ML20062E689
| ML20062E689 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 07/29/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20062E691 | List: |
| References | |
| NUDOCS 8208100252 | |
| Download: ML20062E689 (2) | |
See also: IR 05000249/1982008
Text
-
.
-
. . . . .
.
l_
2 9' EE29
Docket No. 50-249
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. I. Jackiw,
F. Maura, and D. Robinson of this office on April 20, 22-25 and May.10 and 21,
1982, of activities at Dresden Nuclear Station, Unit 3, authorized by NRC
Operating License No. DPR-25 and to the discussion of our findings with
Mr. D. Scott at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspecti s,
certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Roor .
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
>
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
8208100252 820729
'I h
PDR ADOCK 05G00249
A
O
__
'
_.
-
,
.
JUb 2 0 082*
Commonwealth Edison Company
2
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
The responses directed by this letter (and the accompanying Notice) are
not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Trfsf5IS O I N*N'
C. E. Norolius, Director
Division of Engineering and
Technical Programs
Enclosures:
1.
Appendix,
2.
Inspection Report
No. 50-249/62-08
cc w/encls:
Louis 0. De1 George, Director
of Nuclear Licensing
D. J. Scott, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
d
vs
I
RIII
RIII
RIII
s
RIII
M
/dm
R
on
iw
p
I Nor
s qIT*
6/24/82
4
k
e.v
LdtAo