Forwards IE Insp Rept 50-249/82-08 on 820420-0521 & Notice of Violation
ML20062E689
Person / Time
Site: Dresden Constellation icon.png
Issue date: 07/29/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20062E691 List:
References
NUDOCS 8208100252
Download: ML20062E689 (2)


See also: IR 05000249/1982008

Text

-

.

-

. . . .. .

l_ 2 9' EE29

Docket No. 50-249

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. I. Jackiw,

F. Maura, and D. Robinson of this office on April 20, 22-25 and May.10 and 21,

1982, of activities at Dresden Nuclear Station, Unit 3, authorized by NRC

Operating License No. DPR-25 and to the discussion of our findings with

Mr. D. Scott at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspecti s, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Roor . If this report contains any information

>

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

8208100252 820729

PDR ADOCK 05G00249 'I

A h

'

O PDR __

_.

,

.

Commonwealth Edison Company 2 JUb 2 0 082*

part of the affidavit. If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

The responses directed by this letter (and the accompanying Notice) are

not subject to the clearance procedures of the Office of Management and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Trfsf5IS O I N*N'

C. E. Norolius, Director

Division of Engineering and

Technical Programs

Enclosures:

1. Appendix,

Notice of Violation

2. Inspection Report

No. 50-249/62-08

cc w/encls:

Louis 0. De1 George, Director

of Nuclear Licensing

D. J. Scott, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Karen Borgstadt, Office of

Assistant Attorney General

d

vs I

RIII RIII RIII s RIII

M /dm R on iw p I Nor s qIT*

6/24/82 4

k

e.v LdtAo