Forwards IE Bulletin 78-12A,suppl to IE Bulletin 78-12. W/Encl ANO:7811300055
ML20062F234
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 11/24/1978
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Wofford A
LONG ISLAND LIGHTING CO.
References
NUDOCS 7812150169
Download: ML20062F234 (1)


Text

__ - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. ~

h

.. c , PDA ,,

  1. 8849 UNITED STATES [t g!, g i pl Y., NUCLEAR REGULATORY COMMISSION  !

l [ t ) PI o REGION I i 3* -(s [ -l 631 PARK AVENUE l

..,,,(f Kina or caussia, penssvevania is o.

Docket No. 50-322 2 4 NOV 1970

'l  ; Long Island Lighting Company

~

ATTN: Mr. Andrew W. Wofford i

Vice President l 175 East Old Country Road Hicksville, New York 11801

]

Gentlemen:

i i Enclosed is a supplement (IE Bulletin No.78-12A) to IE Bulletin No.

! 78-12 which requires action by you with regard to your power reactor facility (ies) with an operating license or a construction pennit.

(m ._

~

'4 Should you have any questions regarding this Bulletin or the actions i

required by you, please contact this office.

Sincerely, "7M&5. hksv QBoyceH.Grier

~

rector

Enclosures:

c.

l. IE Bulletin 78-12A r
2. List of IE Bulletins / -

, Issued in 1978 . ,

t

,- m .. -

i V ch w/encls: C' .

j J. P. Novarro, Project Manager .

n .

Edward M. Barrett, Esquire

. i Edward J. Walsh, Esquire -

ji T. F. Gerecke, Manager, Engineering ~.;

QA Department i

s 1

i i

781215d M i

m~v m--e~ r m = - me , -wo- ,,

,, I l . .

UNITED STATES i i '

NUCLEAR REGULATORY COMMISSION

, 'l OFFICE OF INSPECTION AND ENFORCEMENT ,

l 4

WASHINGTON, D.C. 20555 -

l l IE Bulletin No.78-12A Date: November 24, 1978 4 Page 1 of 2 1

ATYPICAL WELD MATERIAL IN REACTOR PRESSURE VESSEL WELDS Description of Circumstances:

, j This Bulletin is a supplement to IE Bulletin 78-12, issued on September 29, 1978, and the two documents should be considered together.

Bulletin 78-12 described the use of weld wire that failed to meet all l specified chemical properties in weld; of twelve identified reactor '

, pressure vessels. Use of the atypical weld material in vessel .weldments causes them to have higher than normal all-ductility transition tempera-ture characteristics which in turn requires more consekvative pressure / .

temperature operating limits.

b

! Bulletin 78-12 was issued for the purpose of verifying that similar atypical weld material was not also supplied to other vessel manufacturers and used in reactor pressure vessel fabrication. Recognizing that the scope of the record review required is extensive and time consuming, and to assure that responses provided are meaningful, the requirements of Bulletin 78-12 are being modified.

Action To Be Taken By Licensees and Permit Holders:

For all power reactor facilities with an operating license or a construction permit, except those already identified as possibly having atypical weld materiall: '

i l.

Provide all information available on weld materiais used for each reactor vessel primary boundary ferritic weldment.2 (Items lc, ld, '

2a, 2b, first sentence of 2c, 3 and 4 of Bulletin 78-12.) This in-O formation may be provided to NRC through the vessel manufacturers j or suppliers as appropriate to prevent duplication of data. l f .

I 1 The twelve nuclear units identified as havini possible atypical i

pressure vessel weldments are: Three Mile Island Unit Nos. 1 and 2, Crystal River Unit No. 3, Arkansas Nuclear One Unit No.1, Oconee

.  ! Unit No. 3, Rancho Seco Unit No.1, Midland Unit No.1, Quad Cities -

l Unit No. 2, Browns Ferry Unit No.1, Turkey Point Unit No. 4 and j Zion Unit Nos. 1 and 2.

i 2WeldmaterialinformationsubmittedwillbeevaluatedbyMRC. Requests for further information will be dependent upon results of these evalua-tions. Additional requests or instructions will be issued following these evaluations.

j i

n.w, ,., - .,

7_ w- - .-- - w -w ~

s + mw

~ -

a

^

' iQ IE Bulletin No.78-12A

, Date: November 24, 1978 i- _ , Page 2 of 2 ,

1

.. 2. Correlation of specific heat, lot or batch to specific weldments in

'j specific vessels'is not required at this time. (Last sentence of ij Item 2c,Bulletin 78-12.) However, each licensee is required to a verify that the held materials information provided to the NRC

. z ., ;f under Ite,n 1 does in fact cover each reactor vessel for which the

' '.'- licensee is responsible.

'C -

.1 l 3. Responses to item 1 above shall be submitted in writing within 120

'^

! days of the date of this Bulletin supplement. Reports should be l

submitted to the Director of the appropriate NRC Regional Office and a copy should be forwarded to the U.S. Nuclear Regulatory 1

Commission, Office of Inspection and Enforcement, Division of

,j Reactor Construction Inspection, Washington, D.C. 20555.

Apprcved by GAO, B'180225 (R0072); clearance expires 7/31/80. Approval

.qj was given under a blankat clearance specifically for identified generic

, \1 problems.

1 -

W i

.' .l i ,

l i

l i  :

.4 e.. ,m e=e- -

-a e, - m--

. ~

IE Bulletin No.78-12A November 24, 1978 Page 1 of 2 LISTING 0F IE BULLETINS ISSUED IN 1978 5 , Bulletin Subject Date Issued Issued To No.

's 78-01 Flemmable Contact - 1/16/78 All Power Reactor

', Arm Retainers in G.E.

Facilities with an

, CR120A Relays Operating License (OL) or Construction Permit (CP) i

78-02 Terminal Block 1/30/78 All Power Reactor

.) Qualification Facilities with an OL or CP

) 78-03 Potential Explosive 2/8/78 All BWR Power

~

Gas Mixture Accumula- Reactor Facilities l tions Associated with with an OL or CP l

k-) BWR Offgas System

$ Operations

! 78-04 Environmental Quali- 2/21/78 All Power Reactor  ;

fication of Certain Facilities with an '

Stem Mounted Limit OL or CP Switches Inside Reactor Containment '

! 1

~!

78-05 Malfunctioning of 4/14/78 All Power Reactor Circuit Breaker Facilities with an  ;

I Auxiliary Contact OL or CP Mechanism-General Model CR105X  :

78-06 Defective Cutler-O Hammer, Type M Relays 5/31/78 All Power Reactor Facilities with an With DC Coils OL or CP

. l 78-07 Protection afforded 6/12/78 All Power Reactor

.j by Air-Line Respirators Facilities with an I and Supplied-Air Hoods OL, all Class ~E and F i

i Research Reactors with an OL, all Fuel Cycle l Facilities with an OL, and all Priority 1 '

isaterial Licensees 4

l i

I l

^ ' '

2 -- -

' ~ ~

IE Bulletin No.78-12A v November 24, 1978 ,

Page 2 of 2 LISTING OF IE BULLETINS ISSUED IN 1978

'+; .-

'P -

Bulletin Subject Date Issued Issued Tc j No.

i

,. r 1

' h". "id{l 78-08 Radiation Levels from 6/12/78 All Power, Test', and Fuel Element Transfer Research Reactor 1

I Tubes Facilities with an OL y '

having Fuel Element

'} Transfer Tubes.

78-09 BWR Drywell Leakage 6/14/78 All BWR Power Paths Associated with Reactor Facilities Inadequate Drywell wi .5 an OL (for action) .

Closures tr CP (for information). '

i O 78-10 Ber9en-Paterson Hydraulic Shock 8/27/78 All Power Reactor Facilities Suppressor Accumulator with an OL or CP.

Spring Coils 78-11 Examination of Mark I 7/21/78 BWR Power Reactor t Containment Torus Facilities with an OL r Welds for action: Peach Bottom 2 and 3, Quad v Cities 1 and 2, Hatch ,

1, Monticello and i i Vermont Yankee. All ,

i other BWR Power Reactor l 4

j Facilities with an OL f for information.

I 1

O 78-12 Atypical weld Material in Reactor Pressure Vessel 9/29/78 All Power Reactor Facilities with an OL or l

i Welds CP

. 1 I

j 78-13 Fafiures in Source Heads 10/27/78 l of Kay-Ray, Inc. Gauges AllGen'.a1andSpecific[

Liceno es with the

'i Models 7050, 70508, 7051, Subjr . Xay-Ray, Inc.  !

7051B, 7060, 70608, 7061 Gaugas and 7061B i I

i

'{