gy 6 JUL 2 8 1982 Docket Nos. 50-440/441 Mr. Dalwyn R. Davidson Vice President System Engineering and Construction The Cleveland Electric Illiminating Co.

P. O. Box 5000 Cleveland, Ohio 44101

Dear Mr. Davidson:

Subject:

Unresolved Fire Protection Issues for the Perry Nuclear Power Plant, Units 1 and 2 Your letters dated April 18,1982, April 29,1982 and May 6,1982 provided information required to confim commitments indicated in SER Sections 9.5.1.2 9.5.1.3 and 9.5.1.5.1 (pertaining to automatic transfer of all fire detection and suppression onto the emergency diesel generator). The NRC staff has reviewed this infomation and finds it to be satisfactory. However, further information addressing the commitment for local audible fire alams in the plant is still required to fully satisfy Section 9.5.1.5.1. It should be noted that the confirmatory commitments cited in Sections 9.5.1.2, 9.5.1.3 and 9.5.1.5.1 were not specifically included in the confirmatory open items listed in Section 1.10 of the SER.

Your letter dated April 8,1982 furnished infomation which was intended to verify the required 3-hour fire rating for the plant walls to be con-structed of gypsum boards--confimatory item (36), Section 9.5.1.4.1 of the SER. Data provided were the results of fire tests conducted by Under-i writer Laboratories for U. S. Gypsum. The NRC staff review of this test data concluded that the configuration tested differred from the design

> proposed for installation in the Perry plant in that (1) the Perry design i uses horizontal furring strip boards and (2)-fasteners to attach the gypsum i boards to metal stubs in the walls are shorter than theddesign tested by Underwriter Laboratories. To close this confirmatory item, the staff l

I requires that the applicant further address the significance of these configuration differences in tems of meeting the 3-hour fire rated require-ment, or to perform a separate test of the exact Perry design configurction l in accordance with ASTM E-119.

l l

8208090306 820728 PDR ADOCK 05000440 i F PDR

. . .. . a "* * ** * * * * * " "*

OFFICE ) . . . . . . . .

. .. ...... .a.... . . . "-"* * * * ' " " ""*

SURNE.ME) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

.... ".* *+

DATE )

nne rosu ais oommacu am OFFICIAL RECORD COPY usm en-mm

Additional information regarding the remaining fire protection confirmatory open items (listed below) are awaited.

Confirmatory SER Section Open Item (Item No.)

Fire Protection for the fixed radio repeater 9.5.1.4.7(37)

Location of hose stations 9.5.1.5.3 ( 3fD Test data or hydraulic calculations justifying 9.5.1.5.3(38) the use of smaller than required pipe sizes in the stand pipe system Doduaentation of extinguishers 9.5.1.5.5 (39) in containment Watertight curbs of all door openings into 9.5.1.6.6 (40) the switchgear roons Finally, the two fire of the SER--f tem (15)fire protection protection outstanding safe shutdown issuesand listed in Section item (16) fire1.9 protection for the PGCC System--remain unresolved. The NPC staff review of proposed deviations to Branch Technical Position CMEB 9.5-1, Section C.5.6 for item (15), submitted by your letter dated June 16,1982, is not yet complete; closure of item (16) will be predicated on the extent to which the staff's concerns regarding to proposed use of CO2 as the fire suppressant agent in the control room (submitted in my letter dated June 9,1982), are satisfactory addressed.

Your continued and vigorous effort to resolve these remaining confirmatory open items and outstanding issues is encouraged.

Sincerely, r i A. Schwencer, Chief Lice ~nsing Branch No. 2 Division of Licensing i cc: See next page DISTRIBUTION:

l Document Control (50-440/441) l NRC PDR TNovak local PDR WJohnston NSIC VBenaroya PRC RFerguson LB#2 R/F JStang EHylton OParr JSte fa no VPanciera OELD NFioravante

/ I&E Stewis ACRS (16) BVogl er LB#IiDL LB DL su u S.t[f,a h,:ke b esc ,{w n,c,er , , , , , , , , , , ,

o4. lL.D, ..L82 1L.)...l..L82 .. . . . . . . . . .. . .. .

NRC FORM 318 (10-80) NRCM 024a OFFICIAL RECORD COPY vsa mi_3. =

, t Perry Mr. Dalwyn R. Davidson Vice President, Engineering The Cleveland Electric Illuminating Company .

P. O. Box 5000 Cleveland, Ohio 44101 cc: Gerald Charnof f, Esq. -

. Shaw, Pittman, Potts & Trowbridge 1800 M Street, N. W.

Washington, D. C. 20006 Donald H. Hauser, Esq.

The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 Resident Inspector's Office U.S.' Nuclear Regulatory Commission Pannly at Center Road Perry, Ohio 44081 Donald T. Ezzone, Esq.

Assistant Prosecuting Attorney 105 Main Street Lake County Administration Center Painesville, Ohio 44077 Daniel D. Wilt -

Wegman, Hesiler & Vanderberg 7301 Chippewa Road, Suite 102 . .

Brecksville, Ohio 44141 Ms. Sue Hiatt 0CRE Interim Repres'entative 8275 Munson Mentor, Ohio 44060 Terry lodge, Esq.

l 915 Spitzer Building Toledo, Ohio 43604 .

John G. Cardinal, Esq.

Prosecuting Attorney Ashtabula County Courthouse Jefferson, Ohio 44047 w

O