OPERATING DATA REPORT DOCKET NO. 050-298 DATE June 29, 1982 COMPLETED BY P. L. Ballinger TELEPHONE 402-R25-1811 OPERATING STATUS Cooper Nuclear Station Notes

1. Unit Name:
2. Reporting Period: June 1982 2381
3. Licensed Thermal Power (MWt)

836

( 4. Nameplate Rating (Gross MWe):

0 i 5. Design Electrical Rating (Net MWe):

787

6. Maximum Dependable Capacity (Gross MWe):

764

7. Maximum Dependable Capacity (Net MWe):

l 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

9. Power Level To Which Restricted,If Any (Net MWe): None
10. Reasons For Restrictions.If Any:

l

! This Month Yr.-to.Date Cumulative 720.0 4,343.0 70,128.0

11. Hours In Reporting Period 0.0 3,318.5 57,204.9 l 12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0.0 0.0 O.0

) 0.0 3,309.3 56,266.8 l 14. Hours Generator On-Line 0.0 0.0 0.0 l 15. Unit Rewrve Shutdown Hours

16. Gross Thermal Energy Generated (MWH) 0.0 7,276,992.0 110,965,470.0 0.0 , _ , 9.424.4R7.n 14.gns 974.0
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 0.0 2.349.207.0 33.646.585.0
19. Unit Service Factor 0.0 76.2 80.2
20. Unit Availability Factor 0.0 76.2 80.2
21. Unit Capacity Factor (Using MDC Net) 0.0 70 A ro a l 0.0 69.5 61.7
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0.0 1.9 3.9 j 23. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each1:

i

25. If Shut Down At End Of Report Period. Estimated Date of Startup: In 1 v 1- 19R7 l
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMM ERCIAL OPER ATION 8208120042 820629 1"! A PDR ADOCK 05000298 R PDR

i .

AVERAGE DAILY UNIT POWER LEVEL I

i DOCKET NO. 050-298 WIT Cooper Nuclear Stat.

June 29, 1982 DATE

! COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 37 0 2 0 gg 0 3 0 39 0 4 0 20 0 5 0 21 0

6 0 yy o 0 0

._ 7 23 8

0 o 34 9 0 25 0 10 0 26 0 11 0 27 0 12 0 g 0 13 0 0 29 14 0 30 0 15 0 33 0 16 0 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

I ET NO 28 UNITSilU1 DOWNS AND POWER REDUCTIONS ,

Nuclear St t.

June 29, 1982 DATE COMPLETED BY P. L. Ballinger REPORT MON Til June TELEPilONE 402-825-3811

~.

_ E c

- ;, [E 3 $ $3 Licensee [ t, t Cause & Corrective No . Date 3 3g  ?, jj$ Event 3? {3 o-gu Action to 5 (N U Prevent Recuirence H

$5 3@c e g Report c o

O 2 N/A N/A N/A 1982 Refueling and Maintenance Outage 82-5 820521 S 720 C 3 4 1 2 I~ : Forced Reason: Method: Exhibii G Instructions A Equipment Failure (Explain) 1-Manual for Preparation of Data S. Scheduled B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File INIIRI G-D Regulatory Restriction 4-Other ( Explain) 0161) 1 -Operator Training & License Examination F Administratne 5 G-Operational Error (Explain) Exhibit I Same Souru l')/77 ) II Other (Explain) v L

Operations Narrative Cooper Nuclear Station June 1982 The 1982 Refueling and Maintenance Outage continued through the month of June but is nearing completion. Some delays were encountered with work in the torus on the Mark I Containment Project and with work on the Scram Discharge Volume. A July 3,1982 startup date is planned.

..