ML20062E181

From kanterella
Jump to navigation Jump to search
Submits Rept Pursuant to Tech Specs 2.19.4.a(ii) & 5.9.3.i Re 781016 Removal from Svc of Elec Fire Pump FP-1A for a Cell Suction Screening Maint & Circulating Water Pump Maint. Fire Protect Prog Now Fully Operational
ML20062E181
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/14/1978
From: Short T
OMAHA PUBLIC POWER DISTRICT
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 7812050193
Download: ML20062E181 (2)


Text

_

A s.

'*w s

4 r

7 1

-~

u.

~T.

Omaha Public Power District 1623 MARNEY a OMAMA. NESRASMA 68102 s TELEPMONE 536 4000 AREA CODE 402 Nove=ber lk, 1978 FC-602-78

,f%%,

'h

%v..$ '(g.<

V A

mA.-L t.

+

v v:S.g. \\

c Mr. K. V. Seyfrit Director of Regulatory Operations b

U. S. Nuclear Regulatory Cc==ission 4* 7# Nf,.y Region IV 611 Ryan Plaza Drive, Suite 1000

' Arlington, TV.

76012

Dear Mr. Seyfrit:

Subject:

Fire Prctection Equi;=ent Outage Docket No. 05000285 This special report is submitted pursuant to the requirements of Technical Specifications 2.19.k.a(ii) and 5.9.3.1.

Electric Fire P=p FP-1A was re=cved frc= service on Cetober 16, 1978. The initial outage of the electric fire pu=p was for "A" cell suction screen =aintenance and circulating water pu=p maintenance and not electric fire pump =aintenance, f

Cbservations of the sand depositien around the electric fire pu=p suction during the planned cell =aintenance prc=pted the C=aha Public

' Power District to proceed with a previcusly proposed =cdification to the suction of the electric fire pump.

"'his suction =cdification (Design Change Request 77-32) provided for an extensien of the elec-tric fire pu=p suction into an area of the cell where sand buildup is less likely to ec -

' e sucticn modificatien was ce=pleted and the cell retur ed to service en Neve=ber 3, 1978. The electric fire ;=p vas also returned to service and successfully tested per the weekly fire syste= surveillance test.

Curing the cutage of the electric fire pu=p the diesel driven fire p=p re=ained operable.

~he availability of the diesel driven fire p=p ensured a scurce of fire suppressien water at the Fert Calheun Station.

V l

9l' O

i l

l 7 8120 50 l93 1

i i

1

v.r. K. V. Seyfrit Psge Two Ncve=ber ik, 1973 Mr. '41111a= D. Johnsen (NRC-CIE) was centacted by telephone con-cerning this necessary extended cutage of the electric fire pump. The fire protection system at the Fort Calhoun Station is currently fully operational.

Sincerely, i.

T

",, T. E. Short Division Manager Production Operations TES/'4CJ/E s/*4GG:rge ec: le3ceuf, La=b, leiby

's

'acRae 1757 "N" Street, N.'4.

'4ashingten, DC 20036 Mr. R. L. Andrews Fort Calhoun File

$I C