Responds to 770523 NRC Ltr Re Violation Noted in Inspec Rept 50-498/77-06.Corrective Actions:Plan to Use Level I QC Inspectors for Quantitative Inspec & Inspectors Will Receive Training & Written Examinations
ML20062E074
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 09/29/1978
From: Frazar R
HOUSTON LIGHTING & POWER CO.
To: Hubacek W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20062E072 List:
References
781116, NUDOCS 7812040127
Download: ML20062E074 (2)


Text

_ _ _ _

tiOliSi.On Jl# #

h 3e Lighting 1M

& Power Scy: ember 29, 1978 COmDanV P

a J

Sr-!!L-AE-292 r

ifN,..

1 f ledric Tcr.'.cr SFN-C-0510 II@ !_dh '-.'

!!O Box f/00 h fli!.

' Gt.

Iloustoa. Teus 77001 Mr. W. G. Ilubacek U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Pla za Drive, Suite 1000 Arlington, TX 76012 RE:

RESPONSE TO NKC INSPECTION FINDINGS SOUTil TEXAS PROJECT, UNITS 1 f, 2 DOCKET NO. S0-498/77-06, ST-HL-AE-201,

?

DATED FL\\Y 23, 1977 j

SUBJECT:

UTILIZATION OF LEVEL I QC INSPECTORS FOR CONCRETE PREPLACEMENT AND PLACEMENT INSPECTION SOUTli TEXAS PROJECT ELECTRIC GENERATING STATION

Dear Mr. Ilubacek:

The purpose of this letter is to inform you of our plans relative to utilization of Level I QC Inspectors for concrete preplacement and placement inspection activities.

l We have re-evaluated our position as stated in our response to your audit of April 26-29, 1977 (Docket No. 50-498/77-06).

In October,19/7, we made an inquiry to the Joint ACI-ASME Committee on Concrete Pressure Components for Nuclear Service (SC-3C) for clarification of the Code intent.

A copy of our inquiry is attached.

To date, we have not received clarification from this committee.

(

lie plan to begin using Level I QC Inspectors for quantitative inspections in accordance with the team concept as referenced in Appendix VII - 4100 of ACI 359 - ASME Section III, Division 2,

" Proposed Standard Code for Concrete Reactor Vessels and Containments."

These inspectors will receive training including written exaninations.

Level I QC Inspectors who have cet the qualification requirenents set forth in Appendix VII - 3311 and passed the examinations will perforn inspections and tests per Table VII-4100-1.

Level II QC Inspectors will continue to evaluate inspection and test results.

It is our intention to develop this progran as soon as possible, and to begin utilizing these Level I Inspectors as soon as they complete t raining.

'i81'20 401M

~. _.

l H re,'m i:j.t.nj & Poaer Compar:v Mr. W. G.lllubacek:

-i l

Page 2 Septeaber 29, 1978 i

Level I-QC Inspectors will work under the direction of a certi-fied Level II QC Inspector, with no more than three Level I Inspectors-assigned to each Level II Inspector.

The following are exampics of quantitative inspections to be performed by Level I QC Inspectors:

Reinforcing Steel Inspection - checking for correct number, site, and spacing of bars; checking lap length, development length and concrete cover; and checking security of bars and projection of dowels.

Embed Inspection - checking for correct number, type, and

{

location of embeds; checking for bent studs, clearance between embeds and rebar, and security of embeds; and '

checking type, location, and security of waterstop, 4

i i

Formwork Inspection - checking for cicanliness, mortar

~

tightness, structural support, dimensions, and location

{}

of forms; checking type and spacing of form ties; checking j

1 for proper application of form release agents; and checking j

t location and size of chamfer strips.

i Construction Joint Inspections - checking preparation, sur-face moisture condition, location, and cleanliness of concrete construction joints.

1 i

Tendon Sheathing Inspection - checking joint preparation and physical and weather protection.

Concrete Placing - checking setup of hoppers and tremies, placing of screeds, backup placement equipment, weather pro-tection provisions, mix design, rate of placement, vertical 4

drop and lift thickness; and checking the temperature of embedded items and forms.

(

We trust that you will find this. position satisfactory. 'Should you require any further clarification or information, please advise.

Very truly yours,

,/Q2%

^-

R. A. Fr ar, Manager Quality As3 trance Depar.tment RAF: j w Attachment cc: