ML20062E731

From kanterella
Jump to navigation Jump to search
Forwards IE Safeguards Insp Repts 50-321/82-22 & 50-366/82-20 on 820718-22.No Noncompliance Noted
ML20062E731
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/05/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20062E735 List:
References
NUDOCS 8208100308
Download: ML20062E731 (2)


See also: IR 05000321/1982022

Text

'..

'

ShFEqugRDS~liVFORMATION

AUG 51982

Georgia Power Company

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

Subject: Report Nos. 50-321/82-22 and 50-366/32-20

This refers to the routine safeguards inspection conducted by Mr. D. E. Moore

of this office on July 18-22, 1982, of activities authorized by NRC License

Nos. DPR-57 and NPF-5 at the Hatch 1 and 2 facility and to the discussions of

our findings held with Mr. H. C. Nix, Plant Manager, at the conclusion of the

inspection.

Areas examined during this inspection included your physical security program

as implemented under the provisions of Title 10, Code of Federal Regulations,

Part 73, " Physical Protection of Plants and Materials" and the. specific requirements

of your approved Security Plan. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, performance tests, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is

discussed in the enclosed report.

The material enclosed herewith contains Safeguards Information as defined,by-

10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by

, Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the

material, with the exception of the report cover page which is an inspection

summary, will not be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure: See Page 2

ENCLO5msC3HIAINS_%

g gg.. g g e m if03.

8208100308 820805

DR ADOCK 05000

FGUARDS INFORMATION i.;;,yj;gfo.

~

1

SAFEGUARDS-INFORMATION

,

Georgia Power Company. 2 AllG 51982

Enclosure:

Inspection Report Nos. 50-321/82-22

and 50-366/82-20

(Safeguards Information)

cc w/ enc 1:

J. T. Beckham, Vice President

and General Manager

H. C. Nix, Plant Manager

C. E. Belflower, Site QA Supervisor

bcc w/ enc 1:

IE File

NMSS/SGPL

NRR/DL/ SSP 8

bcc w/ Inspection Summary

Document Management Branch

NRC Resident Inspector

State of Georgia

,

R :ETP :ETP RII

P RI RII: P

DM .(R

DMcGuire AG bson JRogg - HDance

07/ pore:my 07/g/82 /82 08 2 08/f /82

3 /82

n uox n co m ins N

"">*s mannor.'

SAFEGtjARDnae'ao3 GRMA_IFORMATION b' ' runrom

' rais ,

-

D3CO:: TROL 13D.