E hiL_l'91z r.
- g UNITE D STATES NUCLEAR REGULATORY COMMisslON
< {.
{. '.k.)7,. $
, j' y j
WASHINGTON, D. C. 20555
/
t,**bRff g
j November 28, 1978 acket No. 50-213 Connecticut Yankee Atomic Power Company ATTN: Mr. W. G. Counsil, Vice President Nuclear Engineering and Operations Post Office Box 270 Hartford, Connecticut 06101 7
Gentl emen :
RE:
PIPE BREAKS INSIDE CONTAINMENT FOR THE HADDAM NECK FACILITY General Design Criterion 4 of Appendix A to Title 10, Code of Federal Regulations, Part 50, requires in part that:
... structures, systems and components shall be designed to accommodate the effects of loss-of-coolant accidents and shall be appropriately protected against dynamic effects... ".
Acceptable methods of complying with this regulation are, in part, provided in the Standard Review Plan Section 3.6.2 and Regulatory Guide 1.46 (Protection Against Pipe Whip Inside Containment).
As you are aware, the Systematic Evaluation Program includes a topic on the Effects of Pipe Break on Structures, Systems and Components Inside Containment (III 5. A) which stems from this basic regulation and current licensing criteria.
Our review of material currently in your docket has not located sufficienc infomation to allow a technical evaluation of the subject.
As we have previously stated, it would be necessary to request evaluations from licensees for our review of certain SEP topics.
We have determined that e
your assistance is needed to supply technical infomation which will allow us to compare your plant design to current criteria and to evaluate the significance of potential deviations.
Enclosed is a copy of a letter you received earlier, which summarized current criteria and discusses the SEP review approach presently planned.
A meeting will be scheduled ^.o discuss this topic with you.
As soon as possible, but at least two weeks prior to that meeting, you should provide any pertinent.information you may have, by reference to docketed material or copies of additional relevant studies or analyses whicn may not have been docketed.
At this meeting, you should be prepared to discuss a program for resolving this topic.
Based upon the lack of docketed information, we expect this program may require substantial effort on your part.
7 0 ' ' ~ ' '3 ]
f
Connecticut Yankee Atomic November 28, 1973 Power Company If you have any questions prior to the meeting, please feel free to contact us.
Sincerely, l
Darre G.' Eis n ti assistant Director for Systems & Projects Division of Operating Reactors
Enclosure:
As stated I
cc w/ encl:
See next page 5
1 i
l i
i i
I l
Connecticut Yankee Atomic Power Company 3-November 28, 1978 cc w/ enclosure:
Day, Berry & Howard Counselors at Law One Constitution Plaze.
Hartford, Connecticut 061 03 Superintendent Haddam Neck Plant RFD #1 Post Office Box 127E East Hampton, Connecticut 06424 Russell Library 119 Broad Street Middletown, Connecticut 16457 I
Mr. James R. Himmelwricht Post Office Box 270 Hartford, Connecticut 06101 X M C, Inc.