APPENDIX A NOTICE OF VIOLATION Philadelphia Electric Company Docket No. 50-277 Based on the results of an NRC inspection conducted on September 19-22, 1978. It appears that certain of your activities vere not conducted.in full compliance with conditions of your liRC Facility License No. DPR-44, as indicated below.
Item A is a Deficiency.
Item B is an Infraction.
A.
Technical Specification 6.8.1, states in part that, " Written pro-(
cedures... shall be established, implemented and maintained..
Contrary to the above, two prerefueling procedures, FH 21.2 and FH 5, were performed prior to completion of the prerequisites for these procedures in that: The individual steps of procedure FH 21.2 were completed by August ~31, 1978, while a prerequisite cro-cedure, M 4.18 was not completed until September 9, 1978, and the ind1vidual steas of procedure FH 5 were completed by Juiy 24, 1978, while a prerequisite procedure, M 17.1, was not completed until August 22, 1978.
B.
Technical Specification 6.8.1, states in part that, " Written Pro-cedures...shall-be established, implemented and maintained...."
Step 3.d of Procedure FH 6c, " Fuel Movements and Core Alteration Procedure during a Fuel Handling Outage", Revision 5, dated March 14, 1978, states that the grapple operator must always watch the fuel bundle during fuel transfer.
Contrary to the above, at approximately 2000 on September 21, 1978, the grapple operator failed to look at a spent fuel bundle from the time the bundle approached the upward limit of its travel during removal from the reactor core until after the first phase of its horizontal movement was completed.