200 34 017 866 I
19. Unit Service Factor 97.0 41.7 66.4 97.0 41.7 66.5

(

20. Unit Availability Factor 101.8 42.6

-62.8 j

21. Unit Capacity Factor (Using 51DC Net) 94.9 39.7 58.5
22. Unit Capacity Factor (Using DER Net)

?

23. Unit Forced Outage Rate 3.0 7.0 5.1
24. Shutdowns Scheduled Over Next 6 Slonths (Type. Date,and Duration of Each p:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INil~l A L CRITICA LITY I

INITIAL ELECTRICITY CO\\1\\lERCI AL OPER ATION l

(9/77I h'

w-a

50-250 DOCKE(NO.

UNITS!!UTDOWNS AND POWER REDUCTIONS Turkey Point 3 UNIT NAME DATE JUI 1 e -~

COMPLETED BY P. McFG June 1982 REPORT MONTH TELEFilONE (305) 552-3654 l

e.

^

=

'= -

Licensee P.,

h Cause & Currective 4.s.e ~4 i?

=

h Date i

~?

i ji$

Event 4: p p?

53

__ Action to 80 E'

Prevent Reeurrence d5 555 Report :

e e

U b

10 82-05-29 F

16.2 A

4 250-82-07 CP PUMPXX Unit removed from service to repair reactor coolant pump oil leak.

OutTge continued.to repair snubber on the S/G blowdown drain line.

11 82 06-01 F

5.5 H

3 IA INSTRU The Unit t'.ipped on steam generator low level coincident with a mismatch of steam flow and feed flow. The unit was recovered and brought back on line.

n l

t 2

3 4

l F: Forced Reason:

Method:

Exhibit G Instructivas

$; Scheduted A Equipment Failure (Explain) 1-Manual for Preparation of D :ta B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatie Scram.

Event Report (LER) File (NUREG.

l D Regu!atory Restriction C).Other (Explain) 01611 E-Operator Training & License Examin:: tion F Administrative Y ' 0 * "' " "#

G-Operational Error (Explain)

s. Aoao coven.cl Exh: bit 1 Same Souree

]

(9/77)

Il Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

5s-250 UNIT Turkey Point Unit No. 3 DATE JUL 151987 COMPLETED BY P.

L. Pace TELEPIIONE (305) 552-3654 REPORT MONTil June 1982 Unit 3 operated at essentially full power except for a brief outage on 6/1.

See the " Unit Shutdown Report" and Power Reduction for details.

Major Safety-related maintenance activites performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0737 and continuing.

Florida Poweg & Light Company commitments for NUREG-0737 implementation are continuing.

Refer to correspondence between PPL and NRC for additional information.

L

AVER AGE DAILY UNIT POWER LEVEL

~

50-251 DOCKET NO.

UNIT Turkey Point 4 DA1E JUL 15 MM i

P. Pace COMPLETED 11Y TELEPilONE (305) 552-3654 s

MONTil June 1982

~

1 DAY AVER AGE D \\1 PO VER LEVEL DAY AVER AGE DAILY POWER LEVEL

-(MWe-Neil i

l 1

668 37 669 2

67E 679 3

678 683 3

19 4

677 676 20 18 659 5

.,7 6

22 647 647 7

33 8

645 f

9.

25 650 649 10 26 11

-~~

648 g

32 28 646 652 13 39 406 649 14 15 659 3g 16 665 i

INSTRUCTIONS On this funnar.lut the aterage daily unit power leselin Mwe. Net for n:h day in the reportine month. Compute to the nearest whole impwart.

(9/77)

f OPERATING DATA REPORT DOCKET NO. 50-251 DATE JtJL i 51982 P.

Pace COMPLETED BY TELEPHONE (305) 552-3654 OPERATING STATUS Turkey Point 4 Notes

1. Unit Name:

June 1982 Unit 4 operated at

2. Reporting Pen. d:

essentially full power o

2200

3. Licensed Thermal Power (MWt):

except for an outage as 760

4. Nameplate Rating (Gross MWe):

described in the unit 693

5. Design Electrical Rating (Net MWe):

shutdown report.

680

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

N/A l

9. Power Level To Which Restricted. If Any (Net MWe):

NONE

10. Reasons For Restrictions,if Any:

N/A This Month Yr..to.Date Cumulatise 720 4343

'77 616

11. Ilours in Reporting Period 503.2 3947.3 57926.4
12. Number Of floun Reactor Was Critical

' 166.6

13. Reactor Reserve Shutdown llours
14. Ilours Generator On Line 499.7 3898.7 55983.1 31.2
15. Unit Reserve Shutdown Houn 1098573 8532929 117 749 552
16. Gross Thermal Energy Generated (MWH) 344730 2740415 37 462 482
17. Gross Electrical Energy Generated (MWH) 2603942 35 492 720 326006
18. Net Electrical Energy Generated (MWH)

I

"*4 R9.f 72.1 i

19. Unit Service Factor

"*1 il

20. Unit Availability Factor 89.8
21. Unit Capacity Factor (Using MDC Net) 70.1 92.8 70,8 65.3 86.5 66.0
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 30 6 A?

3_2

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duntion of Eacht:

(

s/G Maintenancn. Julv 7.

lon?_ nnnrnvimw,ay 7

,,m u

25. If Shut Down At End Of Report Period. Estimated Date of Start.:p:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INIT I A L CHillCALITY INill AL Ell:CTRICil Y CO\\l\\ll~llCIA L OPER AllON (9/77 )

l L

m -,

i

1 DOCKET NO.

mm 1

UNITS!!UTDOWNS AND POWER REDUCTIONS UNIT NAME mn vt m-rm4"t 4 DATE JUL 1'51982 i

P. Pace CONIPLETED ilY REPORT 5!0 NTH June 1982 TELEPl!ONE (305) 552-3654 r*,

1

.Y 1rs :

~

re

.5 E s

45'4 Licensee 3 -t.,

h, Cause & Currectne i

Date 3,

?

4 3i$

Event aL F7 E.~i Action to f5 3g3

. Report :

EL EV Prevent Recurrence H

L e

l O

J 12 82-06-05 F

220.3 A

1 IIB HTEXCH thit was removed from service to repair secondary system minor j

steam leaks and to plug a

{

leaking steam generator tube.

I i

i it I

k 2

3 4

l F: Forced Reason:

Method:

Exhibit G Instructions i

S: Schedu!ed A Equipment Failure (Explain) 1 Manual for Preparation of Data

11. Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatie Scram.

Event Report (LER) File (NUREG.

i D Regulatory Restriction 9 Other (Explain) 01611 i

E-Operator Training & License Examination i

F. Administrative Y ~~ O * "' " " "

S C-Operationa! Error (Explain) s _ j.o a a nove.,..</

Eshibit I.Same Source

]

(9/77) li Other (Explain) l

SUMMARY

OF OPERATING EXPERIENCE 50-251 DOCKET NO.

Turkey Point Unit No. 4 UNIT 1 5 1382 DATE P.L. Pace COMPLETED BY (305) 552-3654 TELEPHONE REPORT MONTH June 1982 Unit 4 Operated at essentially full power except for an outage to repair See the secondary side steam leaks and to plug a steam generator tube.

" Unit Shutdowns and Power Reductions" Report for details. Major maintenance activities performed during the month included:

6 4B Safety Injection pump overhauled The surfaces on several handholes and a manway on A,B and C Steam Generator were refinished to eliminate steam leakage Minor leakage from a letdown valve and a accumulator check valve was corrected A Steam Generator tube in B Steam Generator was plugged Inspections and requirements of IE Bulletins and NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

See the " Unit Shutdowns and Power Reductions" Report for additional maintenance activities.

AVEltAGE DAILY UNIT POWER LEVEL 50-335 DOCKET NO.

(JNIT st. Lucie 1 DA'IE JUL 151982 P. Pace COMPLETED BY.

TELEPilONE (305) 552-3654 s

MONTH June 1982 DAY AVEltAGEI\\1

,'O ER LEVEL DAY AVER AGE DAILY POWER LEVEL

-(MWe-Net) 1 842 840 g7 843 842 2

3 3

R43 19 837 4

584 838 20 696 836 5

6 R39 22 836 7

838 841 23 840 796 8

9 837 25 839 10 838 839 6

838 838 33 12 837 839 yg 33 836 842 14 n t7 30 843 15 838 3,

839 16 INSTRUCTIONS On this format. lor efic.ncrane dady unit power leselin MWe. Net for each day in the reporting m.mth. Compute to the nearest whole "i gswatt.

(9/77)

OPERAl!NG DATA REPORT DOCKET NO.

50-335 DATE JUL 151982 COMPLETED BY P. Pace TELEPilONE (305) 552-3654 OPERATING STATUS

1. Unit Name:

St. Lucie Unit 1 Notes June 1982 Unit 1 operated at

2. Reporting Period:

2700 essendally full power

3. Licensed Thermal Power (MWt). _ _.

except for the outage

4. Nameplate Rating (Gross MWe):

890 listed in the unit shutdowns

5. Design Electrical Rating (Net MWe):

830

6. Maximum Dependable Capacity (Gross MWe):

862

7. Masimu.n Dependable Capacity (Net MWe):

817

8. If Changes Occur in Capacity Ratings (Items Number 3 Tgggh 7) Since Last Report. Give Reasons:
9. Power Lesel To Which Restricted,II.Ar"(Net MWe):

unMF

10. Reauens For Restrictions. If Any:

N/A 4

This Month Yr..to Date Cumulatise 48'31 I1. Ilours in Reporting Period 720 4343 4

12. Number Of flours Reactor was Critical 720 3900.4 38729.8
13. Reactor Resene Shutdown llours 205.3
14. Ilours Generator On Line 714.8 3873.0 37885.9
15. Unit Resene Shutdown floun 39.3
16. Gross Thermal Energy Generated (MWil) 1897304 1 n u nann 9 m34399
17. Gross Electrical Energy Generated (MWill 6_25250,,

3384550 30442665

18. Net Electrical Energy Generated (MWil) 593528 3207835 28667382
19. Unit Senire Factor 99.3 89.2

/u.4

20. Unit Asailability Factor 99.3 89.2 78.3
21. Unit Capacity Factor IUsing MDC Net 100.9 92.7 76.1
22. Unit Capacity I actor (Using DER Net) 99.3 90.5 73.7
23. Unit I orced Outage Rate

.7

.1 3.0

24. Shutdowns Scheduled User Nest 6 Months (1spe. Date.and Duration of Eacht
25. If Shut Down Ae I:ml Of Report Perimi,1 stimated Date of startup:
26. Units in fest Status (Prior io Connnercial Operation).

I oreea t Achiet ed INill \\ L CI(lllCAl.ll y INIII\\1.I't.1C111101IY

( O\\l\\ll Itrl \\l. opt R Al TON 14/77i

... ~ -

50-335 DOCKET NO.

UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAME o

m, DATE JUL 1019N>

P-P3C*

COMPLETED BY REPORT MONTH Je61 TELEPilONE (305) 552-3654 e.

.{ ?

3

) Yk Licensee 3 r,,

Cause & CorrecFve L.

Date y,

5g 4

iiE Event 4b 37 5-1 Action to H

A 3g=

Report :

mL EO Prevent Recurre e E

v 6

12 82-06-04 F

5.2 A

1 EG CKTBRK The Unit was rectoved from service to repair a generator breaker disconnect switch in the plant switch yard.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data IMlaintenance of Test 2 M.inual Scram.

Entry Sheets for Licensee C Reft. cling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction C)-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative Y ~ 0 * "' "" ##

5 G-Operational Error (Explain)

s. Aoao a.Inve.,..cl Exhibit 1 Same Souree (9/77)

Il Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-335 UNIT St. Lucie Unit No. 1 DATE JUL i* 887 COMPLETED BY P.L. Pace TELEPIIONE (305) 552-3654 REPORT MONTl!

June 1982 Unit 1 operated at essentially full power except for a brief outage to repair a generator breaker disconnect switch in the plant switchyard.

Major Safety-related maintenance activites performed during the month included:

Emergency Diesel Generator Turbocharger replacement Inspections,and requirements of IE Bullentins and NUREG 0737 in progress.

Florirla Power & Light Comapny commitments for NUREG-0737 implementation are cort inuing Refer to correspondence between FPL and NRC for additional information.