Text
_ _ _ _
tiOliSi.On Jl# #
h 3e Lighting 1M
& Power Scy: ember 29, 1978 COmDanV P
a J
Sr-!!L-AE-292 r
ifN,..
1 f ledric Tcr.'.cr SFN-C-0510 II@ !_dh '-.'
!!O Box f/00 h fli!.
' Gt.
Iloustoa. Teus 77001 Mr. W. G. Ilubacek U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Pla za Drive, Suite 1000 Arlington, TX 76012 RE:
RESPONSE TO NKC INSPECTION FINDINGS SOUTil TEXAS PROJECT, UNITS 1 f, 2 DOCKET NO. S0-498/77-06, ST-HL-AE-201,
?
DATED FL\\Y 23, 1977 j
SUBJECT:
UTILIZATION OF LEVEL I QC INSPECTORS FOR CONCRETE PREPLACEMENT AND PLACEMENT INSPECTION SOUTli TEXAS PROJECT ELECTRIC GENERATING STATION
Dear Mr. Ilubacek:
The purpose of this letter is to inform you of our plans relative to utilization of Level I QC Inspectors for concrete preplacement and placement inspection activities.
l We have re-evaluated our position as stated in our response to your audit of April 26-29, 1977 (Docket No. 50-498/77-06).
In October,19/7, we made an inquiry to the Joint ACI-ASME Committee on Concrete Pressure Components for Nuclear Service (SC-3C) for clarification of the Code intent.
A copy of our inquiry is attached.
To date, we have not received clarification from this committee.
(
lie plan to begin using Level I QC Inspectors for quantitative inspections in accordance with the team concept as referenced in Appendix VII - 4100 of ACI 359 - ASME Section III, Division 2,
" Proposed Standard Code for Concrete Reactor Vessels and Containments."
These inspectors will receive training including written exaninations.
Level I QC Inspectors who have cet the qualification requirenents set forth in Appendix VII - 3311 and passed the examinations will perforn inspections and tests per Table VII-4100-1.
Level II QC Inspectors will continue to evaluate inspection and test results.
It is our intention to develop this progran as soon as possible, and to begin utilizing these Level I Inspectors as soon as they complete t raining.
'i81'20 401M
~. _.
l H re,'m i:j.t.nj & Poaer Compar:v Mr. W. G.lllubacek:
-i l
Page 2 Septeaber 29, 1978 i
Level I-QC Inspectors will work under the direction of a certi-fied Level II QC Inspector, with no more than three Level I Inspectors-assigned to each Level II Inspector.
The following are exampics of quantitative inspections to be performed by Level I QC Inspectors:
Reinforcing Steel Inspection - checking for correct number, site, and spacing of bars; checking lap length, development length and concrete cover; and checking security of bars and projection of dowels.
Embed Inspection - checking for correct number, type, and
{
location of embeds; checking for bent studs, clearance between embeds and rebar, and security of embeds; and '
checking type, location, and security of waterstop, 4
i i
Formwork Inspection - checking for cicanliness, mortar
~
tightness, structural support, dimensions, and location
{}
of forms; checking type and spacing of form ties; checking j
1 for proper application of form release agents; and checking j
t location and size of chamfer strips.
i Construction Joint Inspections - checking preparation, sur-face moisture condition, location, and cleanliness of concrete construction joints.
1 i
Tendon Sheathing Inspection - checking joint preparation and physical and weather protection.
Concrete Placing - checking setup of hoppers and tremies, placing of screeds, backup placement equipment, weather pro-tection provisions, mix design, rate of placement, vertical 4
drop and lift thickness; and checking the temperature of embedded items and forms.
(
We trust that you will find this. position satisfactory. 'Should you require any further clarification or information, please advise.
Very truly yours,
,/Q2%
^-
R. A. Fr ar, Manager Quality As3 trance Depar.tment RAF: j w Attachment cc:
Messrs. E. A. Turner H. L. Key
\\
i