Forwards IE Inspec Rept 50-213/78-26 on 781013-16 During Which No Items of Noncompliance Were Noted
ML20062D830
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/24/1978
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20062D834 List:
References
NUDOCS 7811300341
Download: ML20062D830 (2)


See also: IR 05000213/1978026

Text

- - _ _ - _ _ _ _ _ _ _ - _ _ _ - _ - - _ _ _ - _ - _ _ - _ _ _ . _ _ _ _ . _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _

l

D-~hl h

.

A" %

UNITED STATES

$

t

t

p

sf

,%,

NUCLEAR REGULATORY COMMisslON

f @ w/

q

secioni

7, gf jj

6M PARK AVENUE

o,

,O NG O F PR US$1 A, pet *iN 5Y LV ANI A WO4

g v,jg

~

,

,

f

?****

OCT 2 4 iP9

'

,

<

,

_.

Dacket No. 50-213

1

Connecticut Yankee Atomic Power Company ,

s

'

'ATIN: Mr. W. G. Counsil

'

Vice President. - Nuclear.'

Engineering and Operations t

'

P. O. Box 270

Hartford, Connecticut

06101s

,

.

Gentlemen:

-

>

Subject:

Inspection 78-26

W

'

,

s

, .

'

'

This refers to the verification tssts performed during an inspection

conducted by Dr. C. J. Paperiello of this' office on March 13-16, 1978 at

the Haddam Neck Plant of activities authbrized by NRC License No. DPR-

61.

The results of that inspection are contained in our letter dated

April 18, hich includes Office of Insoection and Enforcement

-

.

Inspectio

t No. 50-213/78-03.

.

.

The results oF cartain verification tests made at the time of that-

~

inspection are[ included in the Office of Inspection and Enforcement

>

Report which is enclosed with this letter.

Other aspects of the inspec-

tien werp previously discussed in the above referenced correspondence.

s

, 'Within the scope of this inspection, no items of noncompliance were -

ob, served.

-

s

In accorasnce with Section 2.790 of the NRC's " Rules of Practice," Part

'

2,' Title 10, Coda: of Federal Regulations, a copy of this letter andthe

-

enclosed inspection report will be placed in the NRC's Public Document

'.

Room.

If.this report contains any information that you (or your con-

tractor) believe to fce proprietary, it is necessary that'you naKe a

'

written application within 20 days to' this office to withhold 'such

information 'from public-disclusure.

Any such application must be accom-

panied by an affidavit executed by the 'cwner of the information, which

,

identifies the document'cr part soucht to be withheld, and which con-

~

tains a statement 6f reasons' which addresses with specificity the items

. _ .

which will be considered by~ the Comission as listed in subparagraph (b)

(4) of Section 2.790.

The information -sought (to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified period,

the repcrt will be-placed in the Public Document Room.

'

-

.

,

781130

.-

~

M // ro OJW /

.

/

._

J

- _ _ - - - _ _ _ _ _ _ _ - _ _ - - _ _ _ _ _ _ _ _ - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ .

..

.

-.

.

.

. _ -

..

.

_ -

_ _ _

_ -

.

- - - -

_

- -

-

_

_

_ .

,

,

k'

-

,

.

. - ,

'

i

Connecticut Yankee Atomic Power Company

%

$

'

,

No reply to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss them

with you.

,

Sincerely,

!

'

+

7

.r;

+M

eorge H. '3mfth,' Chief

A Fuel Facility and Materials Safety

-

Branch

i

.

Enclosure: Office of Inspection and Enforcement Inspection

/

'

Report Number 78-26

-

cc w/ encl:

i

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

1. R. Hinnelwright, Licensing Safeguards Engineer

i