Text
.'f
~
e/
1d1/k UNITED STATE 3 NUCLEAR REGULATORY CCMMISSION yN 4
j I '
W ASHINGTON, D. C. 20555
\\....
November 15, 1978
+
ALL POWER REACTOR LICENSEES Gentlemen:
This letter is being sent to all licensees authorized to operate or construct a nuclear power reactor and to all applicants with applications for a license to operate or construct a power reactor.
In late September and early October the NRR staff held a series of regional meetings with the nuclear power reactor industry to discuss implementation of the training and qualification requirements contained in Appendix B of 10 CFR 73. At these meetings considerable interest was shown in holding workshops at which the techniques of job analysis and performance testing would be explained along with how they relate to training and qualification plan development.
In response, NRR will sponsor such workshops.
The work-shop will be designed for the working level personnel who will be directly involved in training and qualification plan development.
Schedule and space limitations require that each site be limited to two representatives.
NRR is planning to send out pre-workshop material that the site representatives should complete before the workshop.
To facilitate this mailing, please use the attached registration form to identify who is going to attend.
If you are sending a representative, the registration form must be returned to the following address by December 8,1978:
U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation ATTN:
Frank G. Pagano, Jr.
Washington, D.C.
20555 Attached is a list of workshop locations and tentative scheduled dates.
Please indicate the dates of your first, second and third choice on the registration form.
Every effort will be made to schedule your representative for their first choice.
The pre-workshop materials and registration confirmation along with the exact locations of the workshops will be mailed out by the first of next year.
781218ooM
i e
_ 2_
for further comments, please conta::t Tom McKenna of my staff on (301) i 492-7846.
Sincerely, pp f c..
.4 N
3
. pu 7
James R. Miller, Assistant Director for Reactor Safeguards
' Division of Operating Reactors i
Enclosures:
1.
Registration Form-2.
List of Workshop Locations and Scheduled Dates 5
cc:
Service List 1
\\
..p i
\\
19-G.i
-x, t
i 3
.--+ - - - - - - -.,.. -.., -. _.
w.r r
w-1
,,---,,y--,--,
,-y-
.yp-wi
\\
TRAINIflG AND QUALIFICATION PLAN WORKSHOP 7
4 s
REGISTRATION FORM
\\
s t
Reactor Site Represented Individuals Attending:,
- 1 Name
's Ti tle Company Address.
City State Zip s
- 2 Name Title 3'
Company Address City State Zip L{st date of the workshop you wish to attend in order of preference:
1st Choice
~
2nd Choice r
3rd Choice s
I
- Dj, t
i
'f*
,f,
' l.
I 4
WORKSHOP SCHEDUI.E Loca tion
- Dates Region 1 1st session 1-30 thru 2-1 2nd session 2-6 thru 2-8 1
3rd session 5-15 thru 5-17 Region II 1st session 2-20 thru 2-22 2nd session 3-6 thru 3-8 3rd session 5-22 thru 5-24 Region III lst session 3-20 thru 3-22 2nd session 4-3 thru 4-5 Region IV 4-17 thru 4-19 Region V 5-1 thru 5-3
- The workshops will probably be held at the NRC Regional Office but firm arrangements have not been completed.
I
Connecticut Yankee Atomic Power Company 50-213 cc Day, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 061 03 Superintendent Haddam fleck Plant RFD #1 Post Office Box 127E East Hanpton, Connecticut 06424 Russell Library 119 Broad Street Middletown, Connecticut 16457 Mr. James R. Himmelwright Post Office Box 270 Hartford, Connecticut 06101 i
i I
i l
l e
a