Text
- - _ _ - _ _ _ _ _ _ _ - _ _ _ - _ - - _ _ _ - _ - _ _ - _ _ _ . _ _ _ _ . _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _
l
D-~hl h
.
A" %
UNITED STATES
$
t
t
p
sf
,%,
NUCLEAR REGULATORY COMMisslON
f @ w/
q
secioni
7, gf jj
6M PARK AVENUE
o,
,O NG O F PR US$1 A, pet *iN 5Y LV ANI A WO4
g v,jg
~
,
,
f
?****
OCT 2 4 iP9
'
,
<
,
_.
Dacket No. 50-213
1
Connecticut Yankee Atomic Power Company ,
s
- '
'ATIN: Mr. W. G. Counsil
'
Vice President. - Nuclear.'
Engineering and Operations t
'
P. O. Box 270
Hartford, Connecticut
06101s
,
.
Gentlemen:
-
>
Subject:
Inspection 78-26
W
'
,
s
, .
'
'
This refers to the verification tssts performed during an inspection
conducted by Dr. C. J. Paperiello of this' office on March 13-16, 1978 at
the Haddam Neck Plant of activities authbrized by NRC License No. DPR-
61.
The results of that inspection are contained in our letter dated
April 18, hich includes Office of Insoection and Enforcement
-
.
Inspectio
t No. 50-213/78-03.
.
.
The results oF cartain verification tests made at the time of that-
~
inspection are[ included in the Office of Inspection and Enforcement
>
Report which is enclosed with this letter.
Other aspects of the inspec-
tien werp previously discussed in the above referenced correspondence.
s
, 'Within the scope of this inspection, no items of noncompliance were -
ob, served.
-
s
In accorasnce with Section 2.790 of the NRC's " Rules of Practice," Part
'
2,' Title 10, Coda: of Federal Regulations, a copy of this letter andthe
-
enclosed inspection report will be placed in the NRC's Public Document
'.
Room.
If.this report contains any information that you (or your con-
tractor) believe to fce proprietary, it is necessary that'you naKe a
'
written application within 20 days to' this office to withhold 'such
information 'from public-disclusure.
Any such application must be accom-
panied by an affidavit executed by the 'cwner of the information, which
,
identifies the document'cr part soucht to be withheld, and which con-
~
tains a statement 6f reasons' which addresses with specificity the items
. _ .
which will be considered by~ the Comission as listed in subparagraph (b)
(4) of Section 2.790.
The information -sought (to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified period,
the repcrt will be-placed in the Public Document Room.
'
-
.
,
781130
.-
~
M // ro OJW /
.
/
._
J
- _ _ - - - _ _ _ _ _ _ _ - _ _ - - _ _ _ _ _ _ _ _ - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ .
..
.
-.
.
.
. _ -
..
.
_ -
_ _ _
_ -
.
- - - -
_
- -
-
_
_
_ .
,
,
k'
-
,
.
. - ,
'
i
Connecticut Yankee Atomic Power Company
%
$
'
,
No reply to this letter is required; however, should you have any
questions concerning this inspection, we will be pleased to discuss them
with you.
,
Sincerely,
!
'
+
7
.r;
+M
eorge H. '3mfth,' Chief
A Fuel Facility and Materials Safety
-
Branch
i
.
Enclosure: Office of Inspection and Enforcement Inspection
/
'
Report Number 78-26
-
cc w/ encl:
i
R. Graves, Plant Superintendent
D. G. Diedrick, Manager of Quality Assurance
1. R. Hinnelwright, Licensing Safeguards Engineer